1/11
Looks like no tags are added yet.
Operations Strategy
The business offers freshly baked cookies "homemade" style, in a fast-food format.
Product Design
The unique feature of the cookies is that they are loaded with extra-large and crunchy pecans and are fresh and moist.
Process Selection
A special convection oven is used to make the cookies in order to keep them fresh and moist. The dough is allowed to rise longer than usual to make the cookies extra light.
Supply Chain Management
The key ingredients, pecans and syrup, will be purchased from only one supplier located in South Carolina because it offers the best products. A relationship is worked out in which the supplier sends the ingredients on the exact schedule that they are needed.
Quality Management
A quality check is made at each stage of cookie production. The dough is checked for texture; the pecans are checked for size and freshness; the syrup is checked for consistency.
Forecast
Expected sales for each day of the week have been determined; for example, it is expected that more cookies will be sold on weekdays and most during the lunch hours. Expected cookie sales for each month and for the year have also been determined.
Location Analysis
After looking at locations of customers and location costs, it is decided that the facility will be located in a shopping mall.
Capacity Planning
The business needs to be able to produce 200 cookies per hour, or up to 2000 cookies per day.
Facility Layout
Decisions are made about where the kitchen will be located and how the working area will be arranged for maximum efficiency. The business is competing on the basis of speed and quality; therefore, the facility should be arranged to promote these features. There will be a small seating area for customers and a large counter and display case for buying.
Job Design & Work Measurement
Two people will be needed in the kitchen during busy periods and one during slow periods. Their job duties are determined. One person will be needed for order taking at all times.
Inventory Management
A different policy is developed for common ingredients, such as flour and sugar. These ingredients will be ordered every two weeks for a two-week supply. A special purchasing arrangement is worked out with the supplier of specialty ingredients.
Scheduling
Two people will work the counter in split shifts. One kitchen employee will work a full shift, with a second employee working part-time.