Inventory Management: EOQ, Reorder Points & Newsvendor

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/7

encourage image

There's no tags or description

Looks like no tags are added yet.

8 Terms

1
New cards

EOQ vs Reorder point

EOQ answers HOW MUCH to order (ordering vs holding cost). Reorder point answers WHEN to order (lead time, variability, service level). Different questions.

2
New cards

Lead time shortens

EOQ unchanged. Reorder point falls (less lead-time demand and less safety stock).

3
New cards

What raises safety stock vs what doesn't

Raises: higher service level, more demand variability, longer lead time. No effect: order quantity, ordering cost.

4
New cards

Cycle stock vs Safety stock vs Pipeline stock

Cycle = average from ordering in batches (Q/2). Safety = buffer for demand variability during lead time. Pipeline = units in transit.

5
New cards

Newsvendor vs EOQ

Newsvendor = ONE order for one season or day, leftovers lose value. EOQ = repeated ordering of steady demand all year.

6
New cards

Underage vs Overage cost

Underage = lost profit from running out (price minus cost). Overage = cost of a leftover (cost plus disposal minus salvage).

7
New cards

Critical ratio above vs below 0.5

Above 0.5 = stock MORE than mean demand (running out costs more). Below 0.5 = stock LESS than the mean (leftovers cost more).

8
New cards

Order 20% above the EOQ

Total cost rises only slightly. The cost curve is flat near the EOQ.