Interior Design
a professional and comprehensive practice that involves creating interior environments that address, protect, and respond to human needs
Profession
a paid occupation, especially one that involves prolonged training and a formal qualification; based on theoretical and practical knowledge and training in a particular field
Value of Interior Design
intangible; it does not exist until it is complete
Aphanthasia
being able to picture a space or an object while closing your eyes; genetic ability that not everyone possesses
ethical standards
defines what constitutes right and wrong in terms of professional behavior
Code of Conduct
a formal document that sets behavior expectations, rules, and responsibilities for members of an organization or a specific community
Conflict of Interest
a conflict between the private interests and the official responsibilities of a person in a position of trust
Unethical Behavior
putting personal gain as a priority over the good of the person (client) the designer is supposed to represent
Professional Conduct
professional conduct refers to the acceptable behaviors and ethical expectations of individuals in a profession
Negligence
unintentional misdeed that occurs because of an oversight in the activities and responsibilities of a person in charge
Copyrights
method by which written, artistic, and graphic forms are legally protected; in order to be legally protected, the idea must be put into a physical, tangible form
Instruments of Service
representations in any medium of expression now known or later developed, of the tangible and intangible creative work performed by the Architect and the Architect’s consultant under their respective professional services agreements
code compliance
Designers must comply with building codes, regardless of the client’s requests or their supervisor’s instructions; it is a social responsibility to comply with codes, meet ADA requirements, and consider universal design applications
Contract
an agreement or a formal promise that is made between two or more parties to perform, or not perform, an act of service; verbal agreements do not count
Explain and agree on what the designer will provide and what they will not; outlines what compensation is expected
Purpose of a contract
offer, acceptance, contractual capacity, consideration, mutual assent, legality
Elements of a contract
Offeror
The person or party who makes the contract offer
Offeree
the client
Bids
an invitation to negotiate; not an offer but shows a willingness on the part of the client to enter into discussions with the designer about a potential contract
Counteroffer
If the client asks for some changes in the agreement, then the original offer was not accepted, and an agreement was not reached
Consideration
legal term for the “price” that the offeree “pays” to the offeror for the offeror’s services
Letter of agreement
a contract that is less formal in terminology; often used with clients that do not like the idea of signing a contract for design services
client relationships
clients prefer to work with someone that they already know; developing loyalty to a designer or design company
Confidentiality
Ask permission to tape-record any meetings; do not photograph the interiors of the job-site without permission
Demographics
characteristics associated with buyers that can help individuals identify and differentiate the groups they target
Examples of demographics
different cultures, ethnicities, ages, private family home in a community, young single individual, seniors downsizing from a large house to an independent living apartment, verity in the type of occupancy for which they are requesting services
The Matures
born between 1901-1945; financially conservative, retired/focused on health issues; value trust and quality; wealthy generation; purchase smaller homes
The Baby Boomers
born between 1946-1964; considered to be the wealthiest generation; work as business owners/leaders’ downsizing homes; quality is a priority; prefer face-to-face business
Generation X
born between 1965-1979; tech savvy; wide acceptance of online purchasing; entering peak earning years; entrepreneurial; want proof information (tough customers); less trusting; highly education; more environmentally conscious
Millennials
born between 1981-1996; lead in use of social media; lead buyers with online consumerism; interested in environmental issues and social responsibility; more diverse and highly educated; value individuality; are impatient
Generation Z
born after 1996; extensive use of internet; culturally diverse group; knowledgeable consumers due to digital searching and purchasing
Time management
A design firm will rarely work on only one project at a time, making scheduling another critical task; following the phases of the design process is important when defining the sequence of tasks
Programming
main goal during this phase is to determine how much space you need now and in the future, and how that space will be utilized; this phase is the information-gathering portion of a project
schematic design
the designer takes the ‘program requirements’ and beging the process of translating it into an efficient building design
Design Development
this phase is a much more detailed set of drawings than the schematic phase; interior layouts are complete, room sizes are finalized, and materials have been selected
construction documents
this phases takes the design development drawings and specifications and fills in the details that will enable a contractor to build the project
bidding
obtaining bids from contractors to do the work
Construction Administration
involves monitoring the construction to verify that it is happening in accordance with the construction documents prepared
Competitive biding
a process whereby the client obtains comparative prices from a number of contractors and/or vendors for the construction or supply of the products needed for the project
Project management
the process of organizing and controlling all tasks and resources for an interior desing project, from start to finish
80/20 Rule
The idea that a small number of the things you do often produce the greatest impact; the goal is to identify those high-value activities and give them more of your time and attention
Building Information Modeling (BIM)
use of virtual building models to develop building design solutions, design documentation, and to analyze construction processes
fee
the term used to represent the price of services
quate or budget sheet
the term used for the pricing of products and goods
list price
what we call “website price”, or the price that will be posted on the manufacturer’s website for furniture
Net and wholesale price
a “special price”, given to a designer by a supplier, which is lower than what it would cost the consumer
Cost price
somewhere in between the wholesale price and the list price
discount
a reduction, usually stated as a percentage, from the suggested retail price
margin
designer or design firm will add a percentage for the merchandise services they are providing
Freight
the cost and process involved in the delivery of merchandise; also called shipping
FOB (Free on Board or Freight on Board)
the manufacturer is responsible for the cost of loading the goods onto a freight truck or train
Sales Tax
Almost all jurisdictions require sales tax to be collected on products considered to be tangible and sold to clients
Scope Creep
when client-initiated changes and/or additions to the project occur
Cost Plus Percentage Markup
The client agrees to pay a specific markup on the actual cost of the merchandise and other items that the designer sells to the client
Billing Rate
a dollar amount charged for each design professional, staff member, or the type of service provided; used to calculate fixed fees
Hourly billing rates
commonly charged based on the professional level of employees, as an average of all the rates of the various levels of design staff, or based on the kind of service rather than the personnel used
fixed fee/flat fee
a set, predetermined price
CDs (contract documents)
consists of all the construction drawings, specifications, and contracts or agreements between the designer and the project owner and other that might be involved in the construction of the project
Construction Drawings
include dimensioned partition drawings; section drawings; mechanical drawings, including electrical and telephone location plants; reflected ceiling plans; plumbing plans; HVAC plans; interior construction elevations; and construction details
Schedules
an important part of the instructions concerning how a project is to be completed
Specifications
portion of the contract documents that contains the written instructions to the general contractors and vendors
Proprietary Specification
names the products and materials by manufacturer’s name, model number, or part number
“or equal”
specification that means products that are the same as, or very close to, what has been specified will be considered
Base Bid
means that all people who wish to provide materials for the project must base their bid on the product named in the specification
Open bid or open specification
allows other products to be substituted for the item specified
Descriptive Specification
does not use a manufacturer’s name or trade name for the goods being specified, but instead writes out the details, materials, workmanship, fabrication methods, and installation of required goods
Specification Language
should be kept clean and direct; clarity leaves little room for argument as to the designer’s intent