Ambulatory Flow and 5S Lean Management

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/44

flashcard set

Earn XP

Description and Tags

Practice flashcards based on the Ambulatory Flow lecture covering Time & Flow metrics, the 5S methodology, Lean simulation exercises, High Reliability, and Standard Work.

45 Terms

1
New cards

The overarching theme of the morning workshop is to identify waste, study time, test flow, and learn __________.

5S

2
New cards

Time serves as an objective Lean measure because it converts delays and workload into __________ data.

observable

3
New cards

Time measurement supports four critical operational areas: workload balance, process health, training, and __________.

demand

4
New cards

__________ is defined as active work in one cycle, excluding waiting periods before or after.

Cycle Time

5
New cards

The metric representing the total elapsed time from request to completed follow-up, including waits, is __________.

Lead Time

6
New cards

The formula for Takt Time is __________ working time divided by customer demand.

Available

7
New cards

If available time is 30 minutes30\,\text{minutes} for 30 trays30\,\text{trays}, the calculated takt time is one tray every __________.

1 minute1\,\text{minute}

8
New cards

For an available time of 480 minutes480\,\text{minutes} and a demand of 20 patients20\,\text{patients}, takt time equals __________ minutes per patient.

2424

9
New cards

When 480 minutes480\,\text{minutes} are available to complete 30 refills30\,\text{refills}, the resulting takt time is __________ minutes per request.

1616

10
New cards

When Cycle Time exceeds Takt Time, the process cannot keep up and a __________ can grow.

queue

11
New cards

The five card-simulation goals are more output/quality, along with less lead time, inventory, and __________.

WIP

12
New cards

A major disadvantage of moving work in batches of four is that completed items must __________ for the remainder of the batch.

wait

13
New cards

In the card exercise, operator Cycle Time starts when work on the first card begins and ends when the batch is __________ onward.

delivered

14
New cards

Greeting-card Lead Time starts when paper leaves raw materials and ends when it leaves __________.

inspection

15
New cards

A __________ Load Chart is collected to analyze how evenly work is distributed across teams.

Percent

16
New cards

It is essential to describe the current condition first because a team requires a __________ prior to designing changes.

baseline

17
New cards

The Lean 5S methodology originated from __________ production methods before being adapted to healthcare.

Toyota

18
New cards

The 5S step demonstrated by filtering an Epic BP registry from 246 displayed records down to 31 actionable records is __________.

Sort

19
New cards

Transitioning from Sort Level 1 to Level 2 requires identifying and separating unneeded items from __________ items.

needed

20
New cards

PAR stock is calculated as 100 gloves/day×3 days+200 safety=100\,\text{gloves/day} \times 3\,\text{days} + 200\,\text{safety} = __________.

500500

21
New cards

__________ tagging is used to flag uncertain or unneeded items for structured review and removal.

Red

22
New cards

Digital 5S was applied to the Epic BP worklist by refining the display from 246 records to __________ actionable records.

3131

23
New cards

After Sorting, the team applied Simplify to the Epic worklist by saving the refined filter so __________ could easily re-access it.

PSRs

24
New cards

Visual replenishment systems described include two-bin setups, rubber-band cues, and __________.

Kanban

25
New cards

A __________ State Map is created to visually define where every item belongs for rapid retrieval.

Perfect

26
New cards

In the 5S framework presented, the term __________ means visually checking conditions and replacing what is missing or broken.

Sweep

27
New cards

Unlike status boards that show condition, a Kanban functions as a visual cue that triggers purchase or __________.

action

28
New cards

In 5S, the step __________ means making shared, documented agreements for the work.

Standardize

29
New cards

To remind staff that a repeat blood pressure is required, the clinic places a laminated __________ on the exam-room door.

heart

30
New cards

In 5S, __________ is defined as maintaining standards through training and habit.

Self-Discipline

31
New cards

The purpose of the Letter Factory exercise is to experience firsthand how disorganization harms speed and __________.

accuracy

32
New cards

In the Letter Factory activity, each of the four teams is staffed by one assembler and one __________.

timer

33
New cards

In Round 3 of the Letter Factory, the team applies the 5S step of __________ by organizing needed letters for easier selection.

Simplify

34
New cards

The core lesson of the Letter Factory simulation is that 5S functions best as a daily system rather than a one-time __________.

event

35
New cards

High reliability is supported by three organizational factors: a speak-up culture, empowered staff, and __________ leaders.

zero-harm

36
New cards

In healthcare safety, a 99% defect-free rate is insufficient because at high volume, even a __________% failure rate can harm many patients.

1%1\%

37
New cards

Applying a __________ Culture model means analyzing the system factors contributing to an error rather than seeking individuals to blame.

Just

38
New cards

Inspection is limited because while it can detect defects, it cannot prevent their __________.

creation

39
New cards

The error-proofing design level that completely removes error opportunity by preventing mistakes from occurring is Level __________.

66

40
New cards

A critical vulnerability of successive double-checks is that staff may assume the previous person performed the check __________.

correctly

41
New cards

__________ Work is defined as a shared, repeatable operator sequence paced to demand.

Standard

42
New cards

Effective visual controls reduce four forms of operational waste: searching, waiting, miscommunication, and __________.

rework

43
New cards

An error-proofing device is superior to a simple reminder because it detects or physically prevents an __________ action.

unsafe

44
New cards

The Draw-a-Pig exercise is designed to test whether written instructions produce a __________ result across different individuals.

consistent

45
New cards

The primary takeaway from repeating the Draw-a-Pig instructions is that repetition alone cannot eliminate __________.

ambiguity