Week 10 Content - Inventory Management

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/50

encourage image

There's no tags or description

Looks like no tags are added yet.

51 Terms

1
New cards

Inventory

Stock of items or resources held for future use or sale; buffers the timing gap between supply and demand.

2
New cards

Purpose of Inventory

Keep operations moving, absorb uncertainty, and take advantage of economic opportunities.

3
New cards

Inventory Management

Balancing product availability and customer service against the costs of holding inventory.

4
New cards

Stockout

When inventory is unavailable to meet demand.

5
New cards

Stockout Costs

Lost sales, backorders, expediting costs, and operational disruptions caused by insufficient inventory.

6
New cards

Holding Costs

Costs of carrying inventory, including storage, capital, insurance, and obsolescence.

7
New cards

Inventory System

A system that monitors stock and determines how and when inventory is replenished.

8
New cards

Customer Order Decoupling Point

Point where operations switch from forecast-driven activities to responding to an actual customer order.

9
New cards

Decoupling Point Tradeoff

Moving the point upstream increases customization but generally increases customer waiting time.

10
New cards

Single-Period Inventory Model

Used when a stocking decision is made once before uncertain demand is known.

11
New cards

Newsvendor Model

Determines the optimal quantity to stock by balancing the costs of overstocking and understocking.

12
New cards

Overage Cost (Co)

Cost of having one unit left over; generally purchase cost minus salvage value.

13
New cards

Underage Cost (Cu)

Cost of being one unit short; generally selling price minus purchase cost.

14
New cards

Salvage Value

Amount recovered from an unsold item at the end of the selling period.

15
New cards

Critical Ratio

Cu / (Cu + Co); probability target used to determine the optimal newsvendor quantity.

16
New cards

High Underage Cost

Leads to a higher critical ratio and a larger optimal order quantity.

17
New cards

High Overage Cost

Leads to a lower critical ratio and a smaller optimal order quantity.

18
New cards

Newsvendor Optimal Quantity

Q = mean demand + z × standard deviation of demand.

19
New cards

Negative Newsvendor z-Score

Indicates that the optimal quantity is below average demand.

20
New cards

Multi-Period Inventory Model

Used when inventory is replenished repeatedly over time.

21
New cards

Economic Order Quantity (EOQ)

Order quantity that minimizes annual ordering and holding costs.

22
New cards

EOQ Formula

Q* = square root of (2DS / H).

23
New cards

Annual Demand (D)

Total units demanded during one year.

24
New cards

Ordering Cost (S)

Cost incurred each time an order is placed.

25
New cards

Annual Holding Cost (H)

Cost of holding one unit in inventory for one year; may equal i × C.

26
New cards

Annual Ordering Cost

(D / Q) × S.

27
New cards

Annual Holding Cost Formula

(Q / 2) × H for basic EOQ without safety stock.

28
New cards

Relevant Annual Inventory Cost

Annual ordering cost plus annual holding cost.

29
New cards

EOQ Cost Relationship

At the optimal EOQ, annual ordering cost equals annual holding cost.

30
New cards

Large Order Quantities

Reduce ordering frequency and ordering costs but increase average inventory and holding costs.

31
New cards

Small Order Quantities

Increase ordering frequency and ordering costs but reduce average inventory and holding costs.

32
New cards

Average Cycle Inventory

Q / 2 in the basic EOQ model.

33
New cards

Sawtooth Inventory Pattern

Inventory decreases steadily with demand and rises when replenishment arrives.

34
New cards

Deterministic Demand

Demand that is known and constant.

35
New cards

Lead Time

Time between placing an order and receiving it.

36
New cards

Reorder Point (R)

Inventory position that triggers placing a replenishment order.

37
New cards

Basic Reorder Point

R = average daily demand × lead time.

38
New cards

Continuous-Review System

Inventory is monitored continuously and an order is placed when inventory position reaches the reorder point.

39
New cards

Inventory Position

On-hand inventory plus on-order inventory minus backorders.

40
New cards

Safety Stock (SS)

Extra inventory held to protect against uncertain demand during lead time.

41
New cards

Cycle Service Level (CSL)

Probability of avoiding a stockout during a replenishment cycle.

42
New cards

Higher Cycle Service Level

Requires a larger z-score, more safety stock, and a higher reorder point.

43
New cards

Daily Demand Standard Deviation

Measure of how much daily demand varies around its average.

44
New cards

Lead-Time Demand Standard Deviation

For independent daily demand and fixed lead time, daily standard deviation × square root of lead time.

45
New cards

Safety Stock Formula

SS = z × daily demand standard deviation × square root of lead time.

46
New cards

Reorder Point with Safety Stock

R = expected lead-time demand + safety stock.

47
New cards

Uncertain Demand Effect

Increases the need for safety stock and the reorder point but does not change EOQ under the course model.

48
New cards

Inverse Service-Level Problem

Use the existing reorder point to calculate z and determine the implied cycle service level.

49
New cards

Inverse z-Score Formula

z = (R − expected lead-time demand) / lead-time demand standard deviation.

50
New cards

EOQ vs. Reorder Point

EOQ determines how much to order; reorder point determines when to order.

51
New cards

Safety Stock vs. Cycle Stock

Cycle stock supports normal replenishment; safety stock protects against demand uncertainty.