New cards

order of magnitude

cost estimation level based on I/O diagrams and BFDs and uses experience and published data to produce a -50%/+100% estimate

2
New cards

study

cost estimation level based on PFDs, bulk materials list, and preliminary equipment capacities that produces a -25%/+40% estimate

3
New cards

direct costs

costs associated with equipment, materials, and installation labor

4
New cards

indirect costs

costs associated with shipping/freight, overhead (paying project manager and finance people), and engineering (design building plans and architecture)

5
New cards

fixed capital investment

direct costs + indirect costs + contingency and cont

6
New cards

working capital

things like spare parts, inventory, chemicals, and catalysts that can quickly be converted into money

7
New cards

total capital investment

fixed capital investment + working capital

8
New cards

by process module/Guthrie-Alrich method

way to organize capital cost estimates that uses cost correlations to obtain purchased equipment cost (Cp) and estimate other costs, used for larger projects with at least three major unit operations; obtain major costs and use factors for other costs

9
New cards

by work classification/retrofit method

way to organize capital cost estimates that is used for small piping modifications, controls projects, equipment replacement projects; use RoT for piping and instrumentation, and factors for other equipment costs

10
New cards

order of magnitude cost estimate

use 0.7 power law factor or Lang factor method that multiplies the purchase price of major equipment based on plant type (for greenfield plants)

11
New cards

2.5 or 4.0

Fbm for equipment in retrofit project that is equipment dominated or controls dominated

12
New cards

operating costs

recurring costs associated with keeping a facility in operation and producing product

13
New cards

fixed costs

costs that are independent of production level, like insurance

14
New cards

variable costs

costs that are dependent on production level, like raw materials