Aggregate Production Plan (APP)
managerial statement of time phased:
- production rates
- work force levels
- inventory investment
taking into account customer requirements and capacity limitations
Nature of APP
- Mid Range
- medium term time horizon
- Driven by the forecast
- rolling horizon
Aggregate
converting everything to "person hours"
- classes of products/labor/other inputs
- geographic location of production
- often fictitious
fictitious
highly abstract
Nature of Aggregation
depends on nature of your problem
- nature of product
- nature of raw material used
- nature of other resource/input
nature of business determines
length of horizons and size of buckets
APP Time Horizon
medium time horizon, divided into time buckets that vary depending on the nature of your business
(12 months, 1 month buckets)
short horizon & short time buckets
industry with rapid new product development and high variability
long horizon & long time buckets
industry with long lead times and stable products
Rolling Horizon Basis
do not wait for an entire plan to be executed to develop a new one
**as first bucket is completed, a meeting is held to evaluated remaining months and tack a new month onto the end of the project
3 stages of Disaggregation
master production schedule
material requirements planning
shop floor scheduling
Master Production Schedule (MPS)
first level of disaggregation of the aggregate plan. break down groups of products into more real end product items
formulated and evaluated at lower organizational level than APP
*due to greater specificity and more frequent revision
"when"
MPS Horizon
shorter time horizon with finer time buckets
rolling horizon (3-6 months, 1 week buckets)
*NEVER longer than aggregate plan
Material Requirements Planning (MRP)
second level of disaggregation
extreme detail, down to every nut and bolt
"what/stuff"
Shop Floor Scheduling
last stages of disaggregation/specificity with very precise detail and no "aggregated" products
actual production plan
"who/when"
Types of Strategic Plans
represent extremes on a continuum, where companies implement plans that fall in the middle - usually leaning more toward one extreme than the others
- chase strategy
- level strategy
- stable workforce plan
chase strategy
production and manpower to fluctuate to perfectly match demand by *firing/hiring* (maintain no inventory)
amount produced = minimum amount required to satisfy demand for that period
when to use chase strategy
when you have temporary workers who are paid on a lower scale
when NOT to use chase strategy
when you have highly skilled workers or workers that need a lot of training
advantages of chase strategy
minimizes inventory and excess capacity (therefore no back order)
disadvantages of chase strategy
costs from hiring and firing
level strategy
constant production/workforce level with fluctuating inventory
with/without backorder
high inventory holding costs
*most expensive
when to use level strategy
when inventory storage is inexpensive and easily achieved
when raw material deliveries must be determined well in advance of delivery
when production requires highly trained labor
when NOT to use level strategy
when inventory storage is expensive and difficult to achieve
when raw material deliveries don't have to be determine well in advance of delivery
level with backorder
when a negative value appears on the ending inventory line (because demand has exceeded our set production level at that point)
level without backorder
plan with minimum level of inventory. one of the ending inventories equals zero
advantages of level strategy
simple and consistent
disadvantages of level strategy
inconsistency of demand means there will be excess production and back orders
stable workforce strategy
constant workforce size with variable working hours, with intent of keeping inventory as low as possible
keeping inventory as low as possible
overtime
*least expensive
when to use stable workforce strategy
when hiring and firing costs are too expensive and inventory storage is expensive
stable workforce advantages
no hiring/firing costs
stable workforce disadvantages
when demand decreases, hours decrease
- you pay for work you aren't receiving
Transformation Stage Inventory
raw material
work in process
finished good
goal of inventory management
identify an inventory policy that is the most cost effective
raw material
inventory which has not undergone any transformation by the company
*can be highly processed parts as long as all processing was performed outside of operational unit in question
work in process (WIP)
inventory that has undergone transformation but is not yet completed
finished good
inventory which has undergone all transformations and is ready to be passed onto the customer
Holding Inventory
safety stock
cycle stock
pipeline stock
seasonal stock
safety stock
inventory being held to buffer against some form of uncertainty (usually amount of demand or supply)
cycle stock
inventory being held because supply/source of product is not continuous
reasons for cycle stock
- process requires batching
- required resources shared w/ more than one product
- not economically efficient to produce continuously
pipeline stock
inventory that is located somewhere int he production or delivery process
seasonal stock
inventory that is held to buffer against seasonality in demand
measures of inventory
- number of units
- dollar value of units
- weeks of supply
- inventory turns
number of units
an absolute measure/physical count
something that should always be known
not useful from an evaluative standpoint
dollar value of units
a cost measure
choice of value (cost or sales) depends on the context in which the measure is to be used
weeks of supply
a relative volume measure
number of units of inventory divided by weekly demand rate
inventory equivalent of ROI
inventory turns
a relative measure
annual sales volume divided by number of units in inventory
inverse of "years of supply" measure
Why is inventory important?
- material availability (assuring customer orders are met)
- COSTS MONEY
- must meet customer demand while minimizing costs
- fixed order quantity models
FOQ (fixed order quantity) Assumptions
- demand constant
- item produced/purchased in lots
- independence
- no uncertainty in demand/supply
- replenishment is instantaneous
- holding, setup, purchasing are only relevant costs
independence
no relationship between supply and demand or # of items and per unit price
instantaneous replenishment
100% fulfillment at one time, get everything at once
Total Annual Holding Cost (TAHC)
cost of insurance, capital, warehousing, shrinkage, etc
increases when inventory increases
TAHC equation
(avg inventory level) (per unit annual cost)
holding
= carrying
Total Annual Setup Cost (TASC)
= ordering
administrative charges, delivery charges, labor costs, defects, testing, etc
TASC equation
(# of setups per year) (cost of a setup)
setup
= ordering
Total Annual Purchasing Cost (TAPC)
actual cost/vale of a years demand
TAPC equation
(cost of item) (annual demand for item)
basic FOQ model
demand is constant and order quantity arrives all at once
monitor inventory constantly and reorder a fixed quantity when the inventory level falls to a previously determined reorder point
lead time not necessarily zero (RP = demand during lead time)
how big should Q be?
the value that minimizes costs
what costs should we attempt to minimize?
all of them
economic Q
total cost minimized
economic order quantity (optimal Q)
- one of the most famous formulas in business history
- developed on annual basis & can work on any time basis
- units must be consistent
(D and i same time frame)
(D and C same size product)
- RP = DLT
- TAHC = TASC at optimal Q
FOQ with usage
when item is being produced in house or manufactured, the order arrives gradually over time
no instantaneous replenishment
lower costs
larger order quantity (Q)
FOQ with uncertain demand
no assumption of certain demand
normally distributed demand
instantaneous replenishment
service level = % change no stockout during a given inventory cycle
Q
amount to order
D
demand rate
S
cost per setup or order
H
cost to hold a single unit in inventory for a fixed period of time
C
cost of the item
i
per unit holding cost
expressed as percentage of cost of item
P
production/delivery rate of an item
where quality comes from
process
if you want to change an outcome, change the process
two great enemies
waste (MUDA)
variability (SPC, TQM, Six Sigma)
types of waste
overproduction
defects
movement
under-utilizing human resources
total quality management (TQM)
managing the entire organization so that it excels on all dimensions of products and services that are important to the customer
lean six sigma
dimensions of quality
performance
features
reliability
durability
conformance
serviceability
aesthetics
perceived quality
performance
the product's primary operating characteristics
features
supplements to a product's basic function
bells and whistles
reliability
time until a product malfunctions and needs repair
durability
time until a product needs replacement
conformance
degree to which a product conforms to established standards
serviceability
ease of maintaining and repairing a product
aesthetics
overall appearance/appeal
how it looks, feels, sounds, tastes, smells
perceived quality
customer's perceptions of a product, based on inferences from reputation, brand image, advertising, marketing approach, packaging, etc
costs of quality
prevention
appraisal
internal failure
external failure
prevention costs
costs associated with improving the quality of the product
worker training, design for quality/manufacturability, supplier certification, maintenance, etc
appraisal costs
costs of evaluating the level of quality
inspection, testing, quality audits
internal failure
cost incurred when a product or process fails before it reaches the customer
defective material scrap, rework, machine repair
external failure
cost incurred when the product fails once it reaches the customer
warranty costs, field maintenance/repair, loss of customer good will reputation, product liabilities
failure becomes more expensive
1) the closer it gets to the customer
2) the farther removed from its source that a quality problem is discovered
Deming's 14 points
1) cease dependence on inspection to achieve quality
2) reduce cost by reducing variation
3) training on the job
4) drive out fear
5) eliminate slogans, exhortations, targets
6) remove barriers to pride of workmanship
inspection drawbacks
cannot inspect quality into a product
fails to address the process
not 100% reliable
acceptance sampling
inspecting a random sample or subset from a batch of goods to determine if the quality level of the entire lot is acceptable
less costly than inspecting an entire batch
PDCA
plan
do
check
act
plan
identifying and analyzing the problem
do
developing and testing a potential solution
check
measuring how effective the test solution was, and analyzing whether it could be improved in any way