CCE 102 Exam 2

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/30

encourage image

There's no tags or description

Looks like no tags are added yet.

31 Terms

1
New cards

Embodied carbon

Emissions produced to construct the building (15%)

2
New cards

Operational Carbon

Emissions used in the operation of a building (27%)

3
New cards

How much carbon emissions come from built environment?

42%

4
New cards

Cradle to grave

Assesses a products entire environmental impact from raw material to final disposal

5
New cards

Cradle to gate

Assesses only the manufacturing process from raw material extraction to teh factory gate

6
New cards

Mitigate

To make less bad

7
New cards

Adaptation

Live with the new conditions

8
New cards

Resilience

Ability to bounce back

9
New cards

4 R’s of Resilience

Robustness, Redundancy, Rapidity, and Resourcefulness

10
New cards

Robustness

Ability to withstand stress without loss of service

11
New cards

Redundancy

Back-up or alternative to provide service

12
New cards

Rapidity

Ability to quickly bring back service

13
New cards

Resourcefulness

Using material and available human resources creatively, effectively, and adaptively

14
New cards

NEPA (National Environmental Policy Act)

Federal law requiring governments to evaluate evironmental impacts before taking action

15
New cards

CATEX

Categorial Exclusion - when project is determined to not have a significant impact on environment

16
New cards

EA (Environmental Assessment )

Identifies if there are any likely environmental impacts

17
New cards

FONSI (Finding of No Significant Impact)

Files this if impacts were minimal or negligible

18
New cards

EIS (Environmental Impact Statement)

Detailed analysis of all the alternatives across multiple dimensions

19
New cards

ROD (Record of Desicion)

Filed after EIS is reviewed

20
New cards

Reuse

The process of repurposing infrastructure into a newer building while perserving the orginal structure

21
New cards

Recirculation

Designing systems so that materials, water, and energy remain in use for as long as possible

22
New cards

Regenerative

Beyond minimizing harm, seeking to restore and imporve ecological and social systems through infrastructure design (Green infrastructure)

23
New cards

Urban Regeneration

Using buildings for multiple uses

24
New cards

Desicion Framework

Structure that is used to evaluate options, compare trade-offs, and guide decision making

25
New cards

LEED

For buildings, how you qualify certain steps and reduce environmental impact

26
New cards

Envision

Infrastructure projects, looks at 64 indicators across 5 categories, all civil and public infrastructure

27
New cards

How much carbon emissions does concrete release?

8%

28
New cards

How much is one cubic ton of CO2

33ft, 2.5 cubic meters of concrete, 2,500 miles, 150,000 cell phone charges

29
New cards

Ecological Footprint

Demand

30
New cards

Biocapacity

ecological supply

31
New cards