1/58
Looks like no tags are added yet.
Key objective for f/s audit
reliable financial reporting
reminder: internal control in cosos framework
provide reasonable assurance regarding effective and efficient operations, reliable financial reporting, and compliance with laws and regulations.
What is the internal control reporting objective for audits of issuers?
issue an opinion of effectiveness of ic over fr
How does the COSO Integrated Framework help auditors achieve that objective?
benchmark for evaluation
How is Internal Control over Financial Reporting (I/C over F/R) Defined?
a process designed to provide reasonable assurance regarding the reliability of financial reporting & preparation of F/S in accordance with GAAP
key features of ic over fr
Accurate Detailed Records Maintained
Transactions Authorized & Recorded
Unauthorized Use of Assets Detected
purposes of i/c
prevent and detect MM
Physical Security
Prevent assets from being misappropriated (stolen)
Reconciliation
Detect misstatements so they can be corrected (bank accounts)
physical security and reconciliation are examples of which type of activity
overall controls
TYPES OF I/C procedures
overall and it controls
Manual
performed by people to authorize, approve, and review
examples of IT controls
General and application
overall processing environment
Ensure system updates & maintain network security
Specific transaction input, processing & output:
Payroll System - Ensure only actual employees are paid.
overall processing environment and specific transaction input are examples of
types of i/c’s, it system
What are Limitations of Internal Control?
-People design, implement & execute I/C
-Cost-benefit constraints
-Risk of employee collusion
-Management override of I/C
What very important I/C is most affected by cost?
segregation of duties, ‘ARC’
Generally, what specific cause of MM is collusion related to?
MA
What specific cause of MM is mgt. override related to?
FFR
KEY LIMITATIONS of ic
Effective I/C may not prevent or detect/correct MM & I/C effectiveness may change over time.
An auditor would most likely be concerned with internal controls that provide reasonable assurance about the…
Entity’s ability to initiate, authorize, record, process, and report financial data.
Proper segregation of duties reduces the opportunities to allow persons to be in positions both to…
Perpetrate and conceal fraud and error
Engagement Planning & Internal Control: What are Key Steps in the Process?
1.. Obtain understanding of i/c system
2.. evaluate system design and implementation by the key tool: TRANSACTION WALKTHROUGH
3.. preliminary c/r assessment
What are other important benefits of transaction walkthroughs?
understand i/c’s, identify where ics are missing, and places in the system where ics not preventing or detecting and correcting MM
KEY TO RELIANCE of engagement planning and internal controls
Evidence of I/C Effectiveness
examples of obtaining understanding of i/c system
client manuals, narratives, flowcharts
Step 3: preliminary c/r assessment
Do I/Cs look like they could prevent or detect/correct MM? Can the auditor POTENTIALLY rely on I/C?
if Step 3: preliminary c/r assessment is NO…
c/r is at max, no reliance, and do not test
if Step 3: preliminary c/r assessment is yes…
perform a test of controls to obtain evidence of effectiveness and then assess c/r
step 3 Assessed C/R if I/C Ineffective?
high control risk
step 3 Assessed C/R if I/C Effective?
low control risk
Engagement planning steps: Do we always plan scope of substantive procedures
Yes we do, regardless of no or yes. this is key to the audit.
If assessed c/r is high (low d/r)
nature: highest quality
extent: larger sample size
timing: balance sheet date
If assessed c/r is low (high d/r)
nature: less persuasive option to obtain evidence
timing: interim and update on y/e
extent: smaller sample sizes
steps on planning and performing test of controls
1.. MM of concern for an account/assertion
2.. i/c in place to prevent/detect MM?
3. Choose audit procedures and test i/c
4.. results= assess c/r
Which of the following does not describe a test of controls?
Comparing recorded sales to industry benchmarks and historical sales patterns.
Which of the following is true regarding the scope of an auditor’s substantive tests when the level of control risk has been assessed as high?
Increase Perform tests and sample size at an interim date
yes, no
Audit of I/C over F/R Required for Public Companies objective:
express an opinion on effectiveness of i/c over f/r
main question for i/c over f/r
are there material weaknesses in i/c over f/r?
MATERIAL WEAKNESSES
Reasonable possibility that MM in F/S NOT prevented or detected & corrected
What are key indicators of Material Weaknesses?
1.. restatement of f/s
2.. detect of MM
3.. ineffective audit committee
audit of i/c over f/r entry level controls
Control Environment
Controls Over Management Override
Period-end F/R Process
audit of i/c over f/r
Controls over account balances & transactions;
Factors affecting risk of material weakness are
Transaction volume & complexity changes from prior period
what must the auditor consider?
the likelihood I/C will fail & magnitude of potential misstatement.
what are the 3 TYPES OF DEFICIENCIES IN I/C OVER F/R
deficiency, significant deficiency, material weakness
DEFICIENCY
I/C design/operation NOT prevent or detect & correct MM.
SIGNIFICANT DEFICIENCY
Deficiency in I/C important enough to report to Audit Committee.
MATERIAL WEAKNESS
Deficiency in I/C & REASONABLE POSSIBILITY OF MM in F/S.
Compensating i/c
another control that addresses the same risk of MM precisely enough to make up for a missing or failing i/c
if compensating i/c is working
significant deficiency and unqualified opinion
if compensating i/c is NOT working
material weakness and adverse opinion
does material weakness mean that f/s are MM?
NO, does not mean that f/s are MM. it just means there is a possibility that there could be a MM in the f/s, not that there was one
UNQUALIFIED
no material weakness
adverse
material weakness
what level of assurance is expressed?
reasonable assurance
AUDIT REPORT ON I/C OVER F/R INCLUDES:
Definition and limitations of I/C over F/R. Some limitations are:
May not prevent or detect/correct MM.
Effectiveness may change over time.
WHAT IS THE FRAMEWORK FOR AUDITING I/C OVER F/R?
Coso’s framework
Which of the following is an accurate statement about internal control weaknesses?
Material weaknesses are also control deficiencies