Operations Management Exam 2 (Pitt BUSQOM 1070)

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/90

encourage image

There's no tags or description

Looks like no tags are added yet.

91 Terms

1
New cards

Enterprise Resource Planning (ERP)

a computer system that integrates application programs in accounting, sales, manufacturing, and the other functions in a firm

2
New cards

Material Requirements Planning (MRP)

a planning system that schedules the precise quantity of materials needed to make the product

3
New cards

Master Production Schedule (MPS)

A part of the material requirements plan that details how many end items will be produced within specified periods of time

4
New cards

Frozen

No change allowed

5
New cards

Slushly

Limited changes allowed

6
New cards

Liquid

Any changes allowed

7
New cards

Available to Promise

# of units in master schedule - actual customer orders

8
New cards

Bill of Materials (BOM)

document that shows an inclusive listing of all component parts and assemblies making up the final product

9
New cards

Modular Bills

Not final products but components that can be assembled into multiple end items

10
New cards

Planning Bills (pseudo/super bills)

groups subassemblies to reduce the number planned

11
New cards

Phantom Bills

Describe subassemblies that exist only temporarily

Are part of another assembly and never go into inventory

12
New cards

Projected Available Balance

onhand balance - safety stock

13
New cards

Net Requirements

gross - projected available

14
New cards

lot-for-lot (L4L)

an order for the exact amount needed

15
New cards

Least Total Cost (LTC)

carrying and setup costs are mostly equal

16
New cards

Least Unit Cost (LUC)

lot size with lowest unit cost

17
New cards

Stragetic Sourcing

management of supplier relationships to acquire goods/services to achieve the immediate and future needs of the business

18
New cards

Specificity

how common an item is

19
New cards

Request for Proposal (RFP)

a process through which buying organizations invite alternative suppliers to bid on supplying their required components

20
New cards

Vender Managed Inventory

Inventory which is restocked automatically by vendors regardless of a customer's orders

21
New cards

Bullwhip Effect

occurs when distorted product-demand information ripples from one partner to the next throughout the supply chain

22
New cards

Forward Buying

a retailer's stocking up on a product when it is discounted and buying smaller amounts when it is at list price

23
New cards

Continuous Replenishment

supplying orders in a short period of time according to a predetermined schedule

24
New cards

Functional Products

staples that people buy in a wide range of retail outlets, such as grocery stores and gas stations. Longer product life and low lead time

25
New cards

Innovative Products

products such as fashionable clothes and personal computers that typically have a life cycle of just a few months. Unpredictable demand

26
New cards

Stable Products

27
New cards

Evolving Products

28
New cards

Efficient Supply Chain

utilize strategies aimed at creating the highest cost efficiency

29
New cards

Responsive Supply Chain

focus on flexibility and responsive service and are able to react quickly to changing market demand and requirements

30
New cards

Risk-hedging supply chains

utilize strategies aimed at pooling and sharing resources in a supply chain to share risk

31
New cards

Agile Supply Chain

focuses on an organization's ability to respond to changes in demand with respect to volume and variety. Flexible to customer needs

32
New cards

Total Cost of Ownership (TCO)

All of the costs associated with the design, development, testing, implementation, documentation, training and maintenance of a software system.

33
New cards

green sourcing

Making environmentally conscious decisions throughout the purchasing process, beginning with product and process design, and through product disposal

34
New cards

Inventory turnover

cost of goods sold/average inventory

35
New cards

weeks of supply

avg. inventory/cogs X 52

36
New cards

days of supplu

avg. inventory/cogs X 356

37
New cards

Lead Time

the time needed to respond to a customer order

38
New cards

Decoupling Point

Point at which inventory is stored, which allows SC to operate independently

39
New cards

lean manufacturing

the production of goods using less of everything compared to mass production, increases customer service

40
New cards

Production Process

source, make, deliver

41
New cards

make to stock

serve customers from finished goods inventory

42
New cards

assemble to order

preassembled components, subassemblies, and modules are put together in response to a specific customer order

43
New cards

make to order

product is built directly from raw materials and components in response to a specific customer order

44
New cards

engineer to order

Work with the customer to design and then make the product

45
New cards

Little's Law

inventory = throughput rate x flow time

46
New cards

Project

Product in fixed location, equipment is moved

47
New cards

workcenter

similar equipment grouped together

48
New cards

manufacturing cell

produces similar products

49
New cards

assembly line

progressive steps

50
New cards

continuous process

liquids

51
New cards

work cycle time

c = production time per day / output per day

52
New cards

efficiency

total /# of workstations (workcycle time)

53
New cards

breakeven (demand)

fc/$-vc

54
New cards

breakeven (revenue)

fc/1-vc/$

55
New cards

Single Period

one time purchase

56
New cards

fixed order quantity

maintain same stock, resupply when inventory reaches a certain level

57
New cards

fixed time period

order at same intervals of time

58
New cards

independent demand

the demands for various items are unrelated to each other

59
New cards

dependent demand

the need for any one item is a direct result of the need for some other item, usually an item of which it is a part

60
New cards

logistics

the process of coordinating and moving material from one location to another

61
New cards

hub and spoke systems

the sole purpose of the warehouse (the hub) is sorting goods to consolidation areas, where each area is designed for shipment to a specific location

62
New cards

cross docking

large shipments are broken down into small shipments for local delivery in an area and thus minimizes inventory in the warehouse

63
New cards

International logistics

all functions concerned with the movement of materials and finished goods on a global scale

64
New cards

Third-party logistics company

an outside company used to manage all or part of another company’s product delivery operations


Examples: FedEx, UPS, DHL

65
New cards

Highway (truck)

Great flexibility for moving goods to virtually any location not separated by water

66
New cards

Water (ship)

High capacity, relative low operation costs, slow, large areas are not accessible

67
New cards

Air

Fast but very expesnive to operate; small light, expensive items are most appropriate

68
New cards

Rail (trains)

Low-cost alternative; transit times can be long (slow) and may be subject to variability

69
New cards

Pipelines

Highly specialized and limited to liquids and gases; no packaging needed and low cost per mile

70
New cards

Hand Delivery

the last step in many supply chains; slow and costly activity

71
New cards

Proximity to Customers

Location Decision


Helps ensure that customer needs are incorporated into products; fast and frequent delivery (Just-in-time)

72
New cards

Business Climate

Location Decision


Can include presence of similar-sized businesses, in the same industry, and other foreign companies

73
New cards

Total Cost

Location Decision


The objective is to select a site with the lowest total cost (includes labor, transportation, energy, taxes, etc.)

74
New cards

Infrastructure

Location Decision


Adequate road, rail, air, and sea transportation along with energy and telecommunications

75
New cards

Quality of Labor

Location Decision


The educational and skill levels of the labor pool must match the company’s needs

76
New cards

Suppliers

Location Decision


A high-quality and competitive supplier base makes a given location suitable

77
New cards

Other Facilities

Location Decision


The location of other plants or distribution centers of the same company can influence a location decision

78
New cards

Free Trade Zones

Location Decision


A closed facility into which foreign goods can be brought without being subject to customs requirements

79
New cards

Political Risk, Corruption, and other Risks


Location Decision

The fast-changing geopolitical scenes in numerous nations present challenging opportunities

Corruption can be another challenge

80
New cards

Government Barriers

Location Decision


Barriers to enter and locate in many countries are being removed through legislation

81
New cards

Trading Blocs

Location Decision


Agreements that influence location decisions, both within and outside trade bloc countries (USMCA)


82
New cards

Environmental Regulation

Location Decision


The environmental regulations that impact a certain industry in a given location should be included

83
New cards

Host Community

Location Decision


The host community’s interest in having the plant in its midst is a necessary part of the evaluation process

84
New cards

Competitive Advantage

Location Decision


The base location should provide the company with a competitive advantage

85
New cards

Service Facility

Multiple sites close to customers


Location decision closely tied to the market selection


Decision more about maximizing profits than minimizing costs

86
New cards

Factor-Rating System

  • Most widely used

  • List of factors is developed

  • Range of possible points assigned to each factor

  • Each site is rated against each factor

  • The sums of assigned points for each site are computed

  • The site with the most points is selected


87
New cards

Transporation Method

Special linear programming method

Seeks to minimize costs of shipping n units to m destinations or it seeks to maximize profit of shipping n units to m destinations

88
New cards

Specialized equipment

“Special purpose” - may require a higher initial investment (high FC), but can perform more efficiently over the long run (lower VC)

89
New cards

General equipment

“General purpose” - often has a lower initial investment (lowered FC), but lacks the efficiency of a specialized machine (increased VC)

90
New cards

Demand break even point

Fixed Cost (FC) / (Price - Variable Cost) → how many units does it need to break even for demand

91
New cards

Revenue break even point

Fixed Cost / (1 - Variable Cost/Price)