Instrument

0.0(0)
Studied by 2 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/165

encourage image

There's no tags or description

Looks like no tags are added yet.

166 Terms

1
New cards
<p><span>During the ILS RWY 13 procedure at DSM, the minimum altitude for glide slope interception is</span></p>

During the ILS RWY 13 procedure at DSM, the minimum altitude for glide slope interception is

2,600 feet MSL.

2
New cards
<p><span>If an aircraft was cleared for the ILS RWY 18 at Lincoln Municipal and crossed the Lincoln VORTAC at 5,000&nbsp;feet MSL, at what point in the teardrop could a descent to 3,200&nbsp;feet commence?</span></p>

If an aircraft was cleared for the ILS RWY 18 at Lincoln Municipal and crossed the Lincoln VORTAC at 5,000 feet MSL, at what point in the teardrop could a descent to 3,200 feet commence?

Immediately.

3
New cards

Which fixes on the IAP Charts are initial approach fixes?


Any fix that is identified by the letters IAF.

4
New cards

What does the symbol T within a black triangle in the minimums section of the IAP for a particular airport indicate?

Takeoff minimums are not standard and/or departure procedures are published.

5
New cards
<p><span>A pilot plans to fly to Baldwin for Christmas. What minimum equipment is required for the VOR/DME or GPS-A procedure, and can the pilot complete the flight?</span></p>

A pilot plans to fly to Baldwin for Christmas. What minimum equipment is required for the VOR/DME or GPS-A procedure, and can the pilot complete the flight?


One VOR receiver and one DME receiver; no flight though, the airport is closed.

6
New cards
<p><span>The minimum safe altitude (MSA) for the VOR/DME or GPS-A at 7D3 is geographically centered on what position?</span></p>

The minimum safe altitude (MSA) for the VOR/DME or GPS-A at 7D3 is geographically centered on what position?


WHITE CLOUD VOR/DME.

7
New cards

On a nonprecision approach, what is the maximum acceptable descent rate during the final stages of the approach (below 1,000 ft. AGL)?

1,000 fpm.

8
New cards
<p><span>What is the minimum altitude descent procedure if cleared for the S-ILS 9 approach from Seal Beach VORTAC?</span></p>

What is the minimum altitude descent procedure if cleared for the S-ILS 9 approach from Seal Beach VORTAC?

Descend and maintain 3,000 to JASER INT, descend to 2,500 while established on the LOC course inbound, intercept and maintain the GS to 960 (DA).

9
New cards
<p><span>Refer to the APA (Centennial) ILS RWY 35R procedure. The PFAF (Precision Final Approach Fix) intercept altitude is</span></p>

Refer to the APA (Centennial) ILS RWY 35R procedure. The PFAF (Precision Final Approach Fix) intercept altitude is


8,000 feet MSL.

10
New cards
<p><span>ATC assigns the RAL Runway 9 ILS. In the event that a missed approach is necessary, the pilot determines they will climb with 120&nbsp;knots ground speed. What would the missed approach rate of climb be?</span></p>

ATC assigns the RAL Runway 9 ILS. In the event that a missed approach is necessary, the pilot determines they will climb with 120 knots ground speed. What would the missed approach rate of climb be?

540 feet per minute minimum.

11
New cards
<p><span>At which location or condition does the STELA.STELA1 arrival begin?</span></p>

At which location or condition does the STELA.STELA1 arrival begin?

CANAN intersection

12
New cards

How can the pilot determine, for an ILS runway equipped with MALSR, that there may be a penetration of the obstacle identification surfaces (OIS), and care should be taken in the visual segment to avoid any obstacles?

The published visibility for the ILS is no lower than 3/4 SM.

13
New cards
<p><span>How should a pilot reverse course to get established on the in bound course of the ILS RWY 9, if radar vectoring to EXPAM?</span></p>

How should a pilot reverse course to get established on the in bound course of the ILS RWY 9, if radar vectoring to EXPAM?

Make an appropriate entry to the depicted holding pattern at EXPAM INT.

14
New cards
<p><span>A pilot has been cleared for the RNAV (GPS) RWY&nbsp;36 approach to LIT. At a groundspeed of 105&nbsp;knots, what are the vertical descent angle and rate of descent on final approach?</span></p>

A pilot has been cleared for the RNAV (GPS) RWY 36 approach to LIT. At a groundspeed of 105 knots, what are the vertical descent angle and rate of descent on final approach?

3.00 degrees and 557 feet per minute.

15
New cards

Which of the following statements regarding STARs (Standard Terminal Arrivals) is most accurate?

STARs facilitate the transition between the en route portion of the flight and the instrument approach procedure.

16
New cards
<p><span>How should the missed approach point be identified when executing the RNAV (GPS) RWY 36 approach at Adams Field?</span></p>

How should the missed approach point be identified when executing the RNAV (GPS) RWY 36 approach at Adams Field?

When the TO-FROM indicator changes.

17
New cards
<p><span>The symbol on the plan view of the ILS or LOC RWY&nbsp;13 procedure at DSM represents a minimum safe sector altitude within 25&nbsp;NM of</span></p>

The symbol on the plan view of the ILS or LOC RWY 13 procedure at DSM represents a minimum safe sector altitude within 25 NM of

Des Moines VORTAC.

18
New cards

Which procedure should be followed by a pilot who is circling to land in a Category B airplane, but is maintaining a speed 5 knots faster than the maximum specified for that category?


Use the approach minimums appropriate for Category C.

19
New cards

Under the stabilized approach concept, what is the maximum acceptable descent rate during the final stages of an approach?

1,000 fpm for either precision or nonprecision approaches.

20
New cards
<p><span>At which point does the JEN.JEN9 arrival begin?</span></p>

At which point does the JEN.JEN9 arrival begin?

GLEN ROSE VORTAC

21
New cards
<p><span>During the approach to DSM before beginning the ILS RWY&nbsp;13 procedure, the glide slope fails and the pilot is cleared for the LOC RWY&nbsp;13 at DSM. What altitude minimum applies?</span></p>

During the approach to DSM before beginning the ILS RWY 13 procedure, the glide slope fails and the pilot is cleared for the LOC RWY 13 at DSM. What altitude minimum applies?

1,380 feet

22
New cards
<p><span>When using the hold for course reversal for the RNAV (GPS) RWY&nbsp;36, at what point will the pilot turn inbound for the approach?</span></p>

When using the hold for course reversal for the RNAV (GPS) RWY 36, at what point will the pilot turn inbound for the approach?

4 DME miles from FEHXE.

23
New cards
<p><span>During the ILS RWY 13 procedure at DSM, what altitude minimum applies if the glide slope becomes inoperative?</span></p>

During the ILS RWY 13 procedure at DSM, what altitude minimum applies if the glide slope becomes inoperative?

1,380 feet

24
New cards
<p><span>What minimum airborne equipment is required to be operative for RNAV (GPS) RWY&nbsp;36 approach at Adams Field?</span></p>

What minimum airborne equipment is required to be operative for RNAV (GPS) RWY 36 approach at Adams Field?

Any approved RNAV receiver

25
New cards

When the approach procedure involves a procedure turn, the maximum speed should not be greater than

200 knots IAS

26
New cards
<p><span>At what minimum altitude should a pilot cross RAMKE intersection during the S-LDA RWY&nbsp;6 approach at ROA?</span></p>

At what minimum altitude should a pilot cross RAMKE intersection during the S-LDA RWY 6 approach at ROA?

4,300 MSL

27
New cards

While being radar vectored, an approach clearance is received. The last assigned altitude should be maintained until

established on a segment of a published route or IAP.

28
New cards
<p><span>What type of entry is recommended to the missed approach holding pattern if the inbound heading is 050°?</span></p>

What type of entry is recommended to the missed approach holding pattern if the inbound heading is 050°?

Teardrop

29
New cards

How can an initial approach fix be identified on a Standard Instrument Approach Procedure (SIAP) Chart?

All fixes that are labeled “IAF” which are depicted on the plan view.

30
New cards

What action is recommended if a pilot does not wish to use an instrument departure procedure?

Enter “No DP” in the REMARKS section of the IFR flight plan.

31
New cards
<p><span>What landing minimums apply for a 14 CFR Part 91 operator at Dothan, AL using a category&nbsp;C aircraft during a circling LOC&nbsp;32 approach at 120&nbsp;knots? (Dual VORs available.)</span></p>

What landing minimums apply for a 14 CFR Part 91 operator at Dothan, AL using a category C aircraft during a circling LOC 32 approach at 120 knots? (Dual VORs available.)


MDA 860 feet MSL and visibility 1 and 1/2 SM.

32
New cards

Which is true regarding the use of an instrument departure procedure chart?

To use an instrument departure procedure, the pilot must possess at least the textual description of the approved procedure.

33
New cards
<p><span>The final approach fix for the ILS RWY&nbsp;24R is located at</span></p>

The final approach fix for the ILS RWY 24R is located at


Glide Slope Intercept (lightning bolt).

34
New cards
<p><span>What options are available concerning the teardrop course reversal for LOC RWY 18 approach to Lincoln?</span></p>

What options are available concerning the teardrop course reversal for LOC RWY 18 approach to Lincoln?

If a course reversal is required, only the teardrop can be executed.

35
New cards
<p><span>What is the minimum safe altitude (MSA) when maneuvering northeast of APA?</span></p>

What is the minimum safe altitude (MSA) when maneuvering northeast of APA?

8,100 feet

36
New cards
<p><span>When the MALSR are NOTAM’d out of service, what are the minimums for a category&nbsp;B airplane LPV approach?</span></p>

When the MALSR are NOTAM’d out of service, what are the minimums for a category B airplane LPV approach?

4500 RVR

37
New cards

The primary reason single pilot operations in reduced visibility on an instrument approach procedure are made more difficult than multicrew operations is that the pilot must

continue to fly by instruments while attempting to acquire a visual reference for the runway.

38
New cards

Which clearance procedures may be issued by ATC without prior pilot request?

DP’s, STAR’s, and visual approaches.

39
New cards

Unless otherwise stated, instrument procedures use the standard IFR climb gradient of


200 feet per nautical mile.

40
New cards

When being radar vectored for an ILS approach, at what point may the pilot start a descent from the last assigned altitude to a lower minimum altitude if cleared for the approach?

When established on a segment of a published route or IAP.

41
New cards
<p><span>What is the recommended holding pattern entry if a pilot is executing the missed approach at CQX from the RNAV (GPS)-B approach?</span></p>

What is the recommended holding pattern entry if a pilot is executing the missed approach at CQX from the RNAV (GPS)-B approach?

Direct

42
New cards

During an instrument precision approach, terrain and obstacle clearance depends on adherence to

minimum altitude shown on the IAP.

43
New cards
<p><span>At which points may a pilot initiate a descent to the next lower minimum altitude when cleared for the VOR/DME RWY&nbsp;36 approach, from the PUC R-095 IAF (DME operative)?</span></p>

At which points may a pilot initiate a descent to the next lower minimum altitude when cleared for the VOR/DME RWY 36 approach, from the PUC R-095 IAF (DME operative)?

Start descent from 8,900 when established on the PUC R-189, from 8,000 at the 8.3 DME fix, from 7,500 at the 5.1 DME fix, and from 6,240 when landing requirements are met.

44
New cards
<p><span>A pilot is executing the Centennial Airport (APA) ILS RWY&nbsp;35R approach. What is the crossing altitude at the outer marker?</span></p>

A pilot is executing the Centennial Airport (APA) ILS RWY 35R approach. What is the crossing altitude at the outer marker?

7,977 feet MSL

45
New cards

Which is true regarding STARs?

STARs are established to simplify clearance delivery procedures.

46
New cards
<p><span>What indication should a pilot get when it is time to turn in bound while in the procedure turn at FEHXE?</span></p>

What indication should a pilot get when it is time to turn in bound while in the procedure turn at FEHXE?

4 DME miles from FEHXE.

47
New cards

The instrument approach criteria for a Category A aircraft is based on a maximum airspeed of

90 knots

48
New cards
<p><span>If the DME at PUC airport is inoperative, the airborne DME will</span></p>

If the DME at PUC airport is inoperative, the airborne DME will

not transmit a coded identification audio tone.

49
New cards
<p><span>What minimum navigation equipment is required to complete the VOR/DME-A procedure?</span></p>

What minimum navigation equipment is required to complete the VOR/DME-A procedure?

One VOR receiver and DME.

50
New cards
<p><span>The missed approach point for the LOC RWY&nbsp;31 procedure is</span></p>

The missed approach point for the LOC RWY 31 procedure is

2:33 from PECAT.

51
New cards
<p><span>What is the recommended descent angle for the RNAV (GPS) RWY&nbsp;36 approach?</span></p>

What is the recommended descent angle for the RNAV (GPS) RWY 36 approach?


3.00°.

52
New cards

When may a pilot make a straight-in landing, if using an IAP having only circling minimums?

A straight-in landing may be made if the pilot has the runway in sight in sufficient time to make a normal approach for landing, and has been cleared to land.

53
New cards

What obstacle clearance and navigation signal coverage is a pilot assured with the Minimum Sector Altitudes depicted on the IAP charts?

1,000 feet within a 25 NM radius of the navigation facility but not acceptable navigation signal coverage.

54
New cards

When simultaneous approaches are in progress, how does each pilot receive radar advisories?

On tower frequency

55
New cards

A particular instrument departure procedure requires a minimum climb rate of 210 feet per NM to 8,000 feet. If the aircraft climbs with a ground speed of 140 knots, what is the rate of climb required in feet per minute?

490

56
New cards

Aircraft approach categories are based on

1.3 times the stall speed in landing configuration at maximum gross landing weight.

57
New cards

ATC can issue a STAR (Standard Terminal Arrival)

when ATC deems it appropriate, unless the pilot requests “No STAR.”

58
New cards
59
New cards

During an instrument approach, under what conditions, if any, is the holding pattern course reversal not required?

When radar vectors are provided.

60
New cards

An airport may not be qualified for alternate use if

the NAVAIDs used for the final approach are unmonitored.

61
New cards

When making an instrument approach at the selected alternate airport, what landing minimums apply?


The landing minimums published for the type of procedure selected.

62
New cards
<p><span>For takeoff on RWY 9 using an average groundspeed of 140&nbsp;knots, what minimum rate of climb would meet the required minimum rate of climb as specified on the instrument departure procedure?</span></p>

For takeoff on RWY 9 using an average groundspeed of 140 knots, what minimum rate of climb would meet the required minimum rate of climb as specified on the instrument departure procedure?

970 feet per minute

63
New cards
<p><span>If cleared for an S-LOC 18 approach at Lincoln Municipal from over HUSKR, it means the flight should</span></p>

If cleared for an S-LOC 18 approach at Lincoln Municipal from over HUSKR, it means the flight should

begin final approach without making a procedure turn.

64
New cards

If the plan view on an approach chart does not include a procedure turn barb, that means


a procedure turn is not authorized.

65
New cards
<p><span>What is the purpose of the 10,600 MSA on the Price/Carbon County Airport Approach Chart?</span></p>

What is the purpose of the 10,600 MSA on the Price/Carbon County Airport Approach Chart?

It provides safe clearance above the highest obstacle in the defined sector out to 25 NM.

66
New cards

While flying a 3° glide slope, a headwind shears to a tailwind. Which conditions should the pilot expect on the glide slope?

Airspeed and pitch attitude decrease and there is a tendency to go below glide slope.

67
New cards
<p><span>At what point would a pilot execute the missed approach for the LNAV approach at LBF?</span></p>

At what point would a pilot execute the missed approach for the LNAV approach at LBF?

RW 30 waypoint for the LNAV.

68
New cards
<p><span>A pilot has been cleared for the Straight-in Localizer approach for runway 13L at DAL. Prior to reaching the final approach fix, ATC advises that the RVR is not available and that the visibility is 1/2 SM. The pilot may</span></p>

A pilot has been cleared for the Straight-in Localizer approach for runway 13L at DAL. Prior to reaching the final approach fix, ATC advises that the RVR is not available and that the visibility is 1/2 SM. The pilot may

convert the RVR to statute miles and continue the approach.

69
New cards
<p><span>When conducting a missed approach from the RNAV (GPS) X&nbsp;RWY&nbsp;28L approach at PDX, what is the Minimum Safe Altitude (MSA) while maneuvering?</span></p>

When conducting a missed approach from the RNAV (GPS) X RWY 28L approach at PDX, what is the Minimum Safe Altitude (MSA) while maneuvering?

5,800 feet MSL

70
New cards

The rate of descent on the glide slope depends on

ground speed

71
New cards

When passing through an abrupt wind shear which involves a shift from a tailwind to a headwind, what power management would normally be required to maintain a constant indicated airspeed and ILS glide slope?

Lower than normal power initially, followed by a further decrease as the wind shear is encountered, then an increase.

72
New cards

When cleared to execute a published sidestep maneuver for a specific approach and landing on the parallel runway, at what point is the pilot expected to commence this maneuver?

As soon as possible after the runway or runway environment is in sight.

73
New cards

When may a pilot obtain a contact approach?

ATC will assign a contact approach only upon request if the reported visibility is at least 1 mile.

74
New cards

When is radar service terminated during a visual approach?


Automatically when ATC instructs the pilot to contact the tower.

75
New cards

What effect will a change in wind direction have upon maintaining a 3° glide slope at a constant true airspeed?

When ground speed increases, rate of descent must increase.

76
New cards
<p><span>For a stabilized approach, the aircraft must be in an approved configuration for landing</span></p>

For a stabilized approach, the aircraft must be in an approved configuration for landing

with the correct speed and on glide path before descending below 1,268 feet MSL.

77
New cards

A Precision Runway Monitor (PRM) approach requires


simultaneously monitoring two frequencies.

78
New cards
<p><span>If the RVR is not reported, what meteorological value should the pilot substitute for 2400&nbsp;RVR?</span></p>

If the RVR is not reported, what meteorological value should the pilot substitute for 2400 RVR?

A ground visibility of 1/2 SM.

79
New cards
<p><span>The missed approach point for the DUC RNAV (GPS) RWY&nbsp;17 (LNAV/VNAV) procedure is</span></p>

The missed approach point for the DUC RNAV (GPS) RWY 17 (LNAV/VNAV) procedure is


1,903 feet MSL.

80
New cards

The glide slope and localizer are centered, but the airspeed is too fast. Which should be adjusted initially?

Power only

81
New cards

What are the main differences between a visual approach and a contact approach?

The pilot must request a contact approach; the pilot may be assigned a visual approach and higher weather minimums must exist.

82
New cards

The rate of descent required to stay on the ILS glide slope

must be decreased if the ground speed is decreased.

83
New cards

RVR minimums for landing are prescribed in an IAP, but RVR is inoperative and cannot be reported for the intended runway at the time. Which of the following would be an operational consideration?

RVR minimums which are specified in the procedures should be converted and applied as ground visibility.

84
New cards

Precision Runway Monitoring (PRM) is


a RADAR system for monitoring approaches to closely spaced parallel runways.

85
New cards

If an early missed approach is initiated before reaching the MAP, the following procedure should be used unless otherwise cleared by ATC.

Proceed to the missed approach point at or above the MDA or DH before executing a turning maneuver.

86
New cards
<p><span>If the RVR equipment is inoperative for an IAP that requires a visibility of 2,400&nbsp;RVR, how should the pilot expect the visibility requirement to be reported in lieu of the published RVR?</span></p>

If the RVR equipment is inoperative for an IAP that requires a visibility of 2,400 RVR, how should the pilot expect the visibility requirement to be reported in lieu of the published RVR?


As a ground visibility of 1/2 SM.

87
New cards

What are the main differences between the SDF and the localizer of an ILS?


The SDF course may not be aligned with the runway and the course may be wider.

88
New cards

A pilot arrives at the destination airport on an IFR flight plan. Which is a prerequisite condition for the performance of a contact approach?

Clear of clouds and at least 1 SM flight visibility.

89
New cards

Assume this clearance is received:

“CLEARED FOR ILS RUNWAY 07 LEFT APPROACH, SIDE-STEP TO RUNWAY 07 RIGHT.”

When would the pilot be expected to commence the side-step maneuver?

As soon as possible after the runway environment is in sight.

90
New cards

A contact approach is an approach procedure that may be used

in lieu of conducting a SIAP.

91
New cards

If the pilot loses visual reference while circling to land from an instrument approach and ATC radar service is not available, the missed approach action should be to

make a climbing turn toward the landing runway and continue the turn until established on the missed approach course.

92
New cards

While flying a 3° glide slope, a constant tailwind shears to a calm wind. Which conditions should the pilot expect?


Airspeed and pitch attitude increase and there is a tendency to go above glide slope.

93
New cards

While being vectored, if crossing the ILS final approach course becomes imminent and an approach clearance has not been issued, what action should be taken by the pilot?


Maintain the last assigned heading and query ATC.

94
New cards

Thrust is managed to maintain IAS, and glide slope is being flown. What characteristics should be observed when a headwind shears to be a constant tailwind?

PITCH ATTITUDE: Decreases; REQUIRED THRUST: Increased, then reduced; VERTICAL SPEED: Increases; IAS: Decreases, then increases to approach speed.

95
New cards

How wide is an SDF course?

Either 6° or 12°.

96
New cards

What does the Runway Visual Range (RVR) value, depicted on certain straight-in IAP Charts, represent?

The horizontal distance a pilot should see when looking down the runway from a moving aircraft.

97
New cards

During a precision radar or ILS approach, the rate of descent required to remain on the glide slope will


increase as the groundspeed increases.

98
New cards

Flying clear of clouds on an instrument flight plan, what are the requirements for a contact approach to an airport that has an approved IAP?

The pilot must request the approach, have at least 1 mile visibility, and be reasonably sure of remaining clear of clouds.

99
New cards


The controller must determine that the pilot can see the airport at the altitude flown and can remain clear of clouds.

The controller must have determined that the visibility was at least 1 mile and be reasonably sure the pilot can remain clear of clouds.

100
New cards

When tracking in bound on the localizer, which of the following is the proper procedure regarding drift corrections?

Drift corrections should be accurately established before reaching the outer marker and completion of the approach should be accomplished with heading corrections no greater than 2°.