Outdoor-gear co. competes on durability w/ lifetime warranty; premium prices. New plant manager (evaluated on cost/unit) switches to cheaper fabric & shortens quality testing. Unit costs -9%, warranty claims double, reviews mention early failures. What most directly explains the problem? A) Ops strategy emphasizes quality, business strategy emphasizes cost/lower prices B) Business strategy emphasizes quality/durability, ops strategy emphasizes cost reduction C) Corporate strategy emphasizes durability, ops emphasizes geographic expansion D) Marketing emphasizes warranties, finance emphasizes new segments E) Business strategy emphasizes cost, ops emphasizes supplier consolidation
B — Business strategy = quality/durability; operations strategy = cost reduction. (Topic 1: strategic alignment) Ops was rewarded on cost and cut quality. A is a reversal; C, D, E bring in things not in the scenario.
D — Revise metrics to reward on-time same-day fulfillment. (Topic 1: misaligned KPIs) People follow their metrics, so fix the metric. A & C make batching worse; B changes strategy to fit ops (backwards); E ignores batching.
A — Improvement created demand that linked activities (outbound logistics, service) couldn't support. (Topic 2: linkages) B is a local metric; C & D unsupported; E uses the absolute 'never.'
Three regional grocery chains buy the same inventory software and self-checkout from the same vendor. Costs fall at all three. Two years later none gained share and margins are nearly identical. Most accurate explanation?
A) Software failed—no chain hit max utilization
B) Should have bought more advanced tech than competitors
C) Adopting the same best practices improved operational effectiveness but didn't differentiate because competitors could copy it
D) Cost reduction never creates advantage
E) Support activities like tech development can't create advantage in retail
C — Operational effectiveness ≠ strategy; copyable best practices don't differentiate. (Topic 2) A is a utilization distractor; B 'more advanced tech' trap; D & E are absolutes.
E — Interdependent architecture until performance is good enough and interfaces are understood. (Topic 3: interdependence) Modularizing now is premature. A is the opposite; B, C, D confuse modularity with automation, integration, variety.
A — Simplify & standardize while keeping function. (Topic 4: DFM) B inspects instead of fixing design; C adds variety; D changes location not design; E adds more tooling.
D — A model is only as good as its data. (Topic 5: technology limitations) A buys tech for a data problem; B & C are absolutes; E is a utilization distractor.
B — Align decision rights: authority should sit with those who have the info and the accountability. (Topic 6: decision rights) A adds delay; C removes accountability; D is an org-chart fix; E ignores the approval delay.
C — Efficient long-lead-time chain doesn't fit volatile demand; go agile. (Topic 7/21: model fit) A & B double down on efficiency; D is the 'one precise forecast' trap; E treats the symptom.
E — Involve procurement early; use standard parts. (Topic 7: design for supply chain) A, B, D are reactive; C makes it worse.
A — Keep the core competency; outsource commodities. (Topic 8: core competency) B decides on cost alone; C is a reversal; D & E are extremes.
D — Supply-chain make / hybrid: take direct control of Tier 2 selection. (Topic 8/9) Tier 1 was opportunistic and automaker has better skills. A & B keep the flawed structure; C treats symptom; E is extreme.
Manufacturer qualifies an alternate supplier for a critical motor component. In a disruption both primary and alternate stop shipping—both depend on the same rare-earth magnet producer. Which practice would most directly have prevented this?
A) Choose alternate on lowest price
B) Qualify alternate on form, fit, function only
C) Map supply chains of both primary and alternate during design to confirm they don't share upstream suppliers
D) Increase utilization at primary
E) Add finished-goods warehouse capacity
C — Map upstream (Tier 2) dependencies during design. (Topic 9/20: design-phase resilience) Shared Tier 2 = not real diversification. A is price-only; B lacks the resilience check; D & E don't touch the shared dependency.
B — Map the end-to-end process; the time is in waiting at handoffs. (Topic 10: process analysis) A speeds already-fast steps; C & D add resources to non-problems; E is a utilization distractor.
E — Cells or product-oriented layout for high-volume families. (Topic 11: layout) A & D treat symptoms; B is wrong layout type; C adds capacity when the problem is movement.
D — Workflow bottleneck, not resource bottleneck. (Topic 12) Doubling headcount with no improvement proves it. A is the resource trap; B's idle crews are a symptom; C & E lack evidence.
A — Exploit before elevate: keep constraint running and don't waste it on bad dough. (Topic 13) B elevates too early; C improves a non-constraint; D floods the constraint; E treats symptom.
C — Subordinate (drum-buffer-rope): release at constraint's pace with a small buffer. (Topic 13) A & B release more work; D is the utilization trap; E is extreme.
B — Non-constraint utilization just builds WIP; it doesn't raise throughput. (Topic 14) A is an absolute; C unsupported; D is the 'inventory is an asset' trap; E blames an unmentioned forecast.
E — Forecasts need internal + external information, not history alone. (Topic 15: demand data sources) A still history-only; B wrong—forecast failed; C fixed-forecast trap; D shrinks demand to fit capacity.
D — Supply planning. (Topic 16) Forecast was accurate; the material plan ignored new lead times. A blames an accurate forecast; B, C, E unsupported.
B — S&OP: one integrated plan with aligned goals. (Topic 17) A & C let one function decide; D is a blunt cut; E 'every product' ties up cash.
A — Local incentive (unit cost) created carrying/obsolescence costs; measure total cost. (Topic 18: inventory root causes) B uses 'eliminated' (trap); C doesn't fix cause; D treats symptom; E confuses demand with procurement policy.
C — Lead strategy. (Topic 19) Predictable peak + expensive lost sales → build capacity ahead. A repeats the failure; B 'averages hide peaks' trap; D & E don't fit 6-week hiring time.
E — Hybrid: lean for stable demand, agile/postponement for volatile demand. (Topic 21) A adds cost to staples; B forecasts the unforecastable; C extreme; D reversal.
SA1. Boutique fitness chain promises personalized coaching & flexible class times. HQ requires a fixed standard schedule and raises class size 8 → 20 to cut costs. Cancellations rise. Diagnose & recommend (concept → diagnosis → recommendation → tradeoff).
CONCEPT: Misalignment between business strategy (personalization, flexibility) and operations strategy (standardization, efficiency). DIAGNOSIS: Fixed schedules and 20-person classes remove exactly what members pay for → cancellations. RECOMMENDATION: Restore flexible scheduling and smaller coaching ratios, or tie cost goals to retention, not cost alone. TRADEOFF: Higher labor cost per member vs. retention and ability to charge premium prices.
SA2. Car wash stages: prep 40/hr, wash 25/hr, dry 35/hr, detail 30/hr. Management adds a 2nd prep lane (prep → 60/hr). Throughput unchanged; line before wash grows. Identify constraint, explain failure, apply TOC steps.
CONSTRAINT: Wash (25/hr, lowest capacity). WHY IT FAILED: Added capacity at a non-constraint → only a longer queue before wash, no throughput gain. EXPLOIT: Remove wash downtime (off-peak maintenance, no idle gaps) and do prep checks so wash never processes a car twice. SUBORDINATE: Pace prep to the wash's rate. ELEVATE: Only if still needed, add a 2nd wash bay. REPEAT: Detail (30/hr) becomes the next constraint.
SA3. Company single-sourced a critical part from one low-cost overseas supplier and held almost no inventory (JIT). A port closure halted production for 6 weeks. Explain the tradeoff and recommend specific changes incl. costs.
CONCEPT: Efficiency vs. resilience — single sourcing + JIT minimized cost but left no slack (single point of failure). RECOMMENDATION: Targeted resilience for this critical part: qualify a 2nd supplier in a different region (verify no shared Tier 2 suppliers), hold strategic safety stock, consider long-term agreements. TRADEOFF/COSTS: Higher carrying costs, possibly higher unit prices, more supplier-management effort — vs. avoiding a 6-week shutdown. Apply only where risk is highest.
SA4. Fashion retailer deciding how much holiday inventory to buy. Explain 2 benefits and 3 costs of holding inventory, and recommend an approach.
BENEFITS: (1) Availability during peak demand — fewer stockouts/lost sales; (2) buffer against demand and supply uncertainty. COSTS (any 3): carrying costs; markdown risk after season; obsolescence of trend items; working capital tied up. RECOMMENDATION: Buy a moderate base quantity of core items; keep flexibility for trend items via smaller initial buys, reorder options or postponement; review demand signals during the season. TRADEOFF: Some stockout risk vs. large markdowns.