Motion Study, Work Measurement, MRP, and ERP Concepts

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/49

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering key terms and definitions from Motion Study, Work Measurement Methods, Material Requirements Planning (MRP), and Enterprise Resource Planning (ERP).

Last updated 7:00 AM on 10/7/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

50 Terms

1
New cards

Motion study

The systematic study of the human motions used to perform an operation, introduced by Frank Gilbreth in the early 20th century to eliminate unnecessary motions and identify the best sequence of motions.

2
New cards

Motion study principles

Guidelines for designing motion-efficient work procedures, categorized into the use of the human body, arrangement of the workplace, and the design of tools and equipment.

3
New cards

Therbligs

Basic elemental motions into which jobs are broken down to analyze and base work method improvements upon.

4
New cards

Search

A therblig that implies hunting for an item.

5
New cards

Select

A therblig defined as choosing from a group of objects.

6
New cards

Grasp

A therblig defined as taking hold of an object.

7
New cards

Hold

A therblig defined as the retention of an object after grasp.

8
New cards

Transport

A therblig defined as the movement of an object after hold.

9
New cards

Release

A therblig defined as depositing an object.

10
New cards

Micromotion study

The use of motion pictures and slow motion to study motions, introduced by Frank Gilbreth along with his wife, Lillian.

11
New cards

Simo chart

A chart used to study simultaneous motions of the hands, useful in studying data entry, sewing, surgical and dental procedures, and certain assembly operations.

12
New cards

Work measurement

The length of time it should take to complete a job.

13
New cards

Standard time

The amount of time it should take a qualified worker to complete a specified task.

14
New cards

Stopwatch time study

A work measurement method introduced by Frederick Winslow Taylor in 18811881 to develop a time standard based on observations of one (11) worker taken over a number of cycles.

15
New cards

Observed time

The simple average of recorded times in a time study, calculated as OT=∑xinOT = \frac{\sum x_i}{n}.

16
New cards

Normal time

The observed time adjusted for worker performance, calculated by multiplying observed time by a performance rating (NT=OT×PRNT = OT \times PR) or on an element-by-element basis (NT=∑(xˉi×PRi)NT = \sum (\bar{x}_i \times PR_i)).

17
New cards

Standard elemental times

Time standards derived from a firm's own historical time study data.

18
New cards

Predetermined time standards

Work measurement standards based on published data of standard elemental times collected from large numbers of workers.

19
New cards

Methods-Time Measurement (MTM)

A commonly used predetermined time standard system developed by the Methods Engineering Council that analyzes any manual operation or method into basic motions.

20
New cards

Work sampling

A method of estimating the proportion of time a worker or machine spends on various activities and idle time through brief observations at random intervals.

21
New cards

Ratio-delay studies

A primary use of work sampling designed to determine the percentage of a worker's time that involves unavoidable delays or the proportion of time a machine is idle.

22
New cards

Analysis of nonrepetitive jobs

A primary use of work sampling designed to establish the percentage of time an employee spends doing various tasks.

23
New cards

Material Requirements Planning (MRP)

A system used for planning the production of assembled products, designed to answer 'what is needed?', 'how much is needed?', and 'when is it needed?'.

24
New cards

Master schedule

Also referred to as the master production schedule; an MRP input that states which end items are to be produced, when they are needed, and in what quantities.

25
New cards

Bill of materials

An MRP input containing a listing of all assemblies, parts, components, and raw materials needed to produce one unit of a finished product.

26
New cards

Inventory records

Stored information on the status of each item by time period (called time buckets), including quantities on hand, ordered, and other details.

27
New cards

MRP processing

The process of taking end item requirements specified by the master schedule and 'exploding' them into time-phased requirements for assemblies, parts, and raw materials.

28
New cards

Gross requirements

Total expected demand for an item or raw material.

29
New cards

Scheduled receipts

Open orders scheduled to arrive from vendors or elsewhere in the pipeline.

30
New cards

Projected on hand

Expected amount of inventory that will be on hand at the beginning of a period.

31
New cards

Net requirements

The actual amount of inventory needed.

32
New cards

Planned-order receipts

Quantity expected to be received by the beginning of the period.

33
New cards

Planned-order releases

Planned amount to order in each time period, equal to planned order receipts offset by lead time.

34
New cards

Planned orders

A primary MRP output report indicating a schedule for the amount and timing of future orders.

35
New cards

Order releases

A primary MRP output report that authorizes the execution of planned orders.

36
New cards

Changes to planned orders

A primary MRP output report covering revisions of due dates, order quantities, or cancellations.

37
New cards

Performance-control reports

Secondary MRP reports that evaluate system operation, aid managers by measuring inconsistencies from plans, and provide information to assess cost performance.

38
New cards

Planning reports

Secondary MRP reports useful in forecasting future inventory requirements, such as purchase commitments and other data.

39
New cards

Exception reports

Secondary MRP reports that call attention to major discrepancies such as late and overdue orders, excessive scrap rates, reporting errors, and requirements for nonexistent parts.

40
New cards

Enterprise Resource Planning (ERP)

A computerized system designed to connect all parts of a business organization and supply chain to a single database.

41
New cards

Accounting/Finance Module

Central component of an ERP system that provides a range of financial reports.

42
New cards

Marketing Module

ERP module that supports lead generation, target marketing, mail, and sales.

43
New cards

Human Resources Module

ERP module that maintains a complete database of employee information.

44
New cards

Purchasing Module

ERP module that facilitates vendor selection, price negotiation, purchasing decisions, and payments.

45
New cards

Production Planning Module

ERP module that integrates information on forecasts, orders, production capacity, and related scheduling.

46
New cards

Inventory Management Module

ERP module that identifies inventory requirements, availability, tracking, and replenishment rules.

47
New cards

Distribution Module

ERP module containing information on third-party shippers, shipping, and delivery.

48
New cards

Sales Module

ERP module containing information on customer orders.

49
New cards

Supply Chain Management Module

ERP module that facilitates supplier and customer management.

50
New cards

Customer Relationship Management Module

ERP module containing contact information, buying behavior, shipping preferences, and anything related to customers.