Executing Projects - Resources, Quality, and Procurement Vocabulary Flashcards

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/39

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering executing processes, team development, leadership styles, quality movement thinkers, quality control tools, Six Sigma, CMMI, and procurement contract types.

Last updated 12:23 AM on 10/5/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

40 Terms

1
New cards

Tuckman's Stages of Team Development

A framework created by Bruce Tuckman defining the five evolution stages of a team: Forming, Storming, Norming, Performing/High Performing, and Adjourning.

2
New cards
<p>Maslow's Hierarchy of Needs</p>

Maslow's Hierarchy of Needs

A motivation theory structured in five ascending levels of human needs: Physiological, Safety, Love/belonging, Esteem, and Self-actualization.

3
New cards

Herzberg's Two-Factor Theory

A motivation model distinguishing between Hygiene Factors (such as company policies, supervision, pay, and working conditions) that prevent dissatisfaction, and Motivational Factors (such as achievement, recognition, growth, and responsibility) that drive job satisfaction.

4
New cards

Theory X

Douglas McGregor's management perspective holding that employees inherently dislike work, avoid responsibility, desire only money, and must be closely supervised and forced to perform.

5
New cards

Theory Y

Douglas McGregor's management perspective holding that employees naturally want to work, desire independence, seek responsibility, and drive themselves when motivated by self-fulfillment.

6
New cards

Theory Z

A management theory introduced by William Ouchi in 1981 emphasizing democratic leadership and worker involvement as the key to increased productivity.

7
New cards

McClelland's Theory of Needs

A motivation model identifying three primary needs: Need for Achievement (drive to excel), Need for Power (desire to control others), and Need for Affiliation (desire for friendship and good relationships).

8
New cards

Vroom's Expectancy Theory

A motivation framework stating that motivation depends on three factors: Expectancy (effort leading to performance), Instrumentality (performance leading to rewards), and Valence (the value of those rewards).

9
New cards

Fiedler's Contingency Model

A leadership model asserting that group performance depends on matching a leader's style with situational favorableness.

10
New cards

Covey's 7 Habits

Stephen Covey's personal effectiveness model guiding individuals from Dependence to Independence (Private Victory: Habits 1–3) and Interdependence (Public Victory: Habits 4–6), surrounded by continuous renewal (Habit 7: Sharpen the Saw).

11
New cards

Myers-Briggs Type Indicator (MBTI)

A personality assessment tool measuring preferences across four dimensions: Extrovert/Introvert (E/I), Sensation/Intuition (S/N), Thinking/Feeling (T/F), and Judgment/Perception (J/P).

12
New cards

DiSC Profile

A personality assessment tool measuring four primary behavioral traits: Dominance (direct/results-oriented), Influence (outgoing/enthusiastic), Steadiness (even-tempered/patient), and Conscientiousness (analytical/systematic).

13
New cards
<p>Social Styles Model</p>

Social Styles Model

A behavioral communication tool dividing personality preferences into four distinct categories based on assertiveness and responsiveness: Driver, Expressive, Amiable, and Analytical.

14
New cards

Servant Leadership

A leadership approach that focuses on serving relationships and community first, viewing leadership as secondary.

15
New cards

Transformational Leadership

A leadership style focused on empowering team members and guiding organizational change through inspiration.

16
New cards

Transactional Leadership

A leadership style focused on achieving specific compliance or goals through rewards, punishments, and management by exception.

17
New cards

Quality (Project Management)

The degree to which a set of inherent characteristics of project deliverables satisfies requirements, demonstrates 'fitness for use,' and meets or exceeds customer objectives.

18
New cards

Grade vs. Quality

Grade refers to a category or rank assigned to products with the same functional use but different technical characteristics, whereas Quality refers to how well the product meets specified requirements and user expectations.

19
New cards

Product Quality vs. Process Quality

Product Quality focuses on the specific outputs delivered (e.g., an information system solution), while Process Quality focuses on the activities, methods, materials, and measurements used to create the product.

20
New cards

Eli Whitney

An industrial figure who invented the cotton gin and pioneered mass production and interchangeable parts manufacturing through his firearm manufactory in the late 18th and early 19th centuries.

21
New cards

Scientific Management

Fredrick W. Taylor's production approach that analyzed work processes into small steps using stopwatch time-and-motion studies to establish the most efficient method of completion.

22
New cards

Walter A. Shewhart

A pioneer at Western Electric Company who introduced statistical theory and control charts to evaluate and maintain production process quality.

23
New cards

W. Edwards Deming

A quality theorist who developed the 14 Points of Quality Management, emphasized process improvement over final inspection, and helped transform Japanese industrial quality after WWII.

24
New cards
<p>Joseph Juran</p>

Joseph Juran

A quality expert who defined quality as 'fitness for use,' established the Juran Trilogy (Planning, Control, Improvement), and emphasized the hidden costs of poor quality.

25
New cards

Hidden Factory

Joseph Juran's term describing the portion of production work, capacity, and cost wasted on scrap, rework, re-testing, and correcting customer complaints.

26
New cards

Kaoru Ishikawa

A Japanese quality pioneer who studied under Deming, advocated company-wide quality involvement, and introduced tools like the Fishbone Diagram, Pareto Diagram, and Flow Charts.

27
New cards
<p>Ishikawa Diagram</p>

Ishikawa Diagram

A Cause-and-Effect or Fishbone Diagram used to systematically categorize potential root causes of quality defects across domains such as People, Methods, Management, Technology, Measurements, and Environment.

28
New cards
<p>Pareto Principle</p>

Pareto Principle

A principle derived from Vilfredo Pareto and applied by J.M. Juran stating that approximately 80%80\% of problems stem from 20%20\% of causes ('the vital few and the useful many').

29
New cards

Philip Crosby

A quality management author who championed 'Do it right the first time,' 'Zero defects,' and 'Quality is free,' stressing that non-conformance is what costs organizations money.

30
New cards

ISO 9000

A set of international quality management standards created by the International Organization for Standardization (formed in 1947) to facilitate uniform global industrial quality.

31
New cards

Six Sigma

A statistical quality methodology pioneered by Motorola aiming for process perfection, defined as no more than 3.43.4 defects per million opportunities (6σ6\sigma).

32
New cards

DMAIC

The five-step problem-solving process used in Six Sigma: Define, Measure, Analyze, Improve, and Control.

33
New cards

Verification

Process-oriented quality activities designed to ensure that deliverables meet specified requirements prior to final testing ('Are we building the product the right way?').

34
New cards

Validation

Product-oriented quality activities, such as testing, designed to evaluate whether the final product fulfills customer expectations ('Did we build the right product?').

35
New cards
<p>Capability Maturity Model Integration (CMMI)</p>

Capability Maturity Model Integration (CMMI)

A process evaluation model developed by the Software Engineering Institute at Carnegie Mellon University assessing process capabilities across 5 maturity levels: Initial, Repeatable, Defined, Managed, and Optimizing.

36
New cards

Project Management Maturity Model (PMMM)

A maturity model developed by J. Kent Crawford that aligns organizational project management processes directly to the 5 levels of the CMM.

37
New cards

Fixed-Price Contract

A procurement agreement where a fixed lump-sum price is established for deliverables, shifting financial risk primarily onto the seller.

38
New cards

Cost-Reimbursable Contract

A procurement agreement where the buyer reimburses the seller for actual direct and indirect costs, plus an agreed-upon fee or incentive.

39
New cards

Time and Materials (T&M) Contract

A hybrid procurement contract where the buyer pays the seller for actual labor time spent and materials used, often combining cost-reimbursable open-endedness with preset unit rates.

40
New cards

Outsourcing vs. Procurement Management

A distinction where Outsourcing represents a long-term strategic decision to externalize business activities, whereas Procurement Management involves tactical actions to acquire products or services.