National Building Code of the Philippines (PD 1096) and Related Laws - Vocabulary

0.0(0)
Studied by 1 person
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/34

flashcard set

Earn XP

Description and Tags

Vocabulary practice flashcards covering legal definitions, technical parameters, and architectural regulations under the Revised Implementing Rules and Regulations of the National Building Code of the Philippines (PD 1096), RA 544, and RA 9266.

35 Terms

1
New cards

Addition

Any new construction which increases the height and/or floor area of existing buildings or structures.

2
New cards

Alteration

Works in buildings or structures involving changes in the materials used, partitioning, location/size of openings, structural parts, existing utilities, and equipment, but which do not increase the building height and/or floor area.

3
New cards

Building Permit

A document issued by the Building Official to an owner or applicant to proceed with the construction, installation, addition, alteration, renovation, conversion, repair, moving, demolition, or other work activity of a specific project, building, or structure after submitted plans, specifications, and applications conform with the National Building Code of the Philippines and its IRR.

4
New cards

Conversion

A change in the use or occupancy of buildings or structures or any portion thereof that has different requirements under the Code.

5
New cards

Demolition

The systematic dismantling or destruction of a building or structure, in whole or in part.

6
New cards

Moving

The transfer of buildings or structures or portion thereof from an original location or position to another, either within the same lot or to a different one.

7
New cards

Renovation

Any physical change made on buildings or structures to increase the value, quality, and/or to improve the aesthetics.

8
New cards

Repair

Remedial work done on any damaged or deteriorated portion of a building or structure to restore it to its original condition.

9
New cards

Traditional Indigenous Family Dwelling

A dwelling intended for the use and occupancy by the family of the owner only and constructed of native materials such as bamboo, nipa, logs, or lumber, the total cost of which does not exceed P 15,000.00P\,15,000.00.

10
New cards

Dangerous Buildings

Buildings or structures that are structurally unsafe, lack safe egress, constitute a fire hazard, or are otherwise dangerous to human life, safety, health, or public welfare by reason of inadequate maintenance, dilapidation, obsolescence, abandonment, or intolerable pollution.

11
New cards

Fire Zones

Areas within which only certain types of buildings or structures are permitted to be constructed based on their use or occupancy, type of construction, and resistance to fire.

12
New cards

Fire-Resistive Rating

The degree to which a material can withstand fire as determined by generally recognized and accepted testing methods.

13
New cards

Fire-Resistive Time Period Rating

The length of time a material can withstand being burned, which may be one-hour, two-hours, three-hours, four-hours, etc.

14
New cards

Building Height Limit (BHL)

The maximum height allowed for buildings or structures based on their proposed use or occupancy, measured from the established grade line to the topmost portion of the structure, excluding permitted roof projections like antennas and masts.

15
New cards

Gross Floor Area (GFA)

The total floor space within the perimeter of the permanent external building walls (inclusive of main and auxiliary buildings), excluding covered parking, driveways, utilities, vertical penetrations in parking floors, and certain uncovered areas like roof decks and pools.

16
New cards

Total Gross Floor Area (TGFA)

The total floor space within the main and auxiliary buildings consisting of the GFA and all other enclosed support areas together with all other usable horizontal surfaces above and below grade physically attached to the building.

17
New cards

Floor to Lot Area Ratio (FLAR)

The ratio between the Gross Floor Area (GFA) of a building or structure and the Total Lot Area (TLA) of the lot on which it stands, calculated by dividing GFA by TLA.

18
New cards

Allowable Maximum Building Footprint (AMBF)

The maximum portion of the lot that may be occupied by a building or structure at grade level after satisfying setback, yard, and court requirements, measured from the outermost face of exterior walls.

19
New cards

Allowable Maximum Volume of Building (AMVB)

The upper limit of the total volume of space (expressed in cubic meters) that can be occupied by a proposed building or structure above grade level, forming an imaginary footprint prism after deducting volume for natural light, ventilation, and incremental setbacks.

20
New cards

Yard

The required open space left between the outermost face of the building or structure and the property lines; its width defines the setback.

21
New cards

Court

An unoccupied space between the faces of the building lines and a yard or another court, free, open, and unobstructed from the ground upward.

22
New cards

Arcade

A roofed or covered sidewalk designed for pedestrian passage.

23
New cards

Canopy (Marquee)

A permanent roofed structure above a door attached to and supported by the building and projecting over a wall or sidewalk.

24
New cards

Awning

A movable shelter supported entirely from an exterior wall of a building and of a type which can be retracted, folded, or collapsed against the face of a supporting building.

25
New cards

Veneer

A nonstructural facing of brick, concrete, tile, metal, plastic, glass, or other similar approved materials attached to a backing or structural components of the building for ornamentation, protection, or enclosure.

26
New cards

Abutment

A form of a semi-permanent or permanent structure constructed along a property line, usually of masonry or reinforced concrete, where no openings are permitted except for a vent well with a clear width of 1.00 meter1.00\,\text{meter}.

27
New cards

Impervious Surface Area (ISA)

The percentage of the maximum allowable floor area of any paved, tiled, or hardscaped surface at grade level outside the main structure in relation to the Total Lot Area (TLA).

28
New cards

Unpaved Surface Area (USA)

The true open space portion of the lot that remains unpaved and reserved for exposed soil and planting/softscaping, expressed as a percentage of the Total Lot Area (TLA).

29
New cards

Total Open Space within Lot (TOSL)

The total open space required on a lot, consisting of the combined Impervious Surface Area (ISA) and Unpaved Surface Area (USA), expressed as a percentage of the Total Lot Area (TLA).

30
New cards

Road Right-of-Way (RROW)

A public open space for the continuous flow of pedestrian and vehicular traffic free of all prohibited physical obstructions, measured horizontally between opposite property lines.

31
New cards

Prefabricated Assembly

A structural unit whose integral parts have been built-up or assembled prior to incorporation into a building.

32
New cards

Approved Plastics

Plastic materials having a flame-spread rating of 225225 or less and a smoke density not greater than that obtained from the burning of untreated wood under similar test conditions.

33
New cards
<p>Clearance Diagram for Building (Figure XIII.1)</p>

Clearance Diagram for Building (Figure XIII.1)

A diagram illustrating the required minimum horizontal clearance (HH), minimum vertical clearance (VV), and transition clearance (V1=VV_1 = V) between a building exterior and passing or adjacent electrical lines.

34
New cards

Architect-of-Record

The architect registered and licensed under RA 9266 who is directly and professionally responsible for the total design of the project for the client, assuming civil liability for the plans, specifications, and contract documents signed and sealed.

35
New cards

Structural Conceptualization

The act of conceiving, choosing, and developing the type, disposition, arrangement, and proportioning of the structural elements of an architectural work, considering safety, cost-effectiveness, functionality, and aesthetics.