Note
0.0
(0)
Rate it
Take a practice test
Chat with Kai
undefined Flashcards
0 Cards
0.0
(0)
Explore Top Notes
IB PHYSICS Topic 5: Electricity and Magnetism
Note
Studied by 197 people
5.0
(1)
Linear Functions
Note
Studied by 100 people
5.0
(1)
Urbanization (Prehistoric Era to 600 CE)
Note
Studied by 12 people
5.0
(1)
Chapter 8: The Power and Limits of a Market
Note
Studied by 14 people
5.0
(1)
Chapter 10: Medical and Legal Aspects of Anesthetic and Operative Deaths
Note
Studied by 27 people
5.0
(2)
Cell Organelles
Note
Studied by 202 people
5.0
(2)
Home
Lean Supply Chain Management
Lean Supply Chain Management
Lean Principles
Pull processing
Waste minimization
Continuous improvement – PDCA model
Plan-Do-Check-Act model (Figure 12.1)
Flexibility
Automation
Benefits: faster waste elimination, Internet of Things (IoT), controlled costs, increased worker safety, maximized employee productivity
Load leveling
Lean vs Agile Supply Chains (Table 12.1)
Lean:
Typical products: Commodities/functional/lasting
Demand: Predictable/consistent
Product lifecycle: Long
Product variety: Low
Consumer drivers: Cost
Agile:
Typical products: Fashion goods/trending/variable
Demand: Volatile/market-based
Product lifecycle: Short
Product variety: High
Consumer drivers: Availability/popular assortment
Lean Tools and Techniques
Poka-Yoke
Value Stream Mapping (Figures 12.2 & 12.3)
5S Visual Management (Figures 12.4 - 12.8)
Sort (Seiri)
Set in order (Seiton)
Shine (Seiso)
Standardize (Seiketsu)
Sustain (Shitsuke)
Just-in-time (JIT)
One-piece flow production (Figure 12.9)
Point-of-use storage (POUS) (Figure 12.10)
Types of Waste
Over-production
Reasons: poor understanding of customer needs, badly implemented automation, product design changes, producing for forecast.
Inefficient transportation (Figure 12.12)
Unnecessary motion (Figure 12.13)
Waiting time (Figure 12.14)
Reasons: waiting out buffer time, machine cycle time, end of process, parts delivery, or support.
Defects
Product deviates from standard design
Over-processing
More work than necessary
Six Sigma
DMAIC Model (Figure 12.15)
Define, Measure, Analyse, Improve, Control
DMADV Model (Figure 12.16)
Define, Measure, Analyse, Design, Verify
Goals and Strategy of Lean Supply Chains
Organizational Objectives
Improved quality
Eliminate waste
Reduce time
Reduce total cost
Advantages and Disadvantages of Lean Supply Chains
Advantages
Waste minimization
Emphasize consumer wants
Lean infrastructure
Disadvantages
Employee dissatisfaction
Equipment failure
Delivery inconsistencies
Note
0.0
(0)
Rate it
Take a practice test
Chat with Kai
undefined Flashcards
0 Cards
0.0
(0)
Explore Top Notes
IB PHYSICS Topic 5: Electricity and Magnetism
Note
Studied by 197 people
5.0
(1)
Linear Functions
Note
Studied by 100 people
5.0
(1)
Urbanization (Prehistoric Era to 600 CE)
Note
Studied by 12 people
5.0
(1)
Chapter 8: The Power and Limits of a Market
Note
Studied by 14 people
5.0
(1)
Chapter 10: Medical and Legal Aspects of Anesthetic and Operative Deaths
Note
Studied by 27 people
5.0
(2)
Cell Organelles
Note
Studied by 202 people
5.0
(2)