Vocabulary flashcards covering key definitions, production methods, cost formulas, quality management practices, and location decision factors from Unit 4 Operations Management.

24 Terms

1
New cards

Operations Management

The business function responsible for organizing resources to convert raw materials and inputs into finished goods or services efficiently.

2
New cards

Labor Productivity

A measure of workforce efficiency calculated using the formula: Labor Productivity=Total OutputTotal Number of Employees\text{Labor Productivity} = \frac{\text{Total Output}}{\text{Total Number of Employees}}.

3
New cards

Job Production

A production method where products are made individually to specific customer requirements, providing high quality and tailored design at a high cost per unit.

4
New cards

Batch Production

A production method where a quantity of identical items is made together in stages, offering flexibility and lower unit costs than job production, but requiring machine downtime between batches.

5
New cards

Flow Production

The continuous movement of standardized goods along an assembly line, achieving rapid high-volume output and the lowest unit cost through automation.

6
New cards

CAD (Computer Aided Design)

Software used to design products rapidly in 2D or 3D.

7
New cards

CAM (Computer Aided Manufacture)

Technology where computers control machines, robots, and manufacturing processes.

8
New cards

CIM (Computer Integrated Manufacture)

A manufacturing system that integrates CAD and CAM into total factory automation.

9
New cards

Fixed Costs (FC)

Costs that do not change with output in the short term, such as rent, insurance, and executive salaries.

10
New cards

Variable Costs (VC)

Costs that vary directly with the level of output, such as raw materials and direct wages.

11
New cards

Total Cost

The overall cost of production, calculated as Total Cost=Fixed Costs+Total Variable Costs\text{Total Cost} = \text{Fixed Costs} + \text{Total Variable Costs}.

12
New cards

Break-Even Point

The production volume where total revenue equals total cost, calculated as Break-Even Point=Fixed CostsSelling Price per Unit−Variable Cost per Unit\text{Break-Even Point} = \frac{\text{Fixed Costs}}{\text{Selling Price per Unit} - \text{Variable Cost per Unit}}.

13
New cards

Margin of Safety

The amount by which actual output exceeds the break-even level of output, calculated as Margin of Safety=Actual Output−Break-Even Output\text{Margin of Safety} = \text{Actual Output} - \text{Break-Even Output}.

14
New cards

Economies of Scale

Factors that lead to a reduction in average unit costs as a business grows larger, such as purchasing (bulk buying), managerial, financial, technical, and marketing efficiencies.

15
New cards

Diseconomies of Scale

Factors that cause average unit costs to rise as a business becomes too large, including poor communication, lack of commitment/motivation, and slow decision-making.

16
New cards

Quality

Producing a product or service that meets or exceeds customer expectations and requirements continuously.

17
New cards

Quality Control (QC)

A reactive quality management method involving inspecting finished products at the end of the production line to detect defects, which can lead to high waste.

18
New cards

Quality Assurance (QA)

A proactive quality management approach that sets quality standards at every stage of production to prevent defects before they occur, involving all staff.

19
New cards

Total Quality Management (TQM)

The continuous improvement of products, processes, and service quality through the active involvement of every employee in the firm.

20
New cards

Lean Production

An operational strategy focused on cutting out waste (time, materials, inventory, motion) at every stage to maximize operational efficiency and lower total costs.

21
New cards

Kaizen

A Japanese philosophy of continuous small improvements made by workforce teams.

22
New cards

Just-In-Time (JIT)

An inventory management system where materials arrive exactly when needed in production, reducing holding costs to zero.

23
New cards

Cell Production

A line production method where the process is divided into self-contained teams (cells) responsible for a complete unit of work.

24
New cards

Offshoring

Relocating production overseas to access lower labor costs and foreign markets, which carries risks of trade tariffs, currency fluctuations, cultural barriers, and long supply chains.