Five Branches of Critical Thinking
Problem Identification
Creative Thinking
Logical Analysis
Decision Making
Coordination
Problem Idnetification
Visualization
Fact Finding
Creative Thinking
Green Light Thinking
Brainstorming
Logical Analysis
Red Light Thinking
Reasoning
Decision Making
Gain Consensus
Decision Matrixes
Coordination
Plan Implementation
Control Stress
Notice to Proceed
implies that the site is free of encumbrances and the contractor can occupy the site
The date of the NTP establishes the reference date from which the beginning of the project is calculated
Fast Track
schedule method that starts activities at their ealiest possible time to push subsequent activities up in their execution
Substantial Completion
the date is provided in the contract and represents the earliest day that the owner can use the facility "for its intended purpose"
this date also specifies when liquidated damages will begin
Liquidated Damages
an assessment against the contractor for late completion
intended to compensate the owner for lost revenue, the dates that control this are notice to proceed and substantial completion
Stakeholders in Planning
Owners
Design Team
Builders
Agencies
Providers
Reasons for project changes
People (different owners rep or superintendent)
Societal
Building Codes (every 3 years)
Environmental (Weather)
Unknown Conditions
Uncontrolled changes
Risk Scheduling
All high-risk items should be an activity in your schedule
Link high-risk activities to all affected activities
Delays lead to delays
4 Levels of WBS
Proposal
Pre-Construction
Construction
Look Ahead
Level 1: Proposal
goal is to summarize the overall project for client and management
show start & finish dates for major project phases and milestone and include the project time, goals, and objectives
Level 2: Preconstruction
contain more details for each summary phase based on the level 1 schedule
Level 3: Construction
includes start and finish dates and links for all activities
critical path method is utilized
used as the project baseline for tracking progress
durations should not be longer than 10 days
Milestones
important items to watch that have zero durations (0 days)
May trigger the beginning or end of a phase
Ex: NTP, Dry-In, Substantial Completion, Top-Out, etc.
Information needed to determine a duration
Quantity of Work
Production Rate (Crew sizes, special productivity factor)
Hours per workday
Calculating Duration
Quantity of Work / Production Rate = Work Hours
Work Hours x Productivity Factor = Adjusted WH
Adj. Work Hours / Hours per workday = Activity Duration
Productivity Factor
production rates can be affected by multiple factors
EX: weather, congested space, layout, material handling, crew expertise, safety requirements, complexity, etc.
Activity and/or Tasks
smaller components included in an overall schedule that are identified for the purpose of planning, scheduling, monitoring, and controlling the project
Activities are described in terms of time and will generally consume resources
Duration
the length of time for an activity, series of activities, or a project
Resources
can be people, equipment, or materials
Relationship
Defines how an activity relates to the start or finish of another activity or assignment
4 different types: Finish to Start (FS, basic), Finish to Finish (FF), Start to Start (SS), Start to Finish (SF, not used)
Predecessors
a task that comes before another task and its completion is dependent upon the following tasks start
Successors
A task that comes before another task and is dependent upon the previous task
Float/Slack
the time a task can be delayed without affecting the interdependent tasks dates
Lag
a planned delay between tasks
7 + 1 Forms of Waste
Transportation (excess movement of ppl, tools, inventory)
Inventory (too many materials on site = clutter)
Motion (any unnecessary movement)
Waiting (waiting for something else in order to continue)
Over-processing (unnecessary steps taken during production)
Over-production (more products produced than needed)
Defects (errors or mistakes)
Wasted human potential (most important)
5 principles of LEAN
Define Value
Map the Value Chain
Create Flow
"Pull" Work (just in time, balance crews)
Measure and Perfect
Who should us the last planner system?
owner
architect/ designers
general contractor
specialty contractor
Calendars
assigning them to projects and tasks, defines the working and nonworking days on the project
they also account for weekends, holidays, shifts, special events, weather
Weather Days
There are at least 3 approaches to incorporate weather into your CPM schedule:
1) Incorporate non-workdays into schedule calendar to represent the workdays that might be lost to adverse weather
2)Adding an "adverse weather" activity at the end of project with a duration that equals the # of workdays lost to weather
3) increase durations of weather-sensitive work activities to represent the workdays that might be lost to weather
Calendars by Tasks
some tasks may have different working days than other tasks
create additional calendars for all other schedules
EX: interior trades not impacted by weather, or one crew works (4) 10 hr days or 6 days a week
Pros and Cons of Pre-Fabrication
BIM Coordination, labor shortages, controlled fabrication conditions, LEAN process, schedule enhancements, higher quality, coordinated fabrication
There are no cons besides possibly taking up space
Critical Path
the longest path to complete the project
the longest continuous chain of activities through the network schedule which establishes the minimum overall project duration
summary task
a single line task which summarizes all the tasks indicated within its group
usually shown to indicate the total duration of a phase
Free Float
the amount of time that a task can slip before it impacts the start of the successor task
Letter of Intent
from the owner, indicates selection and acceptance of the proposal and states intent of entering into a suitable contract at a later date
this is used if a burden on the site has not been reconciled or the funding has not been secured later date because of certain activities not being met at the notification time
Variance
the measure of change in a task duration either in a positive or negative connotation
Keys to a Successful Project
1) Get the team together as early as possible
2) Open Communications - Mutual Trust and Respect
3) Early Participation of Subs
4) Budget
5) Schedule
Hierarchy of which documents are more important
UGC (State of TX)
CMR Contract (Texas A&M University)
Schedule Specification from ODR
RFQ/RFP
Five Keys to Successful Temas
1) Established Roles and Responsibilities
2) Defined Goals and Objectives
3) Know the system in which you are working
4) Identify problem and barriers
5) Know your PEOPLE (most important)
Lean Construction
a project operating system used to create value by reducing cost, time, and effort
Muda
Japanese word meaning uselessness, waste, futility
Promised Percent Complete (PPC)
tracking weekly % for individual companies and the team as a whole
to know if we are reliable
to build accountability
Root Cause Analysis (RCA)
to understand why we are not reliable
to stabilize the problems with countermeasures
to ultimately implement preventative measures
Desired Scheduling Outcomes
finish on time
continuous workflow
logical progression of the work
meaningful and timely reporting (communication)
pro-active
accountability and momentum
Gantt Charts
bar charts from early 1900s
activity and/or tasks listed on the left
timeline across the top
bars to show the relationships between tasks
Critical Path Method (CPM) early 1950s
same format as Gantt charts
durations listed in work days
start dates and finish dates in calendar days
includes logical relationships
identification of critical path and float
Microsoft Project
Known as tasks
Primavera P6 = activities
known as activities