Lecture 8 - Variable Control Charts

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/39

encourage image

There's no tags or description

Looks like no tags are added yet.

40 Terms

1
New cards

1. What is the first major step when developing a control chart?

A. Compute process capability
B. Prepare
C. Remove all out-of-control points
D. Calculate ARL

B. Prepare

2
New cards

2. During the “Prepare” stage, which of the following should be determined?

A. How data will be collected, sample size, and sampling frequency
B. Only the process mean
C. Only the number of defects
D. Whether all products meet specifications

A. How data will be collected, sample size, and sampling frequency

3
New cards

3. Which of the following occurs during the data collection stage?

A. Eliminate the entire process
B. Set customer specifications
C. Record data and calculate appropriate statistics
D. Calculate only process capability

C. Record data and calculate appropriate statistics

4
New cards

4. According to the lecture, where is a useful place to apply a control chart?

A. Only after the customer receives the product
B. Before a costly or irreversible step
C. Only after the entire process is finished
D. Only when a defect has already occurred

B. Before a costly or irreversible step

5
New cards

5. After trial control limits are calculated, the next major task is to:

A. Analyze and interpret the results
B. Immediately eliminate the control chart
C. Change the specification limits
D. Stop collecting data

A. Analyze and interpret the results

6
New cards

6. If out-of-control points are identified while establishing a control chart, the slides indicate that you may need to:

A. Ignore them permanently
B. Increase every observation
C. Eliminate the out-of-control points and recompute control limits
D. Replace the UCL with the specification limit

C. Eliminate the out-of-control points and recompute control limits

7
New cards

7. In a service operation, a “defect” is best described as:

A. Any service that takes more than one minute
B. A failure to meet customer requirements
C. Any customer complaint regardless of the service
D. Only a physical product failure

B. A failure to meet customer requirements

8
New cards

8. Which would be an appropriate SPC measure for an airline?

A. Flight delays
B. Metal thickness
C. Bolt diameter
D. Paint viscosity

A. Flight delays

9
New cards

9. Which of the following is an example of an SPC measure for a distribution operation?

A. Customer support response time
B. Employee shoe size
C. Office wall color
D. Building height

A. Customer support response time

10
New cards

10. A stable process is one in which the observed variation is primarily:

A. Special cause variation
B. Assignable variation
C. Random/common cause variation
D. Nonrandom variation

C. Random/common cause variation

11
New cards

11. Which condition would generally indicate that a process is out of control?

A. One point falls beyond a control limit
B. Every point equals the center line
C. All points remain within one standard deviation
D. The sample size stays constant

A. One point falls beyond a control limit

12
New cards

12. A sudden change in the process average is called a:

A. Cycle
B. Trend
C. Shift
D. Mixture

C. Shift

13
New cards

13. A control chart shows a repeated up-and-down pattern at regular intervals. Which pattern is this?

A. Cycle
B. Shift
C. Mixture
D. Center-line hugging

14
New cards

14. A gradual increase or decrease in observations over time is called a:

A. Shift
B. Trend
C. Cycle
D. Mixture

15
New cards

15. Which rule suggests a potential shift in the process?

A. 2 points on opposite sides of the center line
B. 3 points inside the C-zone
C. 8 consecutive points on one side of the center line
D. 1 point exactly on the center line

16
New cards

16. Which zone is located between the 2σ and 3σ lines?

A. C-Zone
B. B-Zone
C. A-Zone
D. Green Zone

C. A-Zone

17
New cards

17. Warning limits, when used, are typically placed approximately how far from the mean?

A. ±1σ
B. ±2σ
C. ±3σ
D. ±6σ

B. ±2σ

18
New cards

18. Average Run Length (ARL) is calculated using:

ARL=1pARL=\frac{1}{p}

If the probability of a point exceeding the control limits is 0.0027, approximately what is the ARL?

A. 37
B. 100
C. 270
D. 370

D. 370

19
New cards

19. If the probability of an out-of-control signal is p=0.01p=0.01, what is the Average Run Length?

A. 10 samples
B. 100 samples
C. 1,000 samples
D. 0.01 samples

B. 100 samples

20
New cards

20. In a pre-control chart, what action should be taken if one observation falls in the red zone?

A. Continue the process without taking action
B. Increase the sample mean
C. Stop and adjust the process to remove variation, then return to setup rules
D. Move the specification limits outward

C. Stop and adjust the process to remove variation, then return to setup rules

21
New cards

21. When designing a control chart, which two sampling decisions must be specified?

A. Sample mean and median
B. Sample size and sampling frequency
C. UCL and specification limit
D. Range and standard deviation only

B. Sample size and sampling frequency

22
New cards

22. What is an advantage of using a larger sample size?

A. It makes small process shifts easier to detect
B. It guarantees the process will be in control
C. It eliminates special causes
D. It eliminates the need for control limits

A. It makes small process shifts easier to detect

23
New cards

23. Current control-chart practice generally favors:

A. Very large samples collected rarely
B. One sample at the end of production
C. Smaller samples collected more frequently
D. Samples only when a defect occurs

C. Smaller samples collected more frequently

24
New cards

24. What does Average Run Length (ARL) represent?

A. The average number of defective products
B. The average number of samples before a point plots outside the control limits
C. The number of observations within one sample
D. The width between the UCL and LCL

B. The average number of samples before a point plots outside the control limits

25
New cards

25. Which formula is used to calculate Average Run Length?

A. ARL=pARL=p

B. ARL=1−pARL=1-p

C. ARL=p1ARL=\frac{p}{1}

D. ARL=p1​

D. ARL=p1​

26
New cards

26. If p=0.005p=0.005, what is the ARL?

A. 50
B. 100
C. 200
D. 500

C. 200

27
New cards

27. A control chart has an ARL of 500. What is the probability pp that a point exceeds the control limits?

A. 0.002
B. 0.02
C. 0.20
D. 0.50

A. 0.002

28
New cards

28. With traditional ±3σ control limits and p=0.0027p=0.0027, the approximate ARL is:

A. 37
B. 270
C. 370
D. 997

C. 370

29
New cards

29. An ARL of 370 means that even if the process remains in control:

A. Every 370th product will definitely be defective
B. An out-of-control signal is expected approximately once every 370 samples on average
C. The process must be stopped after 370 samples
D. Exactly 370 observations must be taken per sample

B. An out-of-control signal is expected approximately once every 370 samples on average

30
New cards

30. What is a major difference between a run chart and a control chart?

A. Run charts have two UCLs
B. Run charts always use specification limits
C. Run charts do not have control limits
D. Run charts cannot show changes over time

C. Run charts do not have control limits

31
New cards

31. Run charts are primarily used to:

A. Monitor changes in a particular process characteristic over time
B. Calculate specification limits
C. Determine customer satisfaction only
D. Calculate process capability directly

A. Monitor changes in a particular process characteristic over time

32
New cards

32. Which statement correctly describes pre-control charts?

A. Their limits are based on ±3σ
B. Their limits are based on specifications
C. They can only be used for attribute data
D. They require an incapable process

B. Their limits are based on specifications

33
New cards

33. What important assumption must be satisfied before using a pre-control chart?

A. The process must already be capable
B. The standard deviation must equal zero
C. All measurements must be identical
D. The process must already be out of control

A. The process must already be capable

34
New cards

Pre-control charts can be particularly useful for:

A. Short runs and setups
B. Calculating employee salaries
C. Long-term financial forecasting
D. Eliminating all inspections

A. Short runs and setups

35
New cards

A disadvantage of pre-control charts mentioned in the lecture is that they can:

A. Never identify process problems
B. Generate false signals
C. Only be used in hospitals
D. Require no specifications

B. Generate false signals

36
New cards

In a pre-control chart, two consecutive observations both fall in the GREEN zone. What should you do?

A. Stop the process
B. Adjust the process average
C. Continue the process
D. Recalculate the specification limits

C. Continue the process

37
New cards

One observation falls in the GREEN zone and the next falls in a YELLOW zone. What is the appropriate action?

A. Continue
B. Stop immediately
C. Remove the observation
D. Adjust the process average immediately

A. Continue

38
New cards

38. Two consecutive points fall in the SAME yellow zone. According to the pre-control run rules, you should:

A. Ignore both points
B. Adjust the process average
C. Remove the specification limits
D. Continue with no action

B. Adjust the process average

39
New cards

39. Two consecutive observations fall in OPPOSITE yellow zones. What should be done?

A. Continue normally
B. Increase the sample size only
C. Stop and adjust the process to remove variation
D. Adjust only the process average

C. Stop and adjust the process to remove variation

40
New cards

40. Which of the following pre-control situations requires stopping the process, removing variation, and returning to the setup rules?

A. Both observations are green
B. One observation is green and one is yellow
C. One observation falls in the red zone
D. Both observations are on the nominal value

C. One observation falls in the red zone