1/43
Comprehensive vocabulary flashcards detailing concepts, equipment, rod types, signals, and testing procedures for measuring vertical distances.
Levelling
The process of directly or indirectly measuring vertical distances to determine the elevation of points or differences in elevation.
Level Surface
A curved surface which is, at any point, perpendicular to the direction of gravity or the plumb line.
Horizontal Line
A straight line in a horizontal plane which is tangent to a level line at one point.
Vertical Line
A line parallel to the direction of gravity.
Mean Sea Level
An imaginary surface of the sea which is midway between high and low tides.
Vertical Datum
Any convenient level surface coincident or parallel with mean sea level, to which elevations of a particular area are referred.
Elevation
The vertical distance above or below sea level or any other selected datum.
Difference in Elevation
The vertical distance between the two level surfaces in which two points lie.
Direct or Spirit Leveling
The most commonly employed leveling method that determines elevations of points some distance apart through a series of setups of a leveling instrument along a route using a spirit level.
Reciprocal Leveling
The process of accurately determining the difference in elevation between two intervisible points located at a considerable distance apart.
Profile Leveling
A method used to determine elevation differences between points at designated short measured intervals along an established line to plot a vertical section of the ground surface.
Trigonometric Leveling
A method used to determine elevation differences between two points by trigonometric computations from measured horizontal or slope distances and vertical angles.
Stadia Leveling
A leveling method combining direct and trigonometric leveling, where elevation differences are computed from observed vertical angles and three rod intercepts.
Barometric Leveling
The determination of elevation differences between points by measuring variations in atmospheric pressure using a barometer.
Cross-Section Leveling
A leveling procedure used to obtain a representation of the ground surface on either side of an established centerline.
Borrow-pit Leveling
A method of determining relative elevations of points in borrow-pit excavations for the purpose of calculating earthwork volumes.
Dumpy Level
A leveling instrument featuring a long telescope rigidly attached to the level bar (capable of 360∘ rotation) and a level vial that permanently stays in the same vertical plane as the telescope.
Wye Level
A level instrument featuring a detachable telescope that rests in Y-shaped supports termed wyes and is secured in place by curved clips.
Builder’s Level
Also called a construction level or architect’s level, an instrument featuring a horizontal circle to measure horizontal angles, used primarily in building construction where extreme precision is not required.
Automatic Level
A level instrument that dispenses with a level vial and self-levels using a prismatic compensator suspended on fine, non-magnetic wires.
Tilting Level
A level whose telescope can be tilted or rotated about its horizontal axis via a tilting knob, employed for precise leveling operations and construction layout.
Geodetic Level
A high-precision instrument used in first-order leveling whose metal parts are primarily made of Invar to minimize temperature effects, equipped with stadia hairs for three-wire leveling.
Hand Level
A handheld instrument consisting of a brass tube roughly 15cm long with a plain glass objective and a peep-sight eyepiece, used for short-sight reconnaissance leveling.
Self-Reading Rod
A leveling rod that is read directly by the instrument man through the telescope by observing the apparent intersection of the horizontal hair on the rod face.
Target Rod
A leveling rod equipped with a movable sliding target that is positioned and read directly by the rodman upon signals from the instrument man.
Philadelphia Rod
A combination self-reading and target rod constructed in two sliding sections where the rear section slides over the front section.
Chicago Rod
A leveling rod built in three sliding sections that extends to 3 or 4m, characterized by wider face figures suited for longer sight distances.
Rod Ribbons
An improvised rod type consisting of graduated canvas or metal strips stapled to lumber, which can be detached, rolled, and stored in a pocket.
Precise Rod
A leveling rod ribbon type that incorporates a graduated Invar strip permanently attached to a 4-meter wooden or metal frame.
Geodetic Rod
A rod ribbon variant that utilizes a graduated Nilvar metal strip with upside-down graduations designed for use with inverting telescopes.
Tape Rod
Also called an automatic rod, a frame carrying a looped 3-meter graduated metal tape on end rollers, used to determine numerous elevations from one setup.
Rod Level
An L-shaped accessory equipped with a circular spirit level held against or attached to a leveling rod to ensure it is plumbed vertically.
Objective Lens
A compound lens made of crown and flint glass mounted at the far end of the telescope that admits light and forms an image of the object sighted.
Eyepiece
A microscope lens system containing 2 or 4 lenses that magnifies the reticle crosshairs and the object image.
Cross Hairs
A pair of intersecting perpendicular lines mounted on a reticle inside the telescope that define the instrument's line of sight.
Magnification
The ratio of the apparent size of an object viewed through a telescope to its size as seen by the unaided eye from the same distance, expressed in diameters.
Level Vial
A sealed, graduated glass tube containing a liquid and an air bubble used to establish a horizontal reference line.
Coincidence Bubble
An optical bubble viewing system that longitudinally splits the bubble image and optically juxtaposes both ends to confirm perfect centering.
Shoe
A pointed metal piece attached to the foot of each tripod leg that is driven into the ground by foot pressure to provide stability.
"All Right" Signal
An arm signal given by waving both arms up and down while extended horizontally from the shoulders to indicate correct alignment or completion of an activity.
"Plumb the Rod" Signal
A hand signal given by extending the appropriate arm upward and moving the hand toward the side in which the top of the rod must be adjusted to make it vertical.
"Wave the Rod" Signal
A signal given by waving one raised arm slowly side-to-side, prompting the rodman to sway the rod forward and backward to identify the minimum rod reading.
"Raise for Red" Signal
A signal used by the instrument man to direct the rodman to raise the rod slightly to reveal the adjacent whole-foot mark when obscured from view.
Two-Peg Test
A calibration procedure using two fixed pegs and varying instrument setups to determine whether a dumpy level's line of collimation is truly horizontal.