1
New cards

FL-5.1.1 (K2) Exemplify the purpose and content of a test plan

Test plan: documents means and schedule for planning, ensures perofrmed activities will meet established criteria, mean of communication with stakeholders, demonstrates that testing will follow defined test strategy and policy or explan why it will deviate

Test planning guides testers’ thinking to confront future challanges and risks

Test plan includes: context of testing (scope, test objectives, constraints)
Assumptiosn and constraints
Stakeholders (roles, responsibilities
Communication (form and frequency, documents)
Risk register
Test approach (levels, techniques, deliverables, entry/exit criteria, metrics, deviations from test policy)
Budget and schedule

2
New cards

FL-5.1.2 (K1) Recognize how a tester adds value to iteration and release planning

Release planning - write testable user stories and ACs, participate in project and quality risk analysis, estimate test effort for user stories, determie test approach

Iteration planning - detailed risk anylsis of user stories, break down user stories into tasks, estimate effort, identify funtional and non-functional aspects

3
New cards

FL-5.1.3 (K2) Compare and contrast entry criteria and exit criteria

Entry criteria - preconditions to start activity (if not met activity will be difficult and risky to conduct)
Exit criteria - what should be done to declare an activity completed

Entry and exit criteria should be defined for each level

Enry criteria includes: availability of resources and testware, initial quality level of test object
Excit criteria include: measures of thoroughtness (level of coverage, number of unfixed bugs, defect density), completion criteria(planned tests are executed, all found defects are reported)

Running out of budget and tume can be an exit criteria if ctakeholders accepted the risk

In Agile entry criteria - definiton of ready, exit criteria - definiton of done

4
New cards

FL-5.1.4 (K3) Use estimation techniques to calculate the required test effort

Estimation is a prediction of efforts needed to complete the task

Stakeholders should be aware about estimation error

Estimation techniques:

Estimation based on ratios: ratio between deveoopment and test effort is calculate based on previous projects info (e.g. 3:2). Current project development estimation is taken and testing estimation is calculated based on ratio

Extrapolation: velocity based. Historical data from this project is taken and average value is calculated

Wideband Delhi: expert-based. Experts make estimations in isolation, if there’re deviations in results, discussion is held and new round of estimation is taken (e.g. Plannning Poker in Agile)

Three-point estimation - experts give 3 estimations

a - optimistic estimation
m - most likely estimation
b - pessimistic estimation

Estimation is calculated with the formula: E = (a + 4m + b) / 6

Measurement error is calculated too SD = (b - a) /6

5
New cards

FL-5.1.5 (K3) Apply test case prioritization

Prioritization strategies:

Risk-based: test cases covering the most important risks are covered first

Coverage-based: test cases achieving highest coverage are executed first. Another variant - additonal coverage: 1st test case had the biggest coverage, next test case has the biggest amount of unique additional test cases

Requirements-based: the order on based on priorities or requirements, first cover most important

First cover dependencies, then priorities
Both technical and logical dependencies are equally important

6
New cards

FL-5.1.6 (K1) Recall the concepts of the test pyramid

Test pyramid shows that diffetent goals are supported by different levels of test automation

The higher the level, the lower granularity, slower and provide higher coverage

Levels:

UI (e2e)
Service (integration)
Unit (Component)


7
New cards

FL-5.1.7 (K2) Summarize the testing quadrants and their relationships with test levels and test types

Used to ensure that all appropriate teat types and test levels are included in SDLC

Q1 (technlogy facing, support the team) - component, component integration tests. Should be automated

Q2 (business facing, support the team) - fuctional, regression, user story, test cases, prototypes, API, simulations. Can be manual or automated

Q3 (business facing, critique the product) - exploratory, usability, acceprance. Manual testing

Q4 (technolofy facing, critique the product) - smoke, non functional (except usabilty). Automated tests

8
New cards

FL-5.2.1 (K1) Identify risk level by using risk likelihood and risk impact

Risk level consists of risk likehood and impact (harm)

Risk likehood - probability of the risk

Risk impact - consequences of risk occurence

9
New cards

FL-5.2.2 (K2) Distinguish between project risks and product risks

Project risks are process oriented, they are related to management and control of the project
e.g. delays, people issues, technical issue (poor requirements), supplier ieeus

Product risks are related to product quality characteristics
e.g. missing functionality, incorrect calculcation, runtime errors, poor architecture (affects non-functional requirements), inadequate response time, security vunerabilities
As a result users can be dissatisfied, lost of revenue or repitation, damage to third parties, high maintenance cost, criminal penalties, physical damage

10
New cards

FL-5.2.3 (K2) Explain how product risk analysis may influence thoroughness and scope of testing

Provide awareness to focus testing efforts in a way that minimizes level of the risk
Analysis includes risk identification and assessment

Risk identification (brainstorming, workshops, interviews, cause-defect diagrams)
Risk assessment (categorization of identifies risks, define risk likehood, impact and level, prioritize)

Product rirsk are used to: determine scope of testing (to include rirsk), determine test level and types, determine test techniques, estimate test effort, prioritize testing to find critical defects as early as possible, define activities that can be taken to reduce risk

11
New cards

FL-5.2.4 (K2) Explain what measures can be taken in response to analyzed product risks

Risk control includes risk minigation and monitoring

Risk mitigation - implementing actions to reduce risk level (risk mitigation by testing, risk acceptance, risk transfer, contigency plan - what to do whn the risk occurs if we accept it

Risk monitoring - ensure that taken acrions are effective, obtain firther info, identify emerging risks

Mitigation actions include: select testers with appropriate skills, apply needed level of independence of testing, conduct reviews,

12
New cards
FL-5.3.1 (K1) Recall metrics used for testing
13
New cards
FL-5.3.2 (K2) Summarize the purposes, content, and audiences for test reports
14
New cards
FL-5.3.3 (K2) Exemplify how to communicate the status of testing
15
New cards
FL-5.4.1 (K2) Summarize how configuration management supports testingFL-
16
New cards
5.5.1 (K3) Prepare a defect report