1/29
Looks like no tags are added yet.
TRUE
The four primary functions of management are planning, organizing, leading (directing), and controlling.
FALSE
In a functional organizational structure, employees have dual reporting lines to both a project manager and a department head.
FALSE
Operational planning focuses on the long-term, high-level strategic goals of an entire engineering corporation over a 5-to-10-year horizon.
FALSE
When an engineering manager delegates authority to a team leader, the manager is completely absolved of ultimate accentability for the project's failure.
TRUE
Directing (Leading) involves influencing, guiding, and motivating employees to perform their tasks effectively to achieve organizational goals.
TRUE
Staffing is a sub-function of organizing that involves recruiting, selecting, training, and placing the right talent into designated engineering roles.
FALSE
Decentralization means that all major decision-making power is strictly retained at the top executive levels of an engineering organization.
FALSE
Technical skills become more critical than conceptual and human relations skills as an engineer moves higher up into top-tier executive management positions.
TRUE
The "controlling" function of management involves comparing actual performance against pre-established standards and implementing corrective actions when deviations occur.
FALSE
The exploration phase of the mine project lifecycle typically requires the largest capital expenditure (CapEx) compared to the construction phase.
TRUE
The economie "cut-off grade" is defined as the lowest grade of mineralized material that can be mined and processed at a profit.
TRUE
If the global market price of a mined commodity decreases significantly, the economic cut-off grade of the mine must increase to maintain profitability.
FALSE
In open-pit mining, a high stripping ratio indicates that very little waste rock needs to be removed to access a single unit of economic ore.
TRUE
Long-term mine planning is primarily concerned with maximizing the Net Present Value (NPV) of the mineral deposit over the entire Life of Mine (LOM).
FALSE
According to the standard Hierarchy of Hazard Controls in mine safety, Personal Protective Equipment (PPE) is considered the most effective control measure.
FALSE
Mine tailings are the valuable, highly concentrated mineral products shipped directly to buyers for smelting and refining.
TRUE
Under the Philippine Mining Act of 1995 (RA 7942), mining companies are legally required to establish a fund for environmental protection and progressive mine rehabilitation.
TRUE
Short-term-mine planning typically handles operational activities like shift-by-shift equipment dispatch and daily ore blending to meet mill specifications.
FALSE
A mine's "Social License to Operate" is a formal, written legal permit issued exclusively by national environmental departments like the DENR.
TRUE
Post-closure monitoring involves tracking water, soil, and air quality around a decommissioned mine site for decades to prevent issues like acid mine drainage.
TRUE
Progressive rehabilitation refers to the practice of restoring mined-out land blocks while other areas of the mine are still aetively operating.
TRUE
Grade control is a strategic, long-term mining activity that determines the ultimate pit limit boundaries decades in advance.
FALSE
Feasibility studies are completed after the construction of the processing plant to evaluate whether the operational machinery is working efficientiy.
FALSE
Henri Fayel, a French mining engineer, is widely considered the "Father of Scientific Management for his time-and- motien studies in the early 20th century.
TRUE
The field of engineering management grew rapidly during and after World War Il due to the need to manage massive complex military-industrial projects like the Manhattan Project.
FALSE
Stretegic planning deals with short-term, day-to-day operations and task assignments within an engineering department.
TRUE
Staffing is considered a sub-function of organizing that involves matching human technical skills with specific structural requirements.
FALSE
The primary objective of the controlling function is to discipline workers who fail to meet engineering design deadlines.
FALSE
The formalization of engineering management as a distinct academic discipline began primarily in the early 19th century alongside the invention of the steam engine.
TRUE
A contingency plan" is an alternative strategy drafted in advance to be executed if a project's primary plan fails due to unexpected disruptions.