Aggregate Production Plan (APP)

managerial statement of time phased:

- production rates

- work force levels

- inventory investment

taking into account customer requirements and capacity limitations

2
New cards

Nature of APP

- Mid Range

- medium term time horizon

- Driven by the forecast

- rolling horizon

3
New cards

Aggregate

converting everything to "person hours"

- classes of products/labor/other inputs

- geographic location of production

- often fictitious

4
New cards

fictitious

highly abstract

5
New cards

Nature of Aggregation

depends on nature of your problem

- nature of product

- nature of raw material used

- nature of other resource/input

6
New cards

nature of business determines

length of horizons and size of buckets

7
New cards

APP Time Horizon

medium time horizon, divided into time buckets that vary depending on the nature of your business

(12 months, 1 month buckets)

8
New cards

short horizon & short time buckets

industry with rapid new product development and high variability

9
New cards

long horizon & long time buckets

industry with long lead times and stable products

10
New cards

Rolling Horizon Basis

do not wait for an entire plan to be executed to develop a new one

**as first bucket is completed, a meeting is held to evaluated remaining months and tack a new month onto the end of the project

11
New cards

3 stages of Disaggregation

master production schedule

material requirements planning

shop floor scheduling

12
New cards

Master Production Schedule (MPS)

first level of disaggregation of the aggregate plan. break down groups of products into more real end product items

formulated and evaluated at lower organizational level than APP

*due to greater specificity and more frequent revision

"when"

13
New cards

MPS Horizon

shorter time horizon with finer time buckets

rolling horizon (3-6 months, 1 week buckets)

*NEVER longer than aggregate plan

14
New cards

Material Requirements Planning (MRP)

second level of disaggregation

extreme detail, down to every nut and bolt

"what/stuff"

15
New cards

Shop Floor Scheduling

last stages of disaggregation/specificity with very precise detail and no "aggregated" products

actual production plan

"who/when"

16
New cards

Types of Strategic Plans

represent extremes on a continuum, where companies implement plans that fall in the middle - usually leaning more toward one extreme than the others

- chase strategy

- level strategy

- stable workforce plan

17
New cards

chase strategy

production and manpower to fluctuate to perfectly match demand by *firing/hiring* (maintain no inventory)

amount produced = minimum amount required to satisfy demand for that period

18
New cards

when to use chase strategy

when you have temporary workers who are paid on a lower scale

19
New cards

when NOT to use chase strategy

when you have highly skilled workers or workers that need a lot of training

20
New cards

advantages of chase strategy

minimizes inventory and excess capacity (therefore no back order)

21
New cards

disadvantages of chase strategy

costs from hiring and firing

22
New cards

level strategy

constant production/workforce level with fluctuating inventory

with/without backorder

high inventory holding costs

*most expensive

23
New cards

when to use level strategy

when inventory storage is inexpensive and easily achieved

when raw material deliveries must be determined well in advance of delivery

when production requires highly trained labor

24
New cards

when NOT to use level strategy

when inventory storage is expensive and difficult to achieve

when raw material deliveries don't have to be determine well in advance of delivery

25
New cards

level with backorder

when a negative value appears on the ending inventory line (because demand has exceeded our set production level at that point)

26
New cards

level without backorder

plan with minimum level of inventory. one of the ending inventories equals zero

27
New cards

advantages of level strategy

simple and consistent

28
New cards

disadvantages of level strategy

inconsistency of demand means there will be excess production and back orders

29
New cards

stable workforce strategy

constant workforce size with variable working hours, with intent of keeping inventory as low as possible

keeping inventory as low as possible

overtime

*least expensive

30
New cards

when to use stable workforce strategy

when hiring and firing costs are too expensive and inventory storage is expensive

31
New cards

stable workforce advantages

no hiring/firing costs

32
New cards

stable workforce disadvantages

when demand decreases, hours decrease

- you pay for work you aren't receiving

33
New cards

Transformation Stage Inventory

raw material

work in process

finished good

34
New cards

goal of inventory management

identify an inventory policy that is the most cost effective

35
New cards

raw material

inventory which has not undergone any transformation by the company

*can be highly processed parts as long as all processing was performed outside of operational unit in question

36
New cards

work in process (WIP)

inventory that has undergone transformation but is not yet completed

37
New cards

finished good

inventory which has undergone all transformations and is ready to be passed onto the customer

38
New cards

Holding Inventory

safety stock

cycle stock

pipeline stock

seasonal stock

39
New cards

safety stock

inventory being held to buffer against some form of uncertainty (usually amount of demand or supply)

40
New cards

cycle stock

inventory being held because supply/source of product is not continuous

41
New cards

reasons for cycle stock

- process requires batching

- required resources shared w/ more than one product

- not economically efficient to produce continuously

42
New cards

pipeline stock

inventory that is located somewhere int he production or delivery process

43
New cards

seasonal stock

inventory that is held to buffer against seasonality in demand

44
New cards

measures of inventory

- number of units

- dollar value of units

- weeks of supply

- inventory turns

45
New cards

number of units

an absolute measure/physical count

something that should always be known

not useful from an evaluative standpoint

46
New cards

dollar value of units

a cost measure

choice of value (cost or sales) depends on the context in which the measure is to be used

47
New cards

weeks of supply

a relative volume measure

number of units of inventory divided by weekly demand rate

inventory equivalent of ROI

48
New cards

inventory turns

a relative measure

annual sales volume divided by number of units in inventory

inverse of "years of supply" measure

49
New cards

Why is inventory important?

- material availability (assuring customer orders are met)

- COSTS MONEY

- must meet customer demand while minimizing costs

- fixed order quantity models

50
New cards

FOQ (fixed order quantity) Assumptions

- demand constant

- item produced/purchased in lots

- independence

- no uncertainty in demand/supply

- replenishment is instantaneous

- holding, setup, purchasing are only relevant costs

51
New cards

independence

no relationship between supply and demand or # of items and per unit price

52
New cards

instantaneous replenishment

100% fulfillment at one time, get everything at once

53
New cards

Total Annual Holding Cost (TAHC)

cost of insurance, capital, warehousing, shrinkage, etc

increases when inventory increases

54
New cards

TAHC equation

(avg inventory level) (per unit annual cost)

55
New cards

holding

= carrying

56
New cards

Total Annual Setup Cost (TASC)

= ordering

administrative charges, delivery charges, labor costs, defects, testing, etc

57
New cards

TASC equation

(# of setups per year) (cost of a setup)

58
New cards

setup

= ordering

59
New cards

Total Annual Purchasing Cost (TAPC)

actual cost/vale of a years demand

60
New cards

TAPC equation

(cost of item) (annual demand for item)

61
New cards

basic FOQ model

demand is constant and order quantity arrives all at once

monitor inventory constantly and reorder a fixed quantity when the inventory level falls to a previously determined reorder point

lead time not necessarily zero (RP = demand during lead time)

62
New cards

how big should Q be?

the value that minimizes costs

63
New cards

what costs should we attempt to minimize?

all of them

64
New cards

economic Q

total cost minimized

65
New cards

economic order quantity (optimal Q)

- one of the most famous formulas in business history

- developed on annual basis & can work on any time basis

- units must be consistent

(D and i same time frame)

(D and C same size product)

- RP = DLT

- TAHC = TASC at optimal Q

66
New cards

FOQ with usage

when item is being produced in house or manufactured, the order arrives gradually over time

no instantaneous replenishment

lower costs

larger order quantity (Q)

67
New cards

FOQ with uncertain demand

no assumption of certain demand

normally distributed demand

instantaneous replenishment

service level = % change no stockout during a given inventory cycle

68
New cards

Q

amount to order

69
New cards

D

demand rate

70
New cards

S

cost per setup or order

71
New cards

H

cost to hold a single unit in inventory for a fixed period of time

72
New cards

C

cost of the item

73
New cards

i

per unit holding cost

expressed as percentage of cost of item

74
New cards

P

production/delivery rate of an item

75
New cards

where quality comes from

process

if you want to change an outcome, change the process

76
New cards

two great enemies

waste (MUDA)

variability (SPC, TQM, Six Sigma)

77
New cards

types of waste

overproduction

defects

movement

under-utilizing human resources

78
New cards

total quality management (TQM)

managing the entire organization so that it excels on all dimensions of products and services that are important to the customer

lean six sigma

79
New cards

dimensions of quality

performance

features

reliability

durability

conformance

serviceability

aesthetics

perceived quality

80
New cards

performance

the product's primary operating characteristics

81
New cards

features

supplements to a product's basic function

bells and whistles

82
New cards

reliability

time until a product malfunctions and needs repair

83
New cards

durability

time until a product needs replacement

84
New cards

conformance

degree to which a product conforms to established standards

85
New cards

serviceability

ease of maintaining and repairing a product

86
New cards

aesthetics

overall appearance/appeal

how it looks, feels, sounds, tastes, smells

87
New cards

perceived quality

customer's perceptions of a product, based on inferences from reputation, brand image, advertising, marketing approach, packaging, etc

88
New cards

costs of quality

prevention

appraisal

internal failure

external failure

89
New cards

prevention costs

costs associated with improving the quality of the product

worker training, design for quality/manufacturability, supplier certification, maintenance, etc

90
New cards

appraisal costs

costs of evaluating the level of quality

inspection, testing, quality audits

91
New cards

internal failure

cost incurred when a product or process fails before it reaches the customer

defective material scrap, rework, machine repair

92
New cards

external failure

cost incurred when the product fails once it reaches the customer

warranty costs, field maintenance/repair, loss of customer good will reputation, product liabilities

93
New cards

failure becomes more expensive

1) the closer it gets to the customer

2) the farther removed from its source that a quality problem is discovered

94
New cards

Deming's 14 points

1) cease dependence on inspection to achieve quality

2) reduce cost by reducing variation

3) training on the job

4) drive out fear

5) eliminate slogans, exhortations, targets

6) remove barriers to pride of workmanship

95
New cards

inspection drawbacks

cannot inspect quality into a product

fails to address the process

not 100% reliable

96
New cards

acceptance sampling

inspecting a random sample or subset from a batch of goods to determine if the quality level of the entire lot is acceptable

less costly than inspecting an entire batch

97
New cards

PDCA

plan

do

check

act

98
New cards

plan

identifying and analyzing the problem

99
New cards

do

developing and testing a potential solution

100
New cards

check

measuring how effective the test solution was, and analyzing whether it could be improved in any way