International Logistics EXAM 2 - Frank Adams

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/52

encourage image

There's no tags or description

Looks like no tags are added yet.

53 Terms

1
New cards

Changeover Time

Time required to switch a machine or process from producing one product to another.

Importance: Reducing changeover time increases flexibility, reduces downtime, and minimizes inventory.

2
New cards

Kanban

A scheduling system originating from Toyota's lean manufacturing process that uses visual signals (like cards, bins, or digital boards) to control the flow of materials and work through production or a supply chain.

3
New cards

Purpose of Kanban

- Implement a Pull System: Ensures production aligns with actual customer demand rather than speculative forecasts.

- Prevents overproduction, minimizes waste, and balances workload.

4
New cards

Key Features of Kanban

- Visual Signals: Cards, boards, or bins signal what, when, and how much to produce or move.

- Limits on WIP (Work in Progress): Controls the amount of work allowed at any stage to prevent bottlenecks.

- Continuous Improvement: Kanban boards help teams visualize inefficiencies and make process adjustments.

5
New cards

How Kanban works

- Consumption: When materials or parts are consumed, a Kanban card is sent as a signal to replenish.

- Replenishment or Production: The card triggers production or movement of the specified quantity.

- Delivery: The replenished items are delivered just in time to prevent delays or overstocking.

6
New cards

Benefits of Kanban

- Reduced Inventory: Produces only what is needed when it is needed.

- Improved Communication: Clear visual signals reduce misunderstandings and delays.

- Enhanced Flexibility: Adjusts quickly to changes in demand or process flow.

- Increased Productivity: Minimizes overproduction and downtime.

7
New cards

Kaizen

continuous improvement involving all employees.

- Focus on small, incremental changes.

- Encourage teamwork and innovation.

- Example: Daily team meetings to identify areas for process improvement.

8
New cards

Lean

Focuses on delivering maximum value with minimal resources.

9
New cards

Waste

Any activity that doesn't add value (e.g., overproduction, waiting).

10
New cards

Muda

Waste (e.g., defects, overproduction).

11
New cards

Mura

Unevenness in production causing inefficiencies.

12
New cards

Muri

Overburdening resources or people, leading to inefficiency, errors, or breakdowns.

13
New cards

Poka-yoke

Definition: Error-proofing techniques to prevent mistakes.

Example: USB connectors designed to fit only one way.

14
New cards

Takt Time

The rate at which products must be produced to meet customer demand.

Example: If 8 hours are available and 120 units are needed, Takt Time = 4 minutes/unit.

<p>The rate at which products must be produced to meet customer demand.</p><p>Example: If 8 hours are available and 120 units are needed, Takt Time = 4 minutes/unit.</p>
15
New cards

Control Chart Rules

Definition: Graphical tools to monitor process stability.

Rules: Points outside control limits.

Trends or patterns indicating non-random variation.

16
New cards

ISO (International Standards Organization)

- Ensures standardized quality management (e.g., ISO 9001).

- Improves consistency, customer satisfaction, and compliance.

17
New cards

Six-Sigma

A methodology to reduce defects and variability in processes.

Goal: Achieve fewer than 3.4 defects per million opportunities.

Tools: DMAIC (Define, Measure, Analyze, Improve, Control).

18
New cards

Center of Gravity Models

Definition: Mathematical approach to find the optimal location to minimize transportation costs.

Application: Facility placement for warehouses or distribution centers.

19
New cards

Coordination

Definition: Align geographically dispersed operations for seamless performance.

Example: Boeing sharing R&D insights across global teams.

20
New cards

Configuration

Definition: Deciding where to locate activities in the supply chain.

Factors: Resource access, scale economies, and proximity to markets.

21
New cards

Market Chasers

Locate facilities near customer populations to improve delivery speed and customer service.

22
New cards

Resource Chasers

Locate facilities near raw material sources or other critical resources to lower costs.

23
New cards

Demand Patterns Types

Trend, seasonal, cyclical, and random patterns.

24
New cards

Forecast Horizon

The time frame a forecast covers (short-term, medium-term, long-term).

25
New cards

Forecast Types

Qualitative: Expert judgment (e.g., Delphi method).

Quantitative: Data-driven techniques (e.g., moving averages, regression).

26
New cards

Procurement

Strategic acquisition of goods/services.

27
New cards

Purchasing

Transactional buying process.

28
New cards

Sourcing

Selecting and evaluating suppliers.

29
New cards

Strategic Sourcing Matrix - Categorizes purchases - Routine

Low value, low complexity.

30
New cards

Strategic Sourcing Matrix - Categorizes purchases - Leverage

High value, low complexity.

31
New cards

Strategic Sourcing Matrix - Categorizes purchases - Bottleneck

Low value, high complexity.

32
New cards

Strategic Sourcing Matrix - Categorizes purchases - Critical

High value, high complexity.

33
New cards

Aggregate Planning

Balances production, inventory, and workforce to meet demand.

34
New cards

Common Mistakes in ERP Implementation

Lack of user training, poor planning, and failure to redesign business processes.

35
New cards

Level and Chase Strategies

Level: Steady production, use inventory to meet peaks.

Chase: Adjust production to match demand fluctuations.

36
New cards

Integrated Planning

Synchronizes planning across functions like production and inventory.

37
New cards

EOQ (Economic Order Quantity)

Optimal order size minimizing total inventory costs.

<p>Optimal order size minimizing total inventory costs.</p>
38
New cards

Pareto Principle

80% of inventory value comes from 20% of items.

39
New cards

Backwards Scheduling

Start with the due date and work backward to plan tasks.

40
New cards

Bill of Materials (BOM)

Detailed list of materials and components required for production.

41
New cards

Dependent vs. Independent Demand

Dependent: Driven by production of another item (e.g., car parts).

Independent: Customer-driven demand for finished goods.

42
New cards

Fixed Order Quantity

A fixed amount ordered each time inventory is replenished.

43
New cards

Inventory Records

Tracks levels, orders, and usage of inventory.

44
New cards

Lot-for-Lot

Orders only the exact quantity needed.

45
New cards

Master Production Schedule (MPS)

Specifies what products to produce and when.

46
New cards

Periodic Order Quantity

Orders placed at set intervals, with varying quantities.

47
New cards

Cow to Customer

Highlights the disrupted beef supply chain during COVID-19, from ranchers to restaurants, showcasing vulnerabilities and adaptations.

48
New cards

The Quality Dimensions of Service - Tangibles

Physical appearance of facilities.

49
New cards

The Quality Dimensions of Service - Reliability

Consistency in service performance.

50
New cards

The Quality Dimensions of Service - Responsiveness

Willingness to help customers.

51
New cards

The Quality Dimensions of Service - Assurance

Knowledge and courtesy of employees.

52
New cards

The Quality Dimensions of Service - Empathy

Personalized care.

53
New cards

The Square Root Rule

Increasing the number of locations increases safety stock, but at a rate proportional to the square root of the number of locations.