Vocabulary practice flashcards covering industrial and commercial electrical principles from Phase 6 Theory Paper T2, including security alarms, fire alarm design, metering, power factor correction, switchgear, earthing, hazardous areas, and renewable microgeneration.

41 Terms

1
New cards

Passive Infrared (PIR) Detector

An intruder alarm detection device that detects moving thermal energy by sensing changes in the infrared radiation emitted by warm bodies moving across its coverage zones.

2
New cards

PIR Detector Wiring Connections

The standard wiring arrangement for a wired detector consisting of DC supply power terminals (+12 V+12\,V and 0 V0\,V), a normally closed alarm loop circuit, and a continuous tamper detection circuit.

3
New cards

Pressure Mat (Alarm System)

A normally open contact detector constructed from two flexible conductive metal sheets separated by a resilient perforated insulating foam layer that closes an electrical circuit when stepped on.

4
New cards

Addressable Fire Detection Loop

A two-wire circuit topology where each field device (detector, call point, interface module) has a unique digital address and communicates bidirectional data and status signals directly with the fire alarm control panel.

5
New cards

Addressable Fire System Benefit

Pinpoints the exact physical location and individual identity of any activated detector or fault on the loop, rather than indicating only a general collective zone.

6
New cards

Fire Alarm Category L

A classification of automatic fire detection and alarm systems specifically intended for the protection of human life.

7
New cards

Fire Alarm Category P

A classification of automatic fire detection and alarm systems specifically intended for the protection of property and preservation of the building.

8
New cards

Fire Alarm Category M

A manual fire alarm system that relies exclusively on manual call points without any automatic fire detectors.

9
New cards

Fire Alarm Category L1

A comprehensive life-safety system providing automatic fire detection installed throughout all areas of a building, including circulation paths, rooms, and roof voids.

10
New cards

Fire Alarm Category L2

A life-safety system providing automatic fire detection in all escape routes, rooms opening onto escape routes, and identified high-fire-risk spaces within a building.

11
New cards

Fire Alarm Category L3

A life-safety system providing automatic fire detection installed only within escape routes and rooms opening directly onto those escape routes.

12
New cards

Fire Alarm Category L4

A life-safety system providing automatic fire detection installed exclusively within defined circulation paths and escape routes, such as corridors and stairways.

13
New cards

Manual Call Point (MCP)

A wall-mounted initiation device ('break glass') that signals a fire condition to the control panel by closing an electrical switch contact or switching an alarm resistor into the circuit when its frangible element is broken.

14
New cards

Current Transformer (CT)

An instrument transformer used to step down high primary currents safely and proportionally to a standardized secondary current (typically 5 A5\,A or 1 A1\,A) for metering and protective relays.

15
New cards

CT Multiplier

The scaling factor derived from the current transformer ratio (IprimaryIsecondary\frac{I_{\text{primary}}}{I_{\text{secondary}}}) that multiplies the secondary ammeter reading to determine the actual line current.

16
New cards

Open-Circuit CT Hazard

The dangerous induction of extremely high, lethal terminal voltages and core overheating caused by the absence of demagnetizing secondary current flux while primary current continues to flow.

17
New cards

Maximum Demand Charge

An electricity supply tariff component charged based on the peak rate of power consumption (measured in kWkW or kVAkVA) recorded during a billing cycle.

18
New cards

Public Service Obligation (PSO) Levy

A statutory levy charged to all electricity consumers to support national energy policy objectives, including renewable electricity generation and supply security.

19
New cards

Apparent Power (SS)

The total electrical power supplied to an AC circuit, calculated as S=3×VL×ILS = \sqrt{3} \times V_L \times I_L in a three-phase system and measured in volt-amperes (VAVA or kVAkVA).

20
New cards

Active Power (PP)

The true working power in an AC circuit converted into mechanical work or heat, calculated as P=3×VL×IL×cos⁡(ϕ)P = \sqrt{3} \times V_L \times I_L \times \cos(\phi) and measured in watts (WW or kWkW).

21
New cards

Reactive Power (QQ)

The non-working power that oscillates between magnetic/electric fields and the source in an AC circuit, calculated as Q=3×VL×IL×sin⁡(ϕ)Q = \sqrt{3} \times V_L \times I_L \times \sin(\phi) and measured in volt-amperes reactive (VArVAr or kVArkVAr).

22
New cards

Power Factor Correction (PFC)

The practice of connecting power capacitors in parallel with inductive loads to supply leading reactive current, thereby increasing the overall power factor toward unity and reducing demand current.

23
New cards

Air Circuit Breaker (ACB)

A high-current low-voltage mechanical switching device with contacts that open in atmospheric air, typically installed at the main intake of large switchboards to provide overload and short-circuit protection.

24
New cards

Magnetic Blowout

An arc-quenching feature in heavy-duty circuit breakers where an electromagnetic field directs the drawn switching arc upwards into metal splitter plates (arc chutes) to be stretched, cooled, and rapidly extinguished.

25
New cards

Rated Breaking Capacity

The maximum prospective fault current (expressed in kAkA) that a protective device such as an MCB can safely interrupt at rated operational voltage without damage or danger.

26
New cards

Prospective Fault Current (PFC)

The highest theoretical current that would flow in an electrical circuit at a given point under dead short-circuit or negligible-impedance earth-fault conditions.

27
New cards

Lock-Out / Tag-Out (LOTO)

A systematic safety procedure that isolates, locks in the open position, tags with warning notices, and verifies de-energized status on electrical equipment before work begins.

28
New cards

Three-Point Earth Resistance Test

A fall-of-potential testing method that measures the resistance of an earth electrode by injecting AC current through an auxiliary current spike and reading the voltage drop with an intermediate potential spike.

29
New cards

Auxiliary Test Electrodes

Temporary metal spikes driven into the ground at specified distances to establish a return circuit and reference potential zone during earth-electrode resistance testing.

30
New cards

Residual Current Breaker with Overcurrent Protection (RCBO)

A combined circuit protection device that incorporates both the thermal-magnetic overcurrent/short-circuit protection of an MCB and the earth-leakage tripping protection of an RCD.

31
New cards

TN-C-S Earthing System

An earthing arrangement where the supply combines neutral and protective earth into a single PEN conductor up to the intake point, after which separate protective earth (PEPE) and neutral (NN) conductors run throughout the installation.

32
New cards

TT Earthing System

An electrical earthing system where the supplier neutral is earthed, but exposed conductive parts of the installation are connected directly to an independent local earth electrode.

33
New cards

Lightning Protection System (LPS)

An external building network comprising air termination devices, down conductors, and earth termination electrodes designed to intercept, channel, and safely dissipate lightning discharge currents into the ground.

34
New cards

On-Line (Double-Conversion) UPS

An uninterruptible power supply topology where incoming AC power is continuously rectified to DC to charge batteries and power the inverter, providing seamless, regulated output power with zero transfer switching time.

35
New cards

Off-Line (Standby) UPS

A UPS arrangement that powers the load directly from raw AC mains under normal conditions, only switching over to battery inverter power via a transfer switch upon mains failure.

36
New cards

Flashpoint

The lowest liquid temperature at which a substance produces sufficient flammable vapour to ignite briefly when exposed to an external ignition source.

37
New cards

Dust Zone 20

A hazardous area classification in which combustible dust in the form of a cloud is present continuously, for long periods, or frequently under normal operating conditions.

38
New cards

Dust Zone 22

A hazardous area classification in which explosive combustible dust clouds are unlikely to occur during normal operation, and if they do occur, will persist only for a short duration.

39
New cards

Zener Diode Safety Barrier

An energy-limiting circuit interface consisting of a fast-acting fuse, shunt Zener diodes, and a series current-limiting resistor with a dedicated earth that prevents excessive voltage or current from entering an explosive hazardous area.

40
New cards

Standard Test Conditions (STC)

The reference laboratory test conditions for rating photovoltaic modules, defined by an irradiance of 1000 W/m21000\,W/m^2, a cell operating temperature of 25∘C25^\circ C, and an air mass spectral distribution of AM 1.5AM\,1.5.

41
New cards

Air Mass (AMAM)

The relative optical path length that direct solar radiation travels through the Earth's atmosphere relative to the path length at zenith (AM 1.0AM\,1.0), which determines spectral attenuation and irradiance reaching a PV module.