Principles of Plumbing
Legal foundation, 22 basic principles, and the complete plumbing
cycle.
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Plumbing: definition, scope, and legal basis
Plumbing is the art and technique of installing pipes, fixtures, and other
apparatuses in buildings from bringing in the supply, liquids,
substances, and/or ingredients and removing them; and such water,
liquid, and other carried-wastes hazardous to health, sanitation, life,
property, also the pipes and fixtures after installation i.e. the plumbing
system. The professional practice of plumbing in the Philippines is
governed and enacted by the Republic Act 1378, which is also called
as the Plumbing Law. The law mandates the implementation of the
National Plumbing Code of the Philippines way back before in its origin
as the Plumbing Law of the Philippines based on the History of
Plumbing Practice in the current Revised National Plumbing Code of
the Philippines.
The code provides the basic principles of plumbing which stands as
the core foundations of the code itself which dates back from the first
release of the code in the form of the Plumbing Law of the Philippines.
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 1
All premises intended for human habitation,
occupancy or use shall be provided with a
supply of pure and wholesome water, neither
connected with unsafe water supplies nor
subject to hazards of backflow or back-
siphonage
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 2
Plumbing fixtures, devices and
appurtenances shall be supplied with water in
sufficient volume and pressure adequate to
function satisfactorily and without undue
noise
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 3
Plumbing shall be designed and adjusted to
use the minimum quantity of water consistent
with proper performance and cleaning
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 4
Devices for heating and storing water shall be
so designed and installed as to prevent
dangers from explosion through overheating
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 5
Every building abutting on a street, alley or
easement with a public sewer shall connect
its plumbing fixtures to the sewer system
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 6
Each family dwelling unit shall have at least
one water closet, one kitchen type sink, a
lavatory and a bathtub or shower to meet the
basic requirements of sanitation and personal
hygiene
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 7
Plumbing fixtures shall be made of smooth
non-absorbent material, free from concealed
fouling surfaces and shall be located in
ventilated enclosures
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 8
The drainage system shall be designed,
constructed and maintained to safeguard
against fouling, deposit of solids, clogging
and with adequate cleanouts so arranged that
the pipes may be readily cleaned
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 9
All piping shall be of durable NAMPAP-
APPROVED materials, free from defective
workmanship, designed and constructed by
Registered Master Plumbers to ensure
satisfactory service
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 10
Each fixture directly connected to the
drainage system shall be equipped with a
water-sealed trap
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 11
The drainage pipes piping system shall be
designed to provide adequate circulation of
air free from siphonage, aspiration or forcing
of trap seals under ordinary use
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 12
Vent terminals shall extend to the outer air
and installed to prevent clogging and the
return of foul air to the building
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 13
Plumbing systems shall be subjected to such
tests to effectively disclose all leaks and
defects in the workmanship
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 14
Substance which will clog the pipes, produce
explosive mixtures, destroy the pipes or their
joints or interfere unduly with the sewage-
disposal process shall not be allowed to enter
the building drainage system
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 15
Proper protection shall be provided to prevent
contamination of food, water, sterile goods
and similar materials by backflow of sewage.
When necessary, the fixture, device or
appliance shall be connected indirectly with
the building drainage system
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 16
No water closet shall be located in a room or
compartment which is not properly lighted
and ventilated
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 17
If there is no sewer system in the area,
suitable provision shall be made for the
disposal of building sewage by some
accepted method of sewage treatment and
disposal, such as a septic tank
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 18
Where a plumbing drainage system may be
subject to backflow of sewage, suitable
provision shall be made to prevent its
overflow in the building
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 19
Plumbing systems shall be maintained in
serviceable condition by Registered Master
Plumbers
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 20
All plumbing fixtures shall be installed
properly spaced, to be accessible for their
intended use
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 21
Plumbing shall be installed with due regard to
the preservation of the strength of structural
members and the prevention of damage to
walls and other surfaces through fixture
usage
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Principle 22
Sewage or other waste from plumbing system
which may be deleterious to surface or sub-
surface waters shall not be discharged into
the ground or into any waterway, unless first
rendered innocuous through subjection to
some acceptable form of treatment
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
The plumbing cycle
• Source — lakes, rivers, reservoirs, dams, or
other approved water sources.
• Supply and distribution — utility mains and
pressure piping deliver potable water to
communities and buildings.
• Use and collection — fixtures consume water;
drainage networks collect sanitary wastewater and
storm runoff.
• Treatment and return — sewage is treated
before discharge; treated water returns to natural
water systems.
F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING
Water function: distribution expands; collection
converges
• A single source branches into large distribution
networks, service pipes, building mains, branches,
and fixture supplies.
• After use, numerous fixture discharges converge
into branches, stacks, sewers, and treatment
facilities.
• The supply side protects quality and pressure;
the disposal side protects health and receiving
waters.
• Good design evaluates the entire path from
source to final disposal.
F e r n a n d o, J P PDESIGN PROVISIONS
FOR PLUMBING
Building
Systems
Design
Fernando, JPP02
Design Provisions for Plumbing
Water distribution, fixtures, drainage layout, traps, cleanouts, and
separators.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Water distribution system: components and sequence
• Water service entrance — connects the outside source or
community main to the building supply.
• Water meter — records consumption and is commonly
paired with isolating/check valves.
• Main distribution pipe — carries water into and through the
building.
• Branches and risers — serve fixtures and upper floors;
valves regulate flow; tanks provide reserve storage.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Plumbing fixtures: three functional groups
• Soil fixtures receive black water that may contain fecal
matter; examples include water closets and urinals.
• Scullery fixtures serve washing, food-preparation, and
utility functions; examples include sinks, lavatories, and
laundry tubs.
• Bathing fixtures include bathtubs, showers, whirlpools,
Jacuzzis, bidets, and floor drains.
• Fixture classification affects trap size, branch load,
wastewater character, and venting needs.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Water closets: flushing source
• Flush-tank water closets store a measured
volume before discharge.
• Direct-flush or flushometer-valve water closets
use pressurized supply directly.
• The flushing source changes the WSFU demand
curve and the minimum pressure needed at the
fixture.
• Sizing calculations must use the predominant
flushing mechanism for the system.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Water closets: flush-tank configurations
• Integral tank — tank and bowl form a single unit.
• Close-coupled tank — tank is mounted directly
on the bowl.
• Low tank — tank is positioned low behind or
near the bowl.
• High tank — tank is elevated and connected by
a flush pipe.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Water closets: mounting and flushing action
• Mounting may be floor-mounted or wall-hung;
coordinate carriers, rough-in dimensions, and
structural support.
• Common flushing actions include washdown,
reverse trap, siphon jet, siphon vortex, and direct
flush valve.
• Other forms include squat-type and washout
closets.
• The bowl/trapway geometry and flushing action
influence performance and water use.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Water closets: squat-type and washout forms
• Squat-type closets are floor-level soil fixtures
used in a squatting posture.
• Washout closets use a relatively shallow bowl
and a flushing stream that moves waste toward the
outlet.
• Both still require correct trapway, flushing supply,
rough-in, clearances, and code-approved
installation.
• Fixture form does not remove the need for
adequate water supply, ventilation, and a
watertight connection to the soil pipe.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Water-closet components and setting
• Typical components include the tank,
float/ballcock, flush valve, overflow tube, bowl rim,
trapway, closet flange, and seat.
• Minimum centerline to side wall: 0.375 m.
• Minimum water-closet center-to-center spacing:
0.75 m.
• Verify occupancy-based fixture counts against
the applicable code table.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Urinals: types, spacing, and flushing
• Common types: wall-hung, pedestal, trough, and
stall.
• Minimum centerline to side wall: 0.30 m;
minimum center-to-center spacing: 0.60 m.
• Automatic flushing tanks or self-closing
flushometer valves should deliver a predetermined
quantity of water.
• Do not use manually controlled flushometer
valves for group urinals; use code tables for
occupancy counts.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Occupancy-based fixture-count tables
• Minimum quantities of water closets and urinals
vary with occupancy and the number of users.
• Read the correct row for the building use and
apply the table’s user-count brackets.
• Coordinate separate male/female or all-user
requirements as the applicable code directs.
• The fixture schedule should document both the
calculated demand and the code-minimum count.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Scullery fixtures and grey-water collection
• Scullery fixtures serve kitchen, dining, cooking, laundry,
and general washing functions.
• Kitchen sinks, bar sinks, slop sinks, lavatories, and
laundry tubs normally discharge grey water through waste
pipes.
• Typical sink/tub materials include stainless steel,
enameled cast iron, and porcelain-enameled formed steel.
• Select fixtures for durability, hygiene, cleaning, and
compatibility with the supporting counter or wall.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Lavatory types
• Pedestal — basin supported by a pedestal with
concealed or exposed piping.
• Wall-hung — supported from the wall; keeps the
floor clear.
• Countertop/Pullman — set into or on a counter
surface.
• Trough — elongated basin for multiple users;
coordinate faucet and drain spacing.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Bathing fixtures, bidets, and floor drains
• Bathing fixtures discharge grey water: bathtubs,
whirlpools, Jacuzzis, showers, and bidets.
• Bidet: 0.375 m minimum from centerline to side wall and
0.75 m center-to-center.
• Shower receptors, dams, and curbs control water within
the bathing area.
• Receptor elevation: at least 25.4 mm below the outside
floor; curb-to-drain height is 51–228 mm.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Shower-compartment clearances
• Minimum interior area: 0.6 m².
• The compartment must contain a 762 mm diameter circle.
• Maintain the required clear space from the drain level to
1.78 m high, except for valves, shower heads, and safety
grab rails.
• In gang shower rooms, drains should be spaced no more
than 4.9 m apart.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Fixture-unit rating (FU)
• Fixture Unit Rating is an index used to represent
the probable drainage load imposed by a fixture.
• The code relates fixture type to minimum trap
diameter and drainage fixture-unit value.
• For fixtures not listed, determine the equivalent
FU from rated discharge capacity.
• Use the total FU to size branches, stacks, and
building drains in accordance with code limits.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Fixture-unit rating (FU)
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Discharge capacity and maximum trap loading
• Discharge-rate tables translate liters per second
into drainage fixture units.
• Maximum trap-loading tables relate pipe/trap
diameter to allowable fixture units.
• The referenced maximum trap-loading rule
excludes self-service laundries.
• Always distinguish drainage FU from water-
supply fixture units (WSFU).
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Drainage changes in direction
• Horizontal-to-horizontal: use 45° wye branches,
combination wye–1/8 bends, or approved fittings of
equivalent sweep.
• Horizontal-to-vertical: use 45°
–60° wyes,
combination wye–1/8 bends, sanitary tees, or
equivalent approved fittings.
• Select the fitting orientation so solids follow a
smooth path without striking an abrupt shoulder.
• Drainage turns require more sweep than vent
turns.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Grade of horizontal drainage piping
• Default minimum slope: 2% = 20 mm/m ≈ 1/4 in
per foot toward disposal.
• Where 2% is impractical because of sewer
depth, structure, or layout, pipes 102 mm and
larger may be permitted at 1% = 10 mm/m.
• The reduced slope requires prior approval by the
administrative authority.
• A continuous, uniform grade supports self-
cleansing flow and reduces deposits.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Cleanouts: access for inspection and clearing
• A cleanout is a capped access opening used for drain
snakes and other clearing equipment.
• Provide a cleanout at the upper terminal of each horizontal
drainage line.
• Provide cleanouts for runs longer than 15 m and at each
additional 15 m or fraction.
• Keep cleanouts accessible after architectural finishes and
equipment are installed.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Traps: purpose and prohibited arrangements
• A trap holds a liquid seal that blocks foul air from the
drainage system.
• Each directly connected fixture normally requires its own
approved trap, except fixtures with integral traps.
• Do not double-trap a fixture.
• Traps with movable parts or concealed interior partitions
and the S-trap are prohibited by the referenced code.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Trap connections, shared traps, and seal depth
• A centrally located trap may serve up to three
adjacent single-compartment sinks, laundry tubs,
or lavatories in one room when outlets are within
0.75 m.
• Trap size must match the trap arm to which it is
connected.
• Required water-seal depth is normally 51–102
mm unless a deeper seal is specifically approved.
• Keep the trap and its cleanout accessible for
service.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Trap anatomy
• Trap arm — the outlet leg from the trap toward
the vented drainage branch.
• Trap dip and trap crown — lower and upper
portions that define the water seal.
• Trap weir — the overflow point controlling seal
depth.
• Tailpiece, inlet, outlet, adapter, and cleanout
complete the fixture-to-drain connection.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Minimum trap sizes and installation limits
• Use the code table to select the minimum trap
and trap-arm diameter for each fixture.
• Fixture outlet tailpiece to trap weir: maximum
vertical distance 0.60 m.
• Water-closet trap arm: maximum developed
length 1.8 m to the vent connection.
• Provide a cleanout for direction changes greater
than 22.5° on trap arms 76 mm or larger.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Horizontal distance of trap arms
• Maximum trap-arm distance depends on trap-
arm diameter and its slope to the vent.
• The source table lists 0.76 m for 32 mm, 1.07 m
for 38 mm, 1.52 m for 51 mm, and 1.83 m for 76
mm arms.
• For 102 mm and larger, the listed maximum is
3.05 m.
• In no case should trap-to-vent distance be less
than two times the trap-arm diameter.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Interceptors: retain unwanted matter before disposal
• An interceptor separates and retains undesirable
material while allowing normal liquid waste to
continue by gravity.
• A grease interceptor is a common example in
food-service drainage.
• Referenced requirements: minimum 152 mm
water seal and proper ventilation.
• Locate and detail interceptors for inspection,
cleaning, and removal of retained material.
F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING
Clarifiers and separators
• Clarifiers are settling tanks that remove
suspended solids by sedimentation, often with
mechanical solids removal.
• Clarified liquid continues while retained solids
are collected, thickened, dried, and disposed.
• Separators isolate materials such as grease, oil,
or sediment from the waste stream.
• Selection depends on the contaminant, flow,
required retention, ventilation, and maintenance
access.