Quality Management, Six Sigma, and Lean Foundations

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/139

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering core quality concepts, quality pioneers, Six Sigma foundations and roles, Lean manufacturing and 8 wastes, 5S, production tools, flow, the 7 basic quality tools, statistical process control, control charts, process capability, and quality management frameworks.

Last updated 11:58 PM on 10/3/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

140 Terms

1
New cards

W. Edwards Deming

Father of TQM; known for his 14 Points for Management and emphasizing that management is responsible for the system.

2
New cards

Joseph Juran

Defined quality as "fitness for use"; created the Juran Trilogy (Quality Planning, Quality Control, Quality Improvement).

3
New cards

Philip Crosby

Coined the phrase "Quality is Free" and established the concept of "Zero Defects."

4
New cards

Kaoru Ishikawa

Developed the Cause-and-Effect (Fishbone) diagram and pioneered Quality Circles.

5
New cards

Genichi Taguchi

Created the Taguchi Loss Function, which states that any deviation from the target value results in a loss to society.

6
New cards

Armand Feigenbaum

Originated the concept of Total Quality Control (TQC), which later evolved into Total Quality Management.

7
New cards

Walter Shewhart

The "Father of Statistical Quality Control"; created the Control Chart and the PDSA (Plan-Do-Study-Act) cycle.

8
New cards

Frederick Taylor

The "Father of Scientific Management"; focused on dividing work into specialized, repeatable tasks.

9
New cards

Henry Ford

Pioneered the assembly line and early mass production; focused on standardization and flow.

10
New cards

Taiichi Ohno

The primary architect of the Toyota Production System (TPS), which became the foundation of Lean manufacturing.

11
New cards

Quality

The degree to which a set of inherent characteristics fulfills customer requirements.

12
New cards

Total Quality Management (TQM)

A management approach centered on quality, based on the participation of all members to ensure long-term customer satisfaction.

13
New cards

Quality of Design

How well the intended product specifications align with what the customer actually wants.

14
New cards

Quality of Conformance

The degree to which the actual manufactured product aligns with its design specifications.

15
New cards

Prevention Costs

Costs incurred to keep defects from happening in the first place (e.g., training, process planning).

16
New cards

Appraisal Costs

Costs incurred to assess or inspect quality levels (e.g., testing, auditing, inspection).

17
New cards

Internal Failure Costs

Costs of defects found before the product reaches the customer (e.g., scrap, rework, machine downtime).

18
New cards

External Failure Costs

Costs of defects found after the customer receives the product (e.g., warranty claims, returns, lost reputation).

19
New cards

Cost of Good Quality (CoGQ)

The sum of Prevention and Appraisal costs.

20
New cards

Cost of Poor Quality (CoPQ)

The sum of Internal and External Failure costs.

21
New cards

Six Sigma

A data-driven methodology aimed at reducing variation and eliminating defects (aiming for 3.43.4 defects per million opportunities).

22
New cards

DMAIC

The core Six Sigma improvement cycle: Define, Measure, Analyze, Improve, Control.

23
New cards

Define (DMAIC)

The phase where the problem, project goals, and customer requirements are clearly established.

24
New cards

Measure (DMAIC)

The phase where current process performance is quantified and baseline data is collected.

25
New cards

Analyze (DMAIC)

The phase where data is evaluated to identify the root causes of defects or variation.

26
New cards

Improve (DMAIC)

The phase where solutions are developed, tested, and implemented to eliminate root causes.

27
New cards

Control (DMAIC)

The phase where the improved process is standardized and monitored to sustain the gains.

28
New cards

DMADV

A Six Sigma framework used for designing new processes or products: Define, Measure, Analyze, Design, Verify.

29
New cards

DPMO

Defects Per Million Opportunities; a metric used to measure process performance.

30
New cards

3.4 DPMO

The statistical definition of "Six Sigma level" quality, allowing for a 1.5ā€‰Ļƒ1.5\,\sigma shift over time.

31
New cards

Champion

An executive leader who sponsors the Six Sigma project, clears roadblocks, and aligns it with business goals.

32
New cards

Master Black Belt

A highly experienced, full-time Six Sigma expert who trains and mentors Black Belts and Green Belts.

33
New cards

Black Belt

A full-time Six Sigma project leader who handles complex statistical analyses and leads cross-functional teams.

34
New cards

Green Belt

A part-time Six Sigma practitioner who leads smaller projects while maintaining their regular job duties.

35
New cards

Yellow Belt

A team member who has basic Six Sigma training and assists Green or Black Belts on projects.

36
New cards

White Belt

Someone with introductory, foundational knowledge of Six Sigma principles.

37
New cards

Process Owner

The person directly responsible for managing and maintaining the targeted process after the project ends.

38
New cards

Stakeholder

Anyone impacted by the process or the outcome of the Six Sigma project.

39
New cards

Voice of the Customer (VOC)

The expressed needs, wants, and expectations of the customer.

40
New cards

Critical to Quality (CTQ)

Measurable characteristics of a product or process that must be met to satisfy the Voice of the Customer.

41
New cards

Lean Manufacturing

A methodology focused on maximizing customer value while minimizing waste.

42
New cards

Value

Anything the customer is willing to pay for; any action that transforms the product toward what the customer wants.

43
New cards

Value Stream

The entire sequence of activities (both value-adding and non-value-adding) required to bring a product from concept to customer.

44
New cards

Flow

The uninterrupted movement of a product or service through the system to the customer.

45
New cards

Pull System

A system where work is only initiated when there is a direct demand from downstream (the customer).

46
New cards

Perfection (Lean)

The continuous pursuit of removing waste so that every step adds value.

47
New cards

Muda

The Japanese term for Waste (any activity that consumes resources but creates no value).

48
New cards

Mura

The Japanese term for Unevenness or variation in the process (often caused by poor scheduling).

49
New cards

Muri

The Japanese term for Overburdening workers or equipment beyond their reasonable capacity.

50
New cards

Kaizen

Japanese for "Continuous Improvement"; involves small, incremental changes made by everyone, every day.

51
New cards

Defects (Waste)

Products or services that do not conform to specifications and require rework or scrapping.

52
New cards

Overproduction (Waste)

Producing more than is needed or producing it before it is needed (considered the worst waste).

53
New cards

Waiting (Waste)

Idle time when workers or machines wait for materials, information, or the previous step to finish.

54
New cards

Non-Utilized Talent (Waste)

Failing to use the skills, creativity, or knowledge of employees.

55
New cards

Transportation (Waste)

The unnecessary movement of materials, products, or information between locations.

56
New cards

Inventory (Waste)

Holding more raw materials, work-in-process (WIP), or finished goods than is strictly necessary.

57
New cards

Motion (Waste)

Unnecessary physical movement by workers (e.g., reaching, walking, bending) during their tasks.

58
New cards

Extra-Processing (Waste)

Doing more work or adding more features than the customer actually requires.

59
New cards

TIMWOOD

An older acronym for the 77 traditional wastes (Transportation, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects).

60
New cards

DOWNTIME

The modern acronym for the 88 wastes (Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, Extra-processing).

61
New cards

5S

A workplace organization method that ensures spaces are clean, uncluttered, safe, and well-organized.

62
New cards

Sort (Seiri)

The first 'S'; distinguishing between necessary and unnecessary items and removing what is not needed.

63
New cards

Set in Order (Seiton)

The second 'S'; arranging necessary items so they are easy to find and use ("A place for everything, and everything in its place").

64
New cards

Shine (Seiso)

The third 'S'; cleaning the workspace and equipment regularly to maintain standards and spot defects.

65
New cards

Standardize (Seiketsu)

The fourth 'S'; creating consistent procedures and rules for the first three S's.

66
New cards

Sustain (Shitsuke)

The fifth 'S'; maintaining the discipline to follow the 5S rules continually.

67
New cards

Visual Factory / Visual Management

Using visual indicators, displays, and controls so anyone can immediately understand the status of a process.

68
New cards

Gemba

The Japanese term for "the real place"; the physical location where the actual value-creating work happens.

69
New cards

Gemba Walk

Management going to the Gemba to observe the process, show respect to workers, and ask questions.

70
New cards

Andon

A visual feedback system (often a light or board) that indicates process status and alerts operators to problems.

71
New cards

Kanban

A visual signaling tool (often a card) used to trigger production or the movement of materials in a Pull system.

72
New cards

Just-In-Time (JIT)

Producing and delivering exactly what is needed, exactly when it is needed, in the exact amount needed.

73
New cards

Poka-Yoke

"Mistake-proofing"; a mechanism or design that prevents a user from making an error (e.g., a USB plug).

74
New cards

Heijunka

Production leveling or smoothing; manufacturing a mix of products at a steady rate to reduce Mura (unevenness).

75
New cards

Jidoka

"Autonomation" or automation with a human touch; the ability for a machine to detect a defect and stop itself automatically.

76
New cards

SMED (Single-Minute Exchange of Die)

A system for drastically reducing the time it takes to complete an equipment changeover or setup.

77
New cards

Takt Time

The pace of production required to meet customer demand (AvailableĀ TimeCustomerĀ Demand\frac{\text{Available Time}}{\text{Customer Demand}}).

78
New cards

Cycle Time

The time it takes to actually complete one unit of a product from start to finish on the line.

79
New cards

Lead Time

The total time from when a customer places an order until the customer receives the finished product.

80
New cards

Cellular Manufacturing

Arranging workstations and equipment into a sequence (often U-shaped) that supports a smooth flow of materials.

81
New cards

Continuous Flow (Single Piece Flow)

Moving one item at a time through the process steps without batches or queues.

82
New cards

Batch and Queue

Traditional mass production where items are processed in large groups and sit waiting for the next step.

83
New cards

WIP (Work In Process)

Partially finished goods that are currently at various stages of the production process.

84
New cards

Bottleneck

The slowest step or resource in a process that dictates the maximum capacity of the entire system.

85
New cards

Theory of Constraints (TOC)

A management philosophy that focuses on identifying and improving the bottleneck to improve overall system flow.

86
New cards

Value Stream Mapping (VSM)

A visual tool used to document, analyze, and improve the flow of materials and information required to bring a product to a customer.

87
New cards

Current State Map

A VSM that shows how the process is operating right now, highlighting wastes and delays.

88
New cards

Future State Map

A VSM that shows how the process should operate after Lean improvements are implemented.

89
New cards

Spaghetti Diagram

A visual map showing the physical path of a product or worker to highlight wastes of motion and transportation.

90
New cards

Overall Equipment Effectiveness (OEE)

A metric that measures the percentage of manufacturing time that is truly productive (AvailabilityƗPerformanceƗQuality\text{Availability} \times \text{Performance} \times \text{Quality}).

91
New cards

Check Sheet

A simple, structured form used to collect and record data in real-time at the location where the data is generated.

92
New cards

Histogram

A bar graph that shows the frequency distribution of continuous data, revealing the shape, center, and spread.

93
New cards

Pareto Chart

A specialized bar chart arranged in descending order to highlight the most significant factors (based on the 80/2080/20 rule).

94
New cards

Cause-and-Effect Diagram (Fishbone)

A visual tool used to brainstorm and categorize the root causes of a specific problem.

95
New cards

Scatter Diagram

A graph of plotted points that shows the relationship (correlation) between two numerical variables.

96
New cards

Flowchart (Process Map)

A visual representation of the sequential steps, decisions, and handoffs in a process.

97
New cards

Control Chart

A line graph with statistical upper and lower limits used to monitor process performance over time.

98
New cards

80/20 Rule (Pareto Principle)

The concept that roughly 80%80\% of the effects (or problems) come from 20%20\% of the causes.

99
New cards

Run Chart

A simple line graph plotting data over time, used to identify trends or patterns before applying control limits.

100
New cards

Stratification

The technique of separating data gathered from a variety of sources so that patterns can be seen (often used in combination with other tools).