ch 16 ais the production cycle

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/23

encourage image

There's no tags or description

Looks like no tags are added yet.

24 Terms

1
New cards

production cycle activities

  • product design

  • planning and scheduling

  • production operations

  • cost accounting


2
New cards

inaccurate or invalid master data

  • Human error during data entry,

    inconsistencies across departments,

    software malfunctions, unauthorized

    changes, or ineffective data migration

    and integration practices

  • impacts

  • If data about factory operations are incorrect,

    products may be costed incorrectly, and inventory

    may be misvalued

    • Errors in inventory records may result in failure to

    timely manufacture finished goods (understock) or

    unnecessary production (overstock)

    • Errors in product specifications (bills of materials

    and operations lists) can result in poorly designed

    products.

  • general threat to production cycle


3
New cards

unauthorized disclosure of sensitive information

  • Cyber-attacks like hacking, insider

    misuse of access privileges, device

    theft, or insufficient data security

    measures

  • impacts

    • Leak of trade secrets and process

      improvements that provide a

      competitive advantage

  • general threat to production cycle


4
New cards

loss or destruction of data

  • Hardware failure, software issues,

    human error, or cyber-attacks

  • Only interrupt the functioning of

    information systems, but also disrupt

    manufacturing activities


5
New cards

controls for inaccurate or invalid master data

  • Data validation and verification with

    processing integrity controls

    • Restriction of access to master data

    • Maintain and review logs of changes

    to master data

  • ex.,

  • the system may reject any attempts to

    alter inventory records from a

    terminal located in the engineering

    department

    • Role-based access controls (RBAC)

    that limit user access based on job

    function, coupled with strong

    authentication mechanisms.


6
New cards

unauthorized disclosure of sensitive information controls

  • Access Controls

• Encryption

• Tokenization (Masking)

• Employee Training and Awareness Programs

• Data Governance Policies

ex.,

  • precise procedures for manufacturing

    a particular product, should be

    encrypted both while in storage and

    during transmission to manufacturing

    plants and business partners


7
New cards

loss or destruction of data

  • Regular Backups

    • Disaster Recovery Plan

    • Access Controls

  • ex.,

  • Additional copies of critical master

    files, such as open production orders

    and raw materials inventory, should

    be stored off-site


8
New cards

product design

  • determine what to manufacture and what materials, labor, and processes are required

  • main objective is to create a product that satisfies customer demands regarding quality, durability, and functionality, while also minimizing production costs

    • bill of materials

    • operations list


9
New cards

poor product design resulting in excess costs

  • threats and controls to product design

  • analysis of costs arising from product design choices

  • analysis of warranty and repair costs

  • ex.,

  • Using too many unique components

    when producing similar products

    results in higher costs for purchasing

    and maintaining raw materials

    inventories

    • Leverage data from the revenue cycle

    to identify the primary causes of

    product failure and suggest

    opportunities for product redesign to

    improve quality and lower warranty

    costs


10
New cards

bill of materials

  • outlines the part number description, and qty of each component required to produce a finished product


<ul><li><p>outlines the part number description, and qty of each component required to produce a finished product</p></li></ul><p></p>
11
New cards

operations list

  • Details the step-by-

    step sequence to be

    followed in the

    manufacturing

    process, the necessary

    equipment, and the

    time required for each

    step


<ul><li><p>Details the step-by-</p><p>step sequence to be</p><p>followed in the</p><p>manufacturing</p><p>process, the necessary</p><p>equipment, and the</p><p>time required for each</p><p>step</p></li></ul><p></p>
12
New cards

planning and scheduling

  • Determine how much to produce, when to

produce it, and what resources are needed

• Main objective is to develop an efficient

production plan to meet existing orders and

anticipated short-term demand while minimizing

inventories of both raw materials and finished

goods

  • docs: master production schedule, production order, materials requisition, move tickets


13
New cards

over and underproduction

  • threats and controls to planning and scheduling

  • Production planning systems

    • Review and approval of

    production schedules and

    orders

    • Restriction of access to

    production orders and

    production schedules


14
New cards

master production schedule

  • The production planning

    department utilizes

    information about sales

    forecasts and customer

    orders, along with data

    on current inventory

    levels, to create the

    Master Production

    Schedule (MPS) and

    authorize the production

    of specific goods

  • documents in planning and scheduling


<ul><li><p>The production planning</p><p>department utilizes</p><p>information about sales</p><p>forecasts and customer</p><p>orders, along with data</p><p>on current inventory</p><p>levels, to create the</p><p>Master Production</p><p>Schedule (MPS) and</p><p>authorize the production</p><p>of specific goods</p></li><li><p>documents in planning and scheduling</p></li></ul><p></p>
15
New cards

exploding the bill of materials

  • to determine the

    immediate raw materials

    requirements to meet the

    production goals listed in

    the MPS

    • This helps determine raw

    materials purchases need,

    and Purchase Requisitions

    (Ch. 15) are thus forwarded

    to the purchasing

    department


<ul><li><p>to determine the</p><p>immediate raw materials</p><p>requirements to meet the</p><p>production goals listed in</p><p>the MPS</p><p>• This helps determine raw</p><p>materials purchases need,</p><p>and Purchase Requisitions</p><p>(Ch. 15) are thus forwarded</p><p>to the purchasing</p><p>department</p></li></ul><p></p>
16
New cards

production order

  • Authorizes the manufacture of a

    specific quantity of a particular

    product.

    • It lists the required operations,

    production quantities, and the

    delivery location for the finished

    product.

    • It collects data on each of these

    activities

  • docs in planning and scheduling


<ul><li><p>Authorizes the manufacture of a</p><p>specific quantity of a particular</p><p>product.</p><p>• It lists the required operations,</p><p>production quantities, and the</p><p>delivery location for the finished</p><p>product.</p><p>• It collects data on each of these</p><p>activities</p></li><li><p>docs in planning and scheduling</p></li></ul><p></p>
17
New cards

materials requisition

  • authorizes the removal of

    the necessary quantity of

    raw materials from the

    storeroom to the factory

    location where they will

    be used.

    • Contains the production

    order number, date of

    issue, and, based on the

    Bill of Materials, the part

    numbers and quantities of

    all necessary raw materials

  • requesting of materials → factory (vs purchase requisition is asking that they buy the materials)


<ul><li><p>authorizes the removal of</p><p>the necessary quantity of</p><p>raw materials from the</p><p>storeroom to the factory</p><p>location where they will</p><p>be used.</p><p>• Contains the production</p><p>order number, date of</p><p>issue, and, based on the</p><p>Bill of Materials, the part</p><p>numbers and quantities of</p><p>all necessary raw materials</p></li><li><p>requesting of materials → factory (vs purchase requisition is asking that they buy the materials)</p></li></ul><p></p>
18
New cards

move ticket

  • Transfers of raw

    materials

    throughout the

    factory are

    documented on

    move tickets, which

    identify the parts

    being transferred,

    the destination

    location, and the

    time of transfer


<ul><li><p>Transfers of raw</p><p>materials</p><p>throughout the</p><p>factory are</p><p>documented on</p><p>move tickets, which</p><p>identify the parts</p><p>being transferred,</p><p>the destination</p><p>location, and the</p><p>time of transfer</p></li></ul><p></p>
19
New cards

production cycle info integration

  • Accurate production planning

    requires integrating information

    about customer orders (from the

    Revenue cycle) with information

    about purchases from suppliers

    (from the Expenditure cycle),

    along with information about

    labor availability (from the

    HR/payroll cycle).


<ul><li><p>Accurate production planning</p><p>requires integrating information</p><p>about customer orders (from the</p><p>Revenue cycle) with information</p><p>about purchases from suppliers</p><p>(from the Expenditure cycle),</p><p>along with information about</p><p>labor availability (from the</p><p>HR/payroll cycle).</p></li></ul><p></p>
20
New cards

production operations

  • issue materials, use labor and equipment, and manufacture FG


21
New cards
22
New cards
23
New cards
24
New cards