1/44
Practice flashcards based on the Ambulatory Flow lecture covering Time & Flow metrics, the 5S methodology, Lean simulation exercises, High Reliability, and Standard Work.
The overarching theme of the morning workshop is to identify waste, study time, test flow, and learn __________.
5S
Time serves as an objective Lean measure because it converts delays and workload into __________ data.
observable
Time measurement supports four critical operational areas: workload balance, process health, training, and __________.
demand
__________ is defined as active work in one cycle, excluding waiting periods before or after.
Cycle Time
The metric representing the total elapsed time from request to completed follow-up, including waits, is __________.
Lead Time
The formula for Takt Time is __________ working time divided by customer demand.
Available
If available time is 30minutes for 30trays, the calculated takt time is one tray every __________.
1minute
For an available time of 480minutes and a demand of 20patients, takt time equals __________ minutes per patient.
24
When 480minutes are available to complete 30refills, the resulting takt time is __________ minutes per request.
16
When Cycle Time exceeds Takt Time, the process cannot keep up and a __________ can grow.
queue
The five card-simulation goals are more output/quality, along with less lead time, inventory, and __________.
WIP
A major disadvantage of moving work in batches of four is that completed items must __________ for the remainder of the batch.
wait
In the card exercise, operator Cycle Time starts when work on the first card begins and ends when the batch is __________ onward.
delivered
Greeting-card Lead Time starts when paper leaves raw materials and ends when it leaves __________.
inspection
A __________ Load Chart is collected to analyze how evenly work is distributed across teams.
Percent
It is essential to describe the current condition first because a team requires a __________ prior to designing changes.
baseline
The Lean 5S methodology originated from __________ production methods before being adapted to healthcare.
Toyota
The 5S step demonstrated by filtering an Epic BP registry from 246 displayed records down to 31 actionable records is __________.
Sort
Transitioning from Sort Level 1 to Level 2 requires identifying and separating unneeded items from __________ items.
needed
PAR stock is calculated as 100gloves/day×3days+200safety= __________.
500
__________ tagging is used to flag uncertain or unneeded items for structured review and removal.
Red
Digital 5S was applied to the Epic BP worklist by refining the display from 246 records to __________ actionable records.
31
After Sorting, the team applied Simplify to the Epic worklist by saving the refined filter so __________ could easily re-access it.
PSRs
Visual replenishment systems described include two-bin setups, rubber-band cues, and __________.
Kanban
A __________ State Map is created to visually define where every item belongs for rapid retrieval.
Perfect
In the 5S framework presented, the term __________ means visually checking conditions and replacing what is missing or broken.
Sweep
Unlike status boards that show condition, a Kanban functions as a visual cue that triggers purchase or __________.
action
In 5S, the step __________ means making shared, documented agreements for the work.
Standardize
To remind staff that a repeat blood pressure is required, the clinic places a laminated __________ on the exam-room door.
heart
In 5S, __________ is defined as maintaining standards through training and habit.
Self-Discipline
The purpose of the Letter Factory exercise is to experience firsthand how disorganization harms speed and __________.
accuracy
In the Letter Factory activity, each of the four teams is staffed by one assembler and one __________.
timer
In Round 3 of the Letter Factory, the team applies the 5S step of __________ by organizing needed letters for easier selection.
Simplify
The core lesson of the Letter Factory simulation is that 5S functions best as a daily system rather than a one-time __________.
event
High reliability is supported by three organizational factors: a speak-up culture, empowered staff, and __________ leaders.
zero-harm
In healthcare safety, a 99% defect-free rate is insufficient because at high volume, even a __________% failure rate can harm many patients.
1%
Applying a __________ Culture model means analyzing the system factors contributing to an error rather than seeking individuals to blame.
Just
Inspection is limited because while it can detect defects, it cannot prevent their __________.
creation
The error-proofing design level that completely removes error opportunity by preventing mistakes from occurring is Level __________.
6
A critical vulnerability of successive double-checks is that staff may assume the previous person performed the check __________.
correctly
__________ Work is defined as a shared, repeatable operator sequence paced to demand.
Standard
Effective visual controls reduce four forms of operational waste: searching, waiting, miscommunication, and __________.
rework
An error-proofing device is superior to a simple reminder because it detects or physically prevents an __________ action.
unsafe
The Draw-a-Pig exercise is designed to test whether written instructions produce a __________ result across different individuals.
consistent
The primary takeaway from repeating the Draw-a-Pig instructions is that repetition alone cannot eliminate __________.
ambiguity