COSC 253 EXAM II

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/29

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 4:07 AM on 10/7/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

30 Terms

1
New cards

who invented concrete

The ancient Romans

2
New cards

what are the three main ingredients in concrete

  1. Portland cement 2. Aggregates (sand and gravel/crushed stone, coarse and fine) 3. Water


3
New cards

what are 3 benefits of air entraining

  1. Improves resistance to freezing and thawing 2. Improves workability 3. Reduces segregation and bleeding


4
New cards

what are the three effects of lowering the water content of concrete

  1. Increases strength 2. Increases density 3. Reduces shrinkage during curing


5
New cards

what is the main cause of segregation in concrete placements


Excessive vibration, moving concrete too far horizontally, or dropping it through obstructed spaces. This causes coarse aggregates to separate from the cement paste

6
New cards

list four ways concrete and rebar complement one another

  1. Concrete resists compression; steel resists tension 2. Concrete protects steel from fire 3. Concrete protects steel from corrosion 4. Both have similar rates of thermal expansion


7
New cards

what are three methods used to splice rebar (combining rebar together)

  1. Lap splicing (overlapping bars) 2. Welding 3. Mechanical splicing (couplers/sleeves)


8
New cards

how are chairs and bolsters different

Chairs support one or two reinforcing bars at specific points individuals to keep rebar off ground. Bolsters are long supports that hold multiple bars across slabs or wide beams to keep rebar off the ground

9
New cards

what is concrete creep


The gradual, permanent shortening of concrete under sustained stress from its own weight, weight of other building components, or force of prestressing

10
New cards

what are two differences between prestressing and posttensioning


  1. Pretensioning tensions steel BEFORE concrete is poured; posttensioning tensions steel AFTER concrete has hardened 2. Pretensioning is generally done in precast plants; posttensioning is generally done on-site


11
New cards

what are seven steps in creating a slab-on-grade, in order?

  1. Prepare and compact the subgrade 2. Place compacted crushed stone (capillary break) 3. Install edge forms and vapor retarder 4. Place reinforcing steel or welded wire mesh 5. Pour and consolidate concrete 6. Screed, float, and finish the surface 7. Cure the concrete


12
New cards

what is the different between control joints and expansion joints

Control joints create weakened sections to control where shrinkage cracks occur in visually acceptable patterns. Expansion joints completely separate concrete sections from adjacent elements to allow larger movement from temperature changes, settlement, or loading.

13
New cards

what do form ties do

Form ties hold opposite sides of wall formwork together, maintain proper wall thickness, and resist the pressure of wet concrete

14
New cards

when would a two-way slab be chosen as opposed to a one-way slab

When column bays are square or nearly square, allowing loads to be carried in both directions. Two-way slabs can be thinner, use less steel, and cost less

15
New cards

name three methods used to reduce traditional framework

  1. Tilt-up construction 2. Shotcrete 3. Insulating concrete forms (ICFs) that remain permanently in place


16
New cards

name 4 advantages of precast concrete as opposed to site cast

Faster construction and installation 2. Better quality control in factories 3. Less on-site formwork 4. Construction can continue during unfavorable weather

17
New cards

what are two ways to cure concrete

  1. Moist curing (keeping concrete wet using water or damp coverings) 2. Membrane curing (using plastic sheets or liquid curing compounds to retain moisture)


18
New cards

what are bull floats and darbies used for

To flatten, smooth, and consolidate the surface of freshly placed concrete during initial finishing

19
New cards

what are three benefits of a concrete topping over precast elements

  1. Creates a smooth and level surface 2. Connects precast elements into a unified structure 3. Improves structural performance by providing composite action


20
New cards

what are two benefits of insulated concrete forms

  1. Provide permanent thermal insulation and improve energy efficiency 2. Reduce the need for removing traditional formwork because the forms remain in place


21
New cards
  1. will give you a rebar number and you give the diameter (formula)


Rebar diameter (inches) = Rebar number / 8

22
New cards
  1. what are three benefits of using fly ash in concrete mixture


  1. Increases concrete strength 2. Reduces permeability 3. Improves workability. It also reduces cement consumption and environmental impact


23
New cards

what are 5 ways to improve the environmental impact of concrete


  1. Replace some Portland cement with fly ash or slag 2. Use recycled aggregates 3. Use recycled steel reinforcement 4. Reduce cement consumption through efficient concrete design 5. Improve cement manufacturing efficiency to reduce energy use and emissions


24
New cards

describe what each part of the welded wire reinforcement designation means: 8x12 D12xW7

8 = longitudinal wire spacing of 8 inches; 12 = transverse wire spacing of 12 inches; D12 = deformed wire with an area of 0.12 square inches; W7 = smooth wire with an area of 0.07 square inches

25
New cards

what is an organized system of joints in a slab that allow cracking to occur in a neat and visually acceptable pattern

Contraction joints, also called control joints

26
New cards

what is laid over crushed stone to protect a slab from moisture from the ground

A vapor retarder, usually a heavy plastic sheet.

27
New cards

i will give you a concrete slab plan and section and you will give the total amount of concrete needed

Concrete volume = Length × Width × Thickness. Convert all dimensions to feet. For cubic yards: Volume (yd³) = Length (ft) × Width (ft) × Thickness (ft) ÷ 27. Add the volumes of thickened edges, grade beams, or footings separately without double-counting overlapping concrete.

28
New cards

how many days until concrete reaches full strength after placement

28 days. Reaches its full design strength after 28 days, but strength can continue increasing afterward

29
New cards

what are the methods used to imprint decorative finishes on concrete

Stamping patterns into fresh concrete and using textured form liners or boards to transfer patterns onto concrete surfaces

30
New cards
  1. what is the time a concrete truck should be in transit, ideally?


Approximately 90 minutes maximum from the introduction of mixing water to completion of placement, according to the provided foundation plans.