1/63
Looks like no tags are added yet.
Market
Defined area or property class
Submarket
Smaller, more concentrated market within larger area
Metropolitan Statistical Area (MSA)
Surrounding suburbs and cities around one central location
Market Segmentation
How a market is broken down (demographics, psychographics, etc.)
Comparable Property
Fall within same submarket and similar tenants
Physical Occupancy
How many tenants are in one building
Economic Occupancy
How many people are paying market rental rates
Construction Pipeline
Projects that are pending approval, proposed, or being constructed
Market Rent
Average rent of comparable properties
Demographics
Statistical representation of a population (age, gender, income)
Psychograpics
Behavioral aspects of population (behavior, lifestyle)
Gross Absorbtion
Measures market activity —> total square footage of leases signed in a year
Net Absorption
Net Absorption = New Leases - vacancies - construction
Mezzanine Financing
Debt, equity, and a third component from a 2nd mortgage or ownership interest in borrowing entity
Loan to Value
Below 80% requires insurance —> LTV = Loan / Property Value
Debt Service Coverage Ratio
Measures the borrower’s ability to make payments on a loan (1.20)
DSCR= Net Operating Income / Debt Service Payment
Debt Yield Ratio
Used by banks as measure of risk (7-10%)
DYR = Net Operating Income / Loan Amount
Capital Stack
The difference between the debt and equity used to finance a property
Recourse Loan
Banks can sue owner of a property if the proceeds do not satisfy debt
Non-recourse Loan
The bank can only use the property as collateral and cannot sue for shortfall
Term Sheet
Requirements by bank for loan and debt service (LTV, DSCR, DYR)
Land Acquisition Loan
LTV around 40% and higher interest due to riskiness
Construction Loan
LTC of 60% and high interest
Permanent Financing
Financing from insurance companies over a long period of time
Stabilized Property
Leased property with occupancy in line with overall market
Net Operating Income
“Profit” from operating real estate asset after expenses
NOI = Effective Gross Income - Operating Expenses
Cap Rate
Higher CAP —> Riskier
CAP = NOI / Property Value
Proforma
Estimates the size, timing, and risk of future cash flows
Gross Potential Rent
Profit from units that are rented and vacant at current market rates
Vacancy Loss
Reduction to GPR assuming inconsistent vacancy
Collection Loss
Allowance for the nonpayment of rent by tenants
Effective Gross Income
Balance remaining after allowances are deducted from gross potential rent
Operating Expenses
Necessary expendiatures for daily operations
Capital Expenses
Replacement of key building systems (roof, HVAC)
Loan Constant
Number used to calculate debt service for every $1 borrowed
Cash-on-cash Returns
Measures the annual cash flow earned relative to the initial cash invested
Yield Maintenance
Prepayment penalty compensating lender for lost interest
Defeasance
Borrower replaces property collateral with government securities to cover payments
Site Control
Owning the land being developed
Feasibility Analysis
Determines if a development if financially worthwile
Land Planner
Determines most profitable use for a site and its functions
Architect
Designs and aesthetics the new development
Soils Engineer
Determine the most appropriate foundation
Environmental Engineer
Assesses soil, surface and ground water to prevent contamination
Civil Engineer
Designs infrastructure of a site, street, utilities, and drainage
Structural Engineer
Review proposed construction for design and safety of structures
Mechanical Engineer
Designs HVAC and plumbing systems
Electrical Engineer
Design of electrical power throughout development
Entitlement
Meeting with local government/municipality to approve developments
Financing
Gauging interest of banks to loan money for construction (LTC max of 50%)
Soft Costs
Costs not directly involved with building of a project (fees)
Hard Costs
Materials and other costs directly involved with development
Interest Reserve
Money set aside from construction loan to cover interest payments
Construction
Stage where physical construction begins
Marketing/Leasing
New tenants pay rent and occupy space
Pre-leasing
Used to get tenants signed before project is complete to reduce risk
Operations
Involves the day-to-day running of a property (stabilized)
Disposition
The sale of a property
Property Option
Allows developers the right to buy property later for a premium
General Contractor
Leads the entire project and manages materials, labor, and oversight
Developer
“Quarterback” that leads the team
Entitlement Risk
Risk that a project will not be approved by the city
Land Assemblage
Gaining control of several adjacent parcels and merging themL
Lease-up Risk
Risk that it will take longer than projected for a property to become stabilized