A comprehensive vocabulary review of disaster planning, emergency response, operational resumption, and archival preservation management based on Guy Robertson's Disaster Planning for Libraries and Mary Lynn Ritzenthaler's Preserving Archives and Manuscripts.

242 Terms

1
New cards

Risk Profile

The complete spectrum or range of risks and potential hazards that exist at a particular library site or sites.

2
New cards

Natural Risks

Hazards resulting from natural phenomena that affect every geographical location on Earth, requiring site-specific mitigation rather than relocation.

3
New cards

Water Ingress

The seepage, entry, or infiltration of water into a building through open windows, leaking roofs, clogged drainage systems, or sewer backups.

4
New cards

Secondary Risks

Subsequent hazards triggered by an original disaster event that can often cause equal or greater damage than the initial incident.

5
New cards

Technological Risks

Failures, breakdowns, or malfunctions involving machinery, equipment, utilities, physical infrastructure, and electronic communication systems.

6
New cards

Power Spike (Surge)

A transient electrical overload or voltage surge that can overwhelm connected electrical systems and cause hardware to burn out.

7
New cards

Telecommunications Overloading

System congestion that occurs when call and message volumes exceed network capacity during regional emergencies, elections, or major holidays.

8
New cards

Line Breakage

Physical severance or damage to communication lines caused by storms, high winds, seismic movement, excavation, or intentional sabotage.

9
New cards

Human-Caused Risks

Hazards and disruptions arising directly from human actions, behavioral mistakes, carelessness, or intentional violence.

10
New cards

Apathy (Risk Foundation)

The chronic postponement or neglect of an important disaster preparedness or maintenance task due to a lack of motivation.

11
New cards

Proximity Risks

Hazards that originate outside the library from surrounding properties, roadways, commercial centers, fuel stations, or geographical features.

12
New cards

Enterprise Risks

Threats concerning the organizational, political, and financial viability of a library, including budget cuts, strikes, and leadership loss.

13
New cards

Authorization (Disaster Planning)

Formal managerial approval, direction, and oversight required within an institution's administrative hierarchy to initiate disaster planning.

14
New cards

Risk Assessment and Analysis (RAA)

A formal evaluation process that identifies existing library risks, calculates their likelihood, and assesses their potential damage.

15
New cards

Business Impact Analysis (BIA)

An analytical component of risk assessment examining the operational and financial consequences of service disruptions on an organization.

16
New cards

History-Taking (RAA Step One)

The initial phase of an RAA focused on examining administrative logs, board minutes, and employee accounts to uncover historical site risks.

17
New cards

Walkabout (RAA Step Two)

A systematic, observant physical inspection of the library grounds, perimeter, exterior, and interior building systems.

18
New cards

Staff Interviews (RAA Step Three)

Consultations conducted across all organizational levels to gather practical, front-line observations regarding facility hazards.

19
New cards

External Experts (RAA Step Four)

Outside specialists—such as firefighters, police, engineers, and insurance adjusters—consulted to contribute specialized technical safety evaluations.

20
New cards

Preventative Maintenance Program (PMP)

A proactive, ongoing maintenance regime designed to inspect, service, and repair facility components before catastrophic structural failure occurs.

21
New cards

Problem Spotters

Library staff members trained to routinely observe, identify, and promptly report emerging physical hazards, leaks, and maintenance defects.

22
New cards

Gradual Facility Replacement

A long-term mitigation strategy focused on budgeting and planning to decommission and replace aging, structurally unsafe buildings.

23
New cards

Data Backup System

An organized protocol requiring designated oversight, reliable media, regular scheduling, off-site storage, and routine recovery testing.

24
New cards

Staff Preparedness Characteristics

Workplace attributes of well-prepared institutions, including high morale, open communication, and active participation in safety training.

25
New cards

Human Safety Priority

The foundational emergency principle establishing that the physical protection of human life always takes precedence over property and collections.

26
New cards

Disaster Response Plan

A concise, clear operational guide designed to direct immediate protective and evacuation actions during an emergency.

27
New cards

Brevity (Response Plan Feature)

The design principle requiring disaster plans to be short and direct so personnel can locate vital information rapidly without confusion.

28
New cards

Pre-Disaster Vendor Agreements

Advance contractual arrangements established with suppliers to ensure the prompt replacement of damaged books, hardware, and equipment.

29
New cards

Alternative Operating Location

A pre-arranged external facility designated to house essential administrative and public functions if primary premises become unusable.

30
New cards

Emotional Numbness

A psychological reaction observed during disasters characterized by emotional detachment, shock, or a temporary inability to process events.

31
New cards

Existing Library Hierarchy (Response Team)

The operational practice of deploying established administrative supervisory lines as the default disaster response team.

32
New cards

Management Team (Response)

A specialized executive group responsible for overall leadership, strategic decisions, and policy coordination during an incident.

33
New cards

Operations and Facilities Clean-Up Team

A response squad tasked with overseeing initial site safety, clearing debris, and managing facility cleanup operations.

34
New cards

Emergency Conservation Team

A designated group trained to triage, stabilize, handle, and salvage damaged collection materials following a disaster.

35
New cards

Operational Resumption

The post-disaster planning framework and execution process aimed at restoring a library to its normal functioning state.

36
New cards

Resumption Plan

A practical action plan outlining damage assessments, cleanup protocols, communication channels, and staffing to restore standard services.

37
New cards

Damage Assessment Procedures

Standardized inspection steps carried out to verify and record the nature, physical extent, and severity of disaster damage.

38
New cards

Disaster Declaration Procedures

Formal administrative protocols followed by leadership to determine whether operational destruction warrants an official disaster declaration.

39
New cards

Normalization Programmes

Structured post-disaster management activities intended to guide personnel, patrons, and workflows gradually back to routine operations.

40
New cards

Continuity Plan

A strategic protocol designed to sustain mission-critical library functions and access to vital records during prolonged, catastrophic disruptions.

41
New cards

Multi-Layered Data Management

A continuity strategy ensuring vital electronic records and databases remain retrievable across multiple, geographically separated servers.

42
New cards

Clean Teams

Specialized personnel trained to operate securely in isolated or sanitary facilities during prolonged pandemics or bio-hazard events.

43
New cards

Recovery (Disaster Planning)

Long-term administrative planning dealing with major structural destruction, complete facility rebuilding, permanent system overhauls, and staffing changes.

44
New cards

Total Loss Decision

The administrative conclusion that building damage is so extensive that demolition and rebuilding are necessary rather than repair.

45
New cards

Living Document

A concept stating that disaster plans must never remain static binders, but must undergo continual testing, review, and refinement.

46
New cards

Damaged Item Security Team

A response unit assigned to guard valuable, historic, or vulnerable materials from looting and exposure during post-disaster recovery.

47
New cards

Damage Assessment

A four-part evaluative process comprising observation, evaluation, prioritization, and record-keeping conducted after a disaster.

48
New cards

Observation (Damage Assessment)

The use of sight, hearing, smell, and touch to identify physical hazards, water damage, structural cracking, and chemical leaks.

49
New cards

Biblio-Triage

The systematic sorting of damaged collection materials into defined recovery categories to prioritize salvage, repair, or disposal.

50
New cards

Severe Damage (Biblio-Triage)

The triage status designating collection items that are unrecognizable, structurally destroyed, and completely beyond repair.

51
New cards

Serious Damage (Biblio-Triage)

The triage category for collection items that can only be partially salvaged and repaired at an exceptionally high financial cost.

52
New cards

Moderate Damage (Biblio-Triage)

The triage status for items that can be repaired physically, but cannot be returned to their pre-disaster original condition.

53
New cards

Light Damage (Biblio-Triage)

The triage classification for items that can be repaired and completely restored to acceptable condition at a reasonable cost.

54
New cards

Full Clean-and-Mend

A conservation category for structurally sound materials that require soil removal and mechanical repairs to bindings, leaves, or covers.

55
New cards

Normal Clean-and-Mend

The biblio-triage rating indicating that an item remains in acceptable pre-disaster condition and requires no special conservation attention.

56
New cards

Conservator (Damage Assessment)

A qualified preservation expert possessing specialized knowledge of materials degradation, conservation treatment costs, and salvage methodologies.

57
New cards

Structural Integrity Priority

The second-ranked post-disaster priority, following human safety, focused on confirming the stability of load-bearing walls, foundations, and roofs.

58
New cards

Digital Photography in Damage Assessment

The use of mobile phone cameras and portable electronics to quickly capture and transmit visual evidence of site damage to adjusters.

59
New cards

Disaster (Robertson General Definition)

An event involving facility damage disrupting operations for over 48 hours48\text{ hours}, transit disruption exceeding 48 hours48\text{ hours}, or severe data loss.

60
New cards

Mission-Critical Information

Essential operational or reference holdings whose unavailability causes immediate institutional paralysis, lowering the threshold for disaster declaration.

61
New cards

Four Notification Steps

The notification sequence alerting immediate staff, broad personnel, external administrative stakeholders, and lastly the public.

62
New cards

Crisis (Disaster Planning)

A state of negative media attention and adverse public relations arising during or in the wake of an operational disaster.

63
New cards

Single-Site Event

A disaster incident whose physical and operational consequences are entirely confined to one library building.

64
New cards

Library Crisis Manager

The designated senior spokesperson responsible for communicating official statements to the press, governing authorities, and patrons during a crisis.

65
New cards

Grace Under Pressure

An essential leadership trait characterized by calmness, professional composure, and clear communication while under intense crisis scrutiny.

66
New cards

Media Ambush

An unannounced situation where reporters confront library personnel on-site, demanding immediate explanations before verified facts are available.

67
New cards

Truthfulness (Crisis Communication)

The mandatory policy of delivering factual statements without exaggeration, concealment, or dishonesty to preserve institutional credibility.

68
New cards

Social Engineering

The use of deceptive, manipulative interpersonal techniques to trick authorized employees into disclosing confidential information or access credentials.

69
New cards

Strategic Alliance

A formal, pre-arranged agreement established between a library and an external contractor to secure rapid professional assistance following a disaster.

70
New cards

Best-Efforts Clause

A contractual provision wherein both the library and external vendor pledge to make their maximum feasible effort during emergencies.

71
New cards

Moisture Control Vendor

A specialized commercial partner equipped with industrial dehumidifiers and air movers to remediate flood and fire-suppression water damage.

72
New cards

Alternative Site Vendor

A contracted partner providing commercial space or temporary mobile facilities to maintain library operations during primary building closures.

73
New cards

General Contractor (Strategic Alliance)

A licensed builder or maintenance company retained to perform emergency stabilization, electrical repairs, and physical reconstructions.

74
New cards

Employee Assistance Program (EAP) Provider

A professional psychological support organization contracted to deliver counseling and mental health services to disaster-affected personnel.

75
New cards

Removal Company (Strategic Alliance)

A professional transport service retained to pack, move, and store heavy furniture, IT hardware, and collection items safely.

76
New cards

Strategic Alliance Documentation

A written, legally binding document detailing vendor obligations, hourly pricing schedules, guaranteed response times, and facility access permissions.

77
New cards

Annual Alliance Audit

A yearly administrative review conducted by the facilities manager to update vendor contacts, inventory capabilities, and contractual rates.

78
New cards

System-Wide Strategic Alliance Vendor

A large contractor possessing sufficient staff, vehicles, and equipment to service both a central library and outlying branches simultaneously.

79
New cards

Twenty-Mile Threshold (Branches)

The geographic distance beyond which a branch library should establish local vendor alliances rather than relying solely on central contracts.

80
New cards

Going It Alone Fallacy

The mistaken assumption that a large library system has sufficient internal staff and equipment to handle disaster recovery without external vendors.

81
New cards

Convergence

The post-disaster phenomenon where patrons, displaced residents, and curious citizens spontaneously gather around a damaged library facility.

82
New cards

Cordons and Signage

Physical barricades, such as yellow barrier tape, and posted notices installed to delineate hazardous perimeter boundaries and restrict public access.

83
New cards

Illicit Entry (Patron Assistance)

Unauthorized, well-intentioned trespassing by patrons entering a closed, damaged library building attempting to assist staff with salvage.

84
New cards

Cast-Off Donations

Unsolicited, discarded books and magazines brought in by well-meaning patrons that create severe sorting, sanitation, and storage burdens.

85
New cards

Friends of the Library (Post-Disaster Role)

A natural source of post-disaster volunteers best limited to non-technical, auxiliary roles such as book reshelving and message center duties.

86
New cards

Post-Disaster Emergency Information Programmes

Community outreach services established in safe facilities to guide citizens toward government relief, shelter, and medical assistance.

87
New cards

Message Centres

Temporary community information stations established with bulletin boards to facilitate public communication during widespread telecom outages.

88
New cards

Six Patron Management Principles

The core post-disaster patron framework comprising Protect, Communicate, Reassure, Update, Manage, and Support.

89
New cards

Positive Patron Updates

Public notices crafted to emphasize tangible restoration progress and reopening dates rather than detailing depressing destruction.

90
New cards

Unkept Donation Pledges

Spontaneous monetary offers made by patrons during emotional crisis highs that fail to materialize into actual financial gifts.

91
New cards

Normalization

The collective consensus among staff that operations have returned to normal and that permanent post-disaster workplace changes are acceptable.

92
New cards

Incomplete Normalization

An unresolved post-disaster organizational state leading to persistent absenteeism, employee resignations, decreased productivity, and stress.

93
New cards

72-Hour Debriefing

An initial managerial meeting held approximately 72 hours72\text{ hours} post-disaster to process staff experiences and address emerging problems.

94
New cards

Recovery Period (Employees)

A recognized transitional phase following a disaster during which staff members are acknowledged to be temporarily less productive.

95
New cards

Rap and Wrap Sessions

Concluding debriefing meetings held to celebrate operational restoration, acknowledge staff contributions, and mark the end of recovery.

96
New cards

Agitated Patron Management

A frontline communication strategy emphasizing patience, diplomatic de-escalation, and a firm refusal to argue with distressed patrons.

97
New cards

Personal Touch (Normalization)

The deliberate relaxation of rigid administrative rules and formalities when assisting long-term patrons coping with post-disaster distress.

98
New cards

Downtime Backlogs

Accumulated arrears in cataloging, acquisitions, and processing caused by operational downtime that hinder workflow restoration.

99
New cards

Post-Disaster Rumors (Internal)

Unverified gossip regarding potential layoffs, salary cuts, or permanent branch closures that severely undermines staff morale.

100
New cards

Staff Recognition (Post-Disaster)

The formal managerial celebration and publication of staff recovery contributions in newsletters, intranets, and awards.