Week 2 Intro to Risk Management - Part 2
Week 2 Intro to Risk Management - Part 2
0.0
(0)
Rate it
Studied by 0 people
Call Kai
Learn
Practice Test
Spaced Repetition
Match
Flashcards
Knowt Play
Card Sorting
1/107
There's no tags or description
Looks like no tags are added yet.
108 Terms
View all (108)
Star these 108
1
New cards
Three control strategies
Prevent, detect, mitigate (they can be combined)
2
New cards
Control type of staff vetting (per slide)
Procedural, NOT Personnel
3
New cards
Control type of MFA (insider hacking example)
Technical
4
New cards
Control type of password strength rules
Technical and Procedural
5
New cards
Control type of auditing
Procedural
6
New cards
Can one control be two types at once?
Yes, e.g. password strength is technical and procedural
7
New cards
How too many power controls backfire
In a fire, firefighters wait for all power to be off, and batteries may not be stoppable
8
New cards
Lesson from the battery example
Controls can introduce new risks
9
New cards
Risk appetite
Quantity and nature of risk the organisation will accept, trading perfect security against unlimited accessibility
10
New cards
Risk tolerance (risk threshold)
Amount of risk accepted for a particular information asset
11
New cards
Residual risk
Risk that remains after current controls are applied
12
New cards
Appetite vs tolerance
Appetite = whole organisation; tolerance = one specific asset
13
New cards
CISO sets max acceptable risk for the payments database: appetite or tolerance?
Tolerance (specific asset)
14
New cards
Goal of information security
Bring residual risk into line with risk appetite (not zero risk)
15
New cards
SLE
Single Loss Expectancy = AV × EF (loss from one incident)
16
New cards
ALE
Annualised Loss Expectancy = SLE × ARO (expected loss per year)
17
New cards
CBA formula
ALE(prior) − ALE(post) − ACS
18
New cards
AV
Asset Value: development, acquisition, training, implementation, service, maintenance costs
19
New cards
EF
Exposure Factor: fraction of asset value lost in one incident
20
New cards
ARO
Annualised Rate of Occurrence: incidents per year
21
New cards
ACS
Annual Cost of Safeguard
22
New cards
What a negative CBA means
Control costs more than it saves: don't implement (tolerate or transfer)
23
New cards
ARO for once a week
52
24
New cards
ARO for once a month
12
25
New cards
ARO for twice a quarter
8
26
New cards
ARO for once a quarter
4
27
New cards
ARO for once every 5 years
0.2
28
New cards
ARO for once every 10 years
0.1
29
New cards
How to choose controls with a fixed budget
Maximise TOTAL CBA within budget, not the single biggest CBA
30
New cards
Common ALE distractor
The SLE offered as the ALE: do SLE first, then multiply by ARO
31
New cards
Three steps of risk assessment
Identification → analysis → evaluation
32
New cards
Is risk treatment part of risk assessment?
NO: assessment = identification, analysis, evaluation; treatment comes after
33
New cards
Doctor analogy for assessment vs treatment
Assessment = diagnosis; treatment = the cure
34
New cards
Risk identification
Finding, recognising and describing risks (trigger words: find, list, describe)
35
New cards
Risk analysis
Understanding the nature of the risk and determining its LEVEL (trigger: likelihood + impact)
36
New cards
Risk evaluation
COMPARING analysis results with risk CRITERIA and deciding controls
37
New cards
Risk treatment
Modifying risk (trigger words: reduce, control, modify)
38
New cards
Team compares calculated risk levels against criteria: which step?
Risk evaluation
39
New cards
Analyst combines likelihood and impact to get "High": which step?
Risk analysis
40
New cards
Workshop lists every way the portal could be compromised: which step?
Risk identification
41
New cards
Company installs MFA to reduce account takeover: which step?
Risk treatment
42
New cards
First stage of the risk management process
Context establishment
43
New cards
Risk process decision point 1
Assessment satisfactory? No → back to context; Yes → risk treatment
44
New cards
Risk process decision point 2
Risk accepted? No → iterate; Yes → document
45
New cards
Activities running alongside the whole risk process
Communication and consultation; monitoring and review
46
New cards
Risk management framework
The planning and design of the ENTIRETY of risk management efforts
47
New cards
Risk management process
Implementing risk management as the framework specifies
48
New cards
Centre of the risk management framework
Executive governance and support
49
New cards
Framework cycle
Design → implementation → monitoring and review → continuous improvement
50
New cards
STRIDE as a method
Structured, iterative threat modelling; output = system's vulnerabilities and how they could be exploited
51
New cards
Rule for STRIDE mitigations
Each mitigation protects the property that was violated
52
New cards
Spoofing mitigation
Strong authentication (MFA), strong frameworks and libraries (violates authentication)
53
New cards
Tampering mitigation
Encryption and hashing (violates integrity)
54
New cards
Repudiation mitigation
Logging and strong authentication (violates non-repudiation)
55
New cards
Information disclosure mitigation
Encryption and access control (violates confidentiality)
56
New cards
Denial of service mitigation
Site/product SCALABILITY (violates availability)
57
New cards
Elevation of privilege mitigation
Authorisation (violates authorisation)
58
New cards
Game servers crash under fake join requests: STRIDE mitigation?
Scalability
59
New cards
User edits config to grant themselves admin: STRIDE mitigation?
Authorisation
60
New cards
Asset-based identification
Starts from the Asset → threats → vulnerabilities; specific → general; OPERATIONAL scenarios
61
New cards
Event-based identification
Starts from the Enemy (risk source + objective); general → specific; STRATEGIC scenarios
62
New cards
"Start from HR database, list its threats": which method?
Asset-based
63
New cards
"Competitor wants a monopoly, plan back to attacks": which method?
Event-based
64
New cards
Event-based example: organised crime
Illegal activities → exploit port infrastructure → infiltrate dockers' union
65
New cards
Event-based example: aggressive business
Monopoly → influence regulator or remove competition → bribery, lobbying, defamation campaign
66
New cards
MCQ technique: option is a different type of thing
Eliminate it first (e.g. a scoring method offered for an identification question)
67
New cards
Two parts of business impact
Replacement value (cost to recover/replace) and business consequences (business/legal effects, opportunity cost)
68
New cards
Impact level 1
Minor: negligible
69
New cards
Impact level 2
Significant: but limited
70
New cards
Impact level 3
Serious: substantial
71
New cards
Impact level 4
Critical: disastrous
72
New cards
Impact level 5
Catastrophic: beyond the organisation
73
New cards
Likelihood
Numerical value on a defined scale of the probability a vulnerability is exploited
74
New cards
Risk event
A change in circumstance caused by a risk source
75
New cards
Likelihood of threat occurrence
Does the attack ARRIVE at all? (is the phishing email sent to us?)
76
New cards
Ease of exploit
How EASY is the vulnerability to use? (how easily do staff fall for it?)
77
New cards
Likelihood of incident scenario
Does it LEAD TO an actual incident? (does it cause stolen credentials?)
78
New cards
Trigger words for incident scenario
"Leads to" or "results in"
79
New cards
"Will ransomware gangs target us at all this year?" measures
Likelihood of threat occurrence
80
New cards
"How easily can attackers use public tools on our unpatched VPN?" measures
Ease of exploit
81
New cards
Phishing example: threat, vulnerability, source
Threat: phishing email; vulnerability: lack of SETA training; source: cyber-hacker
82
New cards
SETA
Security Education, Training and Awareness
83
New cards
Risk Method E.2
Likelihood of incident scenario (0–4) + business impact (0–4) = 0–8
84
New cards
Risk Method E.1
Threat occurrence (0–2) + ease of exploit (0–2) + asset value (0–4) = 0–8
85
New cards
Do E.1 and E.2 add or multiply?
ADD
86
New cards
E.1 with threat occurrence 2, ease 1, asset value 3
6 out of 8
87
New cards
Component-driven risk management (CyBOK)
Bottom-up: individual components and their threats/vulnerabilities
88
New cards
System-driven risk management (CyBOK)
Top-down: whole system, its goals and how parts interact
89
New cards
When component-driven fits
Simple systems with well-understood connections; single parts
90
New cards
When system-driven fits
Complex interactions, emergent breaches, NO single point of failure, requirements before design
91
New cards
Who cares about component vs system risk
Component: operational staff; system: senior managers
92
New cards
Game analogy: component vs system
One bugged script = component; dupe glitch from trading + DataStore lag + server hop = system
93
New cards
Stakeholders agree what a smart grid must never do before design: which approach?
System-driven
94
New cards
CyBOK four elements of risk
Vulnerability, threat, likelihood, impact
95
New cards
CyBOK definition of threat
An individual, event or action able to exploit a vulnerability
96
New cards
NIST SP800-30 cycle
Prepare, conduct, communicate, maintain
97
New cards
ISO/IEC 27005 phases
Context, assessment (identify, estimate, evaluate), treatment, acceptance, communication, monitoring
98
New cards
NIST vs ISO 27005
NIST puts threats before vulnerabilities and is prescriptive; ISO is less prescriptive
99
New cards
Method strengths: ISO 27005, NIST, FAIR
ISO socio-technical; NIST technology-driven; FAIR economic impact
100
New cards
Method strengths: STRIDE, attack trees, Octave Allegro
STRIDE threat-driven; attack trees attack-driven (root = attacker goal); Octave qualitative workshops