BME 481 Post Midterm 1

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/28

encourage image

There's no tags or description

Looks like no tags are added yet.

29 Terms

1
New cards

Mistake proofing examples

gas cap, lawnmower handle, 3-2-4 ss number, ug vs. mg example

2
New cards

Mistake Proofing

making wrong actions more difficult, make possible to reverse actions, make easier to discover errors

3
New cards

Mistake proofing for cars

parking break, new cars automated staying in lane

4
New cards

Constraints

physical (shape/size of objects), logical (, cultural (), semantic()

5
New cards

Opportunities for mistake proofing

customer complants, QCDRs, continually reworking, MRB,

6
New cards

Pull vs. Push

Pull is when there is a signal/demand to replenish an inventory item on the line (out of meat —> get more in the back), push is when its ok for inventory to pile up on the line

7
New cards

Pull system benefits/objectives

management by sight, no excess, shorter cycle time, less material obsolescence/out of style, focus improvement resources on process bottleneck, reflects demand, eliminate product shortages, minimize inventory, improve value stream

8
New cards

Kanban

signal to indicate when more parts are needed. card/empty bin, or in process kanban/card

9
New cards

Challenges to pull

Long changeover time, Unreliable equipment, No quality at the source, No cross-trained operators, The process is not capable, No 5S standards, Operators are not involved in solving problems

10
New cards

Change over time

time between the last good piece off the current run and the first good piece off the next run – at rate

11
New cards

SMED steps

Separate Internal and External Setup Convert Internal Setup to External Setup Streamline Internal and External Elements

12
New cards

SMED

single minute exchange of die (setup reduction)

13
New cards

Steps For Conducting a Pilot of the Study

Plan and design the pilot study, Train personnel on changes, Monitor and support the pilot study, Evaluate results and make recommendations to improve

14
New cards

Kaizen

kaizen is the philosophy of continuous improvement through the removal of wastes in a process

15
New cards

kaizen workshops

Implement rapid process improvements, Short, focused projects (3-5 days), Cross-functional teams, Solutions implemented immediately

16
New cards

Kaizen Workshop addresses…

Customer complaints, Processes that are not clearly defined, Processes that generate a large number of defects, Processes that have not been standardized, Processes that are not error proofed, Processes that have very lengthy cycle times, Setup reduction, Kanban/pull system implementation

17
New cards

Kaizen Roles and Responsibilities

Management, Kaizen lead or facilitator, Team members, Subject matter experts

18
New cards

Kaizen Lead

pre-event planning, facilitate workshop, manage implementation solutions

19
New cards

Tools for kaizen

Value Stream Mapping, 5S, Poka-Yoke, Kanban/Pull, SMED/Changeover, TPM/Total Productive Maintenance, Standard Work

20
New cards

10 step Kaizen work method

1. Identify/clarify the objective 2. Grasp the current situation 3. Visualize/identify the ideal situation 4. Develop/determine the desired targets 5. Establish/create kaizen strategy 6. Develop and make kaizen plan 7. Implement the kaizen 8. Check the effectiveness of the kaizen 9. Document the kaizen activity 10. Confirm the results

21
New cards

PDCA

plan, do check, act

22
New cards

in control process

Cpk = 1 at a minimum

23
New cards

six sigma process

Cpk = 2.0 (defects are 3.4 parts per million)

24
New cards

Elimination

eliminate error prone task or risks in the task

25
New cards

Replacement

26
New cards

Facilitation

27
New cards

Facilitation

28
New cards

Detection

29
New cards

Mitigation