Business Strategy-Midterm

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/49

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 12:05 PM on 10/14/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

50 Terms

1
New cards

Mission; Strategy

_______________ defines what you are doing; ________________ describes how you are going to do it.

2
New cards

False

Control should be exercised over what is unimportant (T/F)

3
New cards

Count the costs

In Luke 14:28, Jesus challenges the disciples to ____________ ________ ______________ when considering future plans.

4
New cards

Clarify positions after taking action

Of the four steps of uniting stakeholders, which of the following is NOT one of the steps.

5
New cards

Pessimistic

In the three-point estimating technique for a WBS, one uses the optimistic, _____________, and most-likely scenario.

6
New cards

Deal with resource limitations

One rule of scheduling is to diagram what is logically possible, then ________________.

7
New cards

Job

When evaluating a project, appraising the progress and performance of the __________ is critical.

8
New cards

Float

Once you have used up the _________ in a task, it becomes part of the critical path.

9
New cards

To simplify the chain of command

Which of the following is NOT a reason managers need people skills.

10
New cards

True

The Critical Path Method (CPM) finds the longest path through a project using the most critical series of tasks (T/F).

11
New cards

False

People who do the work should not participate in the plan (T/F).

12
New cards

True

Project management may not necessarily be technical in nature, but has technical aspects to it (T/F).

13
New cards

Want

"Dictators get people to do things, leaders get people to ____________ to do things."

14
New cards

Activity of completion

In an arrow diagram, the nodes are representative of milestones and the arrows represent _____________.

15
New cards

True

A total path with no float is called the critical path (T/F).

16
New cards

Building the gates

One way to look at the wall Nehemiah built was to see the work breakdown structure. It would have included defining the wall to be built, setting up the work teams, starting on the wall, and __________________________.

17
New cards

True

The mission of a project is always to achieve the vision (T/F).

18
New cards

Goal: Build walls partially within 52 days

Which of the following was NOT a part of Nehemiah's project to rebuild the walls of Jerusalem?

19
New cards

Power; Decisions

There are two kinds of authority: ______________ over people and ability to make ____________ and act unilaterally.

20
New cards

True

The benefit of the work breakdown structure (WBS) is that is makes it easier to estimate knowledge tasks than other tools (T/F).

21
New cards

True

A paradigm is a belief about what the world is like (T/F).

22
New cards

Manager; Leader

A project manager must be both a _____________ and a ______________.

23
New cards

They help to set a realistic project timeline

Why should you account for weekends, holidays, and other breaks in developing a work schedule?

24
New cards

Maintenance and improvement

In a project review meeting, there are two aspects to project control:

25
New cards

Bar chart and arrow diagram

What are the two types of project scheduling diagrams?

26
New cards

Living a complete (public and private) life in conformance to God's will

When thinking of integrity, what is God's description of it?

27
New cards

Helps to prioritize risk

A risk matrix is a tool that __________________.

28
New cards

True

A risk management plan is a process (T/F).

29
New cards

Anyone with a vested interest in a project's outcome

Who are project stakeholders?

30
New cards

Reveal problems late for easy resolution

Of the reasons for conducting periodic project reviews, which of the following is NOT one:

31
New cards

All of the above

Which of the following is a type of procurement?

32
New cards

None of the above

Project plan ingredients do NOT include which of the following?

33
New cards

Humility

Philippians 2:3-8 presents the ____________ of Christ as an example of us.

34
New cards

Duration

In scheduling, ES stands for Early Start, EF stands for Early Finish, LS stands for Late Start and DU stands for ___________________.

35
New cards

Planning

When Nehemiah was reviewing the state of the wall around Jerusalem at night, his activities were most closely related to:

36
New cards

Kept on the radar

A person with low influence and a negative attitude about the project should be:

37
New cards

Things get worse

What happens when information is delayed when implementing a control system?

38
New cards

Proverbs 27:23

"Know the condition of your flocks" is a principle found in which Bible verse?

39
New cards

Project

Risk management is defined as the systematic process of identifying, analyzing, and responding to _________________ risk.

40
New cards

Mitigate

Step four in the risk management process is to prevent or ___________ the risk.

41
New cards

A temporary endeavor undertaken to create a unique product, service, or result

What is the definition of a project?

42
New cards

None of the above

Which of the following are NOT an element of the communication plan?

43
New cards

Believe

The definition of leadership states that it is the art of getting others to want to do something that you ______________ should be done.

44
New cards

Humility

According to Philippians 2:3, the most important aspect of a believer's life is:

45
New cards

Definition; Execution

A project life-cycle includes the following five elements: concept, ______________, planning, _______________, and closeout.

46
New cards

Project plan

Strategy, tactics, and logistics are three components of a _______________ ___________________.

47
New cards

Before the schedule

When should you develop a WBS?

48
New cards

False

A lack of planning causes projects to succeed (T/F).

49
New cards

Gap

Problems exist when there is a _____________ between the current situation and reaching the goal.

50
New cards

Mind

In Proverbs 16:9, the _________________ of a man plans his ways, but the Lord directs his steps.