BA 101: Production & Operations

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/45

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering production and operations management concepts, manufacturing processes, facility layouts, inventory management, quality systems, project management tools, and business simulation decisions from BA 101 Class 7.

46 Terms

1
New cards

Production

Creating goods using land, labor, materials, capital, entrepreneurship, and knowledge.

2
New cards

Production management

Activities managers perform to help a firm create goods.

3
New cards

Operations management

Managing the transformation of resources into goods and services; includes scheduling, inventory, quality, and follow-up.

4
New cards

Operations management goals

Meet customer demand with high-quality products, efficient processes, fewer delays, and lower costs.

5
New cards

Inputs to production

Land, labor, materials, capital, entrepreneurship, and knowledge.

6
New cards

Production control steps

Planning, routing, scheduling, dispatching, and follow-up.

7
New cards

Outputs of operations

Goods, services, and ideas.

8
New cards

Process manufacturing

Physically or chemically changing materials, such as shaping plastic using heat and pressure.

9
New cards

Assembly process

Putting separate components together, such as assembling parts into a hot tub.

10
New cards

Continuous production

Long runs producing goods over time, such as a beverage bottling line producing identical bottles all day.

11
New cards

Intermittent production

Short runs with frequent machine adjustments to make different products or custom orders in short batches.

12
New cards

Supply chain

Connected suppliers, production sites, transport, and distribution steps that move materials and products.

13
New cards

Hot tub case study

A lecture example illustrating a supply chain requiring about 1,8501{,}850 parts sourced across 77 countries and 1414 states arriving by container ship, truck, and train.

14
New cards

Supply-chain bottleneck

A shortage or delay at one stage that slows the rest of production or delivery.

15
New cards

CAD (Computer-Aided Design)

Computer software used to design products, including accurate 2D2\text{D} and 3D3\text{D} drawings.

16
New cards

CAM (Computer-Aided Manufacturing)

Computers used to control or support the manufacturing of products.

17
New cards

CAD versus CAM

CAD designs the product, whereas CAM helps manufacture it.

18
New cards

CIM (Computer-Integrated Manufacturing)

The integration of CAD and CAM; it is costly but can sharply reduce machine-programming time.

19
New cards

Flexible manufacturing

Designing machines to switch tasks or make different products with relatively quick adjustments.

20
New cards

Mass customization

Making products at scale while tailoring selected features to individual customers, such as customizing shoe colors while the underlying shoe design stays standardized.

21
New cards

Robotics benefits

Can operate around the clock, perform repetitive work, lower labor costs, and improve consistency in manufacturing.

22
New cards

Sensors in manufacturing

Devices that detect production problems quickly so adjustments or changes can be made.

23
New cards

Nanomanufacturing

Manipulating materials at the molecular level.

24
New cards

Facility location

Choosing where operations occur, taking into account costs, labor, suppliers, and logistics.

25
New cards

Outsourcing

Using outside companies to perform work or supply goods or services.

26
New cards

Remote work

Performing work away from the workplace using computers and communication technology.

27
New cards

Facility layout

The physical arrangement of workers, equipment, and resources for efficient production or service.

28
New cards

Assembly-line layout

A layout where workers or stations each perform a small number of repeated tasks as products move along.

29
New cards

Modular layout

A layout where teams or work cells produce more complex units of the final product.

30
New cards

Fixed-position layout

A layout where the product stays in one place while workers and equipment come to it, such as when building an aircraft or a large ship.

31
New cards

Purchasing

Finding high-quality materials and suppliers and negotiating favorable prices.

32
New cards

Inventory control

Managing how much material or stock is held and when to replenish it.

33
New cards

JIT (Just-in-Time) inventory

An inventory strategy of keeping minimal inventory and receiving parts right when needed for production.

34
New cards

JIT requirement and risk

Requires excellent supplier coordination and reliable delivery timing; carries the risk that a delayed shipment can halt production because little backup inventory is stored.

35
New cards

ERP (Enterprise Resource Planning)

Integrated software for coordinating business information and resources across departments.

36
New cards

Materials requirements planning

Determining what materials are needed, how much, and when for planned production.

37
New cards

Quality control

Ensuring products consistently meet customer needs and reducing errors.

38
New cards

Six Sigma quality

A quality benchmark of 3.43.4 defects per million opportunities.

39
New cards

Lean manufacturing

Producing with fewer resources and less waste (requiring less inventory, less floor space, less effort, and fewer defects) while maintaining customer value.

40
New cards

PERT (Program Evaluation and Review Technique)

A method that plans project tasks and estimates completion time by sequencing dependent tasks and mapping project networks.

41
New cards

PERT steps

List and sequence tasks, estimate task times, draw network, and identify critical path.

42
New cards

Critical path

The longest sequence of dependent tasks in a project, which determines the shortest possible project completion time.

43
New cards

Gantt chart

A bar chart showing project tasks, timelines, and completion progress by calendar dates.

44
New cards

PERT versus Gantt

PERT emphasizes task dependencies and the critical path, whereas a Gantt chart displays tasks on a timeline.

45
New cards

Mike’s Bikes: sales forecast and inventory planning

Estimating units likely to sell before deciding production, and comparing projected demand with existing stock to avoid overproduction or shortages.

46
New cards

Supplier oversight

The responsibility of operations managers to purchase parts, supervise suppliers, and try to prevent delays.