Untitled

Principles of Plumbing

Legal foundation, 22 basic principles, and the complete plumbing

cycle.

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Plumbing: definition, scope, and legal basis

Plumbing is the art and technique of installing pipes, fixtures, and other

apparatuses in buildings from bringing in the supply, liquids,

substances, and/or ingredients and removing them; and such water,

liquid, and other carried-wastes hazardous to health, sanitation, life,

property, also the pipes and fixtures after installation i.e. the plumbing

system. The professional practice of plumbing in the Philippines is

governed and enacted by the Republic Act 1378, which is also called

as the Plumbing Law. The law mandates the implementation of the

National Plumbing Code of the Philippines way back before in its origin

as the Plumbing Law of the Philippines based on the History of

Plumbing Practice in the current Revised National Plumbing Code of

the Philippines.

The code provides the basic principles of plumbing which stands as

the core foundations of the code itself which dates back from the first

release of the code in the form of the Plumbing Law of the Philippines.

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 1

All premises intended for human habitation,

occupancy or use shall be provided with a

supply of pure and wholesome water, neither

connected with unsafe water supplies nor

subject to hazards of backflow or back-

siphonage

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 2

Plumbing fixtures, devices and

appurtenances shall be supplied with water in

sufficient volume and pressure adequate to

function satisfactorily and without undue

noise

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 3

Plumbing shall be designed and adjusted to

use the minimum quantity of water consistent

with proper performance and cleaning

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 4

Devices for heating and storing water shall be

so designed and installed as to prevent

dangers from explosion through overheating

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 5

Every building abutting on a street, alley or

easement with a public sewer shall connect

its plumbing fixtures to the sewer system

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 6

Each family dwelling unit shall have at least

one water closet, one kitchen type sink, a

lavatory and a bathtub or shower to meet the

basic requirements of sanitation and personal

hygiene

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 7

Plumbing fixtures shall be made of smooth

non-absorbent material, free from concealed

fouling surfaces and shall be located in

ventilated enclosures

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 8

The drainage system shall be designed,

constructed and maintained to safeguard

against fouling, deposit of solids, clogging

and with adequate cleanouts so arranged that

the pipes may be readily cleaned

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 9

All piping shall be of durable NAMPAP-

APPROVED materials, free from defective

workmanship, designed and constructed by

Registered Master Plumbers to ensure

satisfactory service

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 10

Each fixture directly connected to the

drainage system shall be equipped with a

water-sealed trap

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 11

The drainage pipes piping system shall be

designed to provide adequate circulation of

air free from siphonage, aspiration or forcing

of trap seals under ordinary use

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 12

Vent terminals shall extend to the outer air

and installed to prevent clogging and the

return of foul air to the building

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 13

Plumbing systems shall be subjected to such

tests to effectively disclose all leaks and

defects in the workmanship

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 14

Substance which will clog the pipes, produce

explosive mixtures, destroy the pipes or their

joints or interfere unduly with the sewage-

disposal process shall not be allowed to enter

the building drainage system

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 15

Proper protection shall be provided to prevent

contamination of food, water, sterile goods

and similar materials by backflow of sewage.

When necessary, the fixture, device or

appliance shall be connected indirectly with

the building drainage system

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 16

No water closet shall be located in a room or

compartment which is not properly lighted

and ventilated

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 17

If there is no sewer system in the area,

suitable provision shall be made for the

disposal of building sewage by some

accepted method of sewage treatment and

disposal, such as a septic tank

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 18

Where a plumbing drainage system may be

subject to backflow of sewage, suitable

provision shall be made to prevent its

overflow in the building

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 19

Plumbing systems shall be maintained in

serviceable condition by Registered Master

Plumbers

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 20

All plumbing fixtures shall be installed

properly spaced, to be accessible for their

intended use

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 21

Plumbing shall be installed with due regard to

the preservation of the strength of structural

members and the prevention of damage to

walls and other surfaces through fixture

usage

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Principle 22

Sewage or other waste from plumbing system

which may be deleterious to surface or sub-

surface waters shall not be discharged into

the ground or into any waterway, unless first

rendered innocuous through subjection to

some acceptable form of treatment

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

The plumbing cycle

• Source — lakes, rivers, reservoirs, dams, or

other approved water sources.

• Supply and distribution — utility mains and

pressure piping deliver potable water to

communities and buildings.

• Use and collection — fixtures consume water;

drainage networks collect sanitary wastewater and

storm runoff.

• Treatment and return — sewage is treated

before discharge; treated water returns to natural

water systems.

F e r n a n d o, J P P01 PRINCIPLES OF PLUMBING

Water function: distribution expands; collection

converges

• A single source branches into large distribution

networks, service pipes, building mains, branches,

and fixture supplies.

• After use, numerous fixture discharges converge

into branches, stacks, sewers, and treatment

facilities.

• The supply side protects quality and pressure;

the disposal side protects health and receiving

waters.

• Good design evaluates the entire path from

source to final disposal.

F e r n a n d o, J P PDESIGN PROVISIONS

FOR PLUMBING

Building

Systems

Design

Fernando, JPP02

Design Provisions for Plumbing

Water distribution, fixtures, drainage layout, traps, cleanouts, and

separators.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Water distribution system: components and sequence

• Water service entrance — connects the outside source or

community main to the building supply.

• Water meter — records consumption and is commonly

paired with isolating/check valves.

• Main distribution pipe — carries water into and through the

building.

• Branches and risers — serve fixtures and upper floors;

valves regulate flow; tanks provide reserve storage.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Plumbing fixtures: three functional groups

• Soil fixtures receive black water that may contain fecal

matter; examples include water closets and urinals.

• Scullery fixtures serve washing, food-preparation, and

utility functions; examples include sinks, lavatories, and

laundry tubs.

• Bathing fixtures include bathtubs, showers, whirlpools,

Jacuzzis, bidets, and floor drains.

• Fixture classification affects trap size, branch load,

wastewater character, and venting needs.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Water closets: flushing source

• Flush-tank water closets store a measured

volume before discharge.

• Direct-flush or flushometer-valve water closets

use pressurized supply directly.

• The flushing source changes the WSFU demand

curve and the minimum pressure needed at the

fixture.

• Sizing calculations must use the predominant

flushing mechanism for the system.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Water closets: flush-tank configurations

• Integral tank — tank and bowl form a single unit.

• Close-coupled tank — tank is mounted directly

on the bowl.

• Low tank — tank is positioned low behind or

near the bowl.

• High tank — tank is elevated and connected by

a flush pipe.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Water closets: mounting and flushing action

• Mounting may be floor-mounted or wall-hung;

coordinate carriers, rough-in dimensions, and

structural support.

• Common flushing actions include washdown,

reverse trap, siphon jet, siphon vortex, and direct

flush valve.

• Other forms include squat-type and washout

closets.

• The bowl/trapway geometry and flushing action

influence performance and water use.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Water closets: squat-type and washout forms

• Squat-type closets are floor-level soil fixtures

used in a squatting posture.

• Washout closets use a relatively shallow bowl

and a flushing stream that moves waste toward the

outlet.

• Both still require correct trapway, flushing supply,

rough-in, clearances, and code-approved

installation.

• Fixture form does not remove the need for

adequate water supply, ventilation, and a

watertight connection to the soil pipe.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Water-closet components and setting

• Typical components include the tank,

float/ballcock, flush valve, overflow tube, bowl rim,

trapway, closet flange, and seat.

• Minimum centerline to side wall: 0.375 m.

• Minimum water-closet center-to-center spacing:

0.75 m.

• Verify occupancy-based fixture counts against

the applicable code table.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Urinals: types, spacing, and flushing

• Common types: wall-hung, pedestal, trough, and

stall.

• Minimum centerline to side wall: 0.30 m;

minimum center-to-center spacing: 0.60 m.

• Automatic flushing tanks or self-closing

flushometer valves should deliver a predetermined

quantity of water.

• Do not use manually controlled flushometer

valves for group urinals; use code tables for

occupancy counts.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Occupancy-based fixture-count tables

• Minimum quantities of water closets and urinals

vary with occupancy and the number of users.

• Read the correct row for the building use and

apply the table’s user-count brackets.

• Coordinate separate male/female or all-user

requirements as the applicable code directs.

• The fixture schedule should document both the

calculated demand and the code-minimum count.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Scullery fixtures and grey-water collection

• Scullery fixtures serve kitchen, dining, cooking, laundry,

and general washing functions.

• Kitchen sinks, bar sinks, slop sinks, lavatories, and

laundry tubs normally discharge grey water through waste

pipes.

• Typical sink/tub materials include stainless steel,

enameled cast iron, and porcelain-enameled formed steel.

• Select fixtures for durability, hygiene, cleaning, and

compatibility with the supporting counter or wall.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Lavatory types

• Pedestal — basin supported by a pedestal with

concealed or exposed piping.

• Wall-hung — supported from the wall; keeps the

floor clear.

• Countertop/Pullman — set into or on a counter

surface.

• Trough — elongated basin for multiple users;

coordinate faucet and drain spacing.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Bathing fixtures, bidets, and floor drains

• Bathing fixtures discharge grey water: bathtubs,

whirlpools, Jacuzzis, showers, and bidets.

• Bidet: 0.375 m minimum from centerline to side wall and

0.75 m center-to-center.

• Shower receptors, dams, and curbs control water within

the bathing area.

• Receptor elevation: at least 25.4 mm below the outside

floor; curb-to-drain height is 51–228 mm.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Shower-compartment clearances

• Minimum interior area: 0.6 m².

• The compartment must contain a 762 mm diameter circle.

• Maintain the required clear space from the drain level to

1.78 m high, except for valves, shower heads, and safety

grab rails.

• In gang shower rooms, drains should be spaced no more

than 4.9 m apart.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Fixture-unit rating (FU)

• Fixture Unit Rating is an index used to represent

the probable drainage load imposed by a fixture.

• The code relates fixture type to minimum trap

diameter and drainage fixture-unit value.

• For fixtures not listed, determine the equivalent

FU from rated discharge capacity.

• Use the total FU to size branches, stacks, and

building drains in accordance with code limits.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Fixture-unit rating (FU)

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Discharge capacity and maximum trap loading

• Discharge-rate tables translate liters per second

into drainage fixture units.

• Maximum trap-loading tables relate pipe/trap

diameter to allowable fixture units.

• The referenced maximum trap-loading rule

excludes self-service laundries.

• Always distinguish drainage FU from water-

supply fixture units (WSFU).

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Drainage changes in direction

• Horizontal-to-horizontal: use 45° wye branches,

combination wye–1/8 bends, or approved fittings of

equivalent sweep.

• Horizontal-to-vertical: use 45°

–60° wyes,

combination wye–1/8 bends, sanitary tees, or

equivalent approved fittings.

• Select the fitting orientation so solids follow a

smooth path without striking an abrupt shoulder.

• Drainage turns require more sweep than vent

turns.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Grade of horizontal drainage piping

• Default minimum slope: 2% = 20 mm/m ≈ 1/4 in

per foot toward disposal.

• Where 2% is impractical because of sewer

depth, structure, or layout, pipes 102 mm and

larger may be permitted at 1% = 10 mm/m.

• The reduced slope requires prior approval by the

administrative authority.

• A continuous, uniform grade supports self-

cleansing flow and reduces deposits.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Cleanouts: access for inspection and clearing

• A cleanout is a capped access opening used for drain

snakes and other clearing equipment.

• Provide a cleanout at the upper terminal of each horizontal

drainage line.

• Provide cleanouts for runs longer than 15 m and at each

additional 15 m or fraction.

• Keep cleanouts accessible after architectural finishes and

equipment are installed.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Traps: purpose and prohibited arrangements

• A trap holds a liquid seal that blocks foul air from the

drainage system.

• Each directly connected fixture normally requires its own

approved trap, except fixtures with integral traps.

• Do not double-trap a fixture.

• Traps with movable parts or concealed interior partitions

and the S-trap are prohibited by the referenced code.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Trap connections, shared traps, and seal depth

• A centrally located trap may serve up to three

adjacent single-compartment sinks, laundry tubs,

or lavatories in one room when outlets are within

0.75 m.

• Trap size must match the trap arm to which it is

connected.

• Required water-seal depth is normally 51–102

mm unless a deeper seal is specifically approved.

• Keep the trap and its cleanout accessible for

service.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Trap anatomy

• Trap arm — the outlet leg from the trap toward

the vented drainage branch.

• Trap dip and trap crown — lower and upper

portions that define the water seal.

• Trap weir — the overflow point controlling seal

depth.

• Tailpiece, inlet, outlet, adapter, and cleanout

complete the fixture-to-drain connection.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Minimum trap sizes and installation limits

• Use the code table to select the minimum trap

and trap-arm diameter for each fixture.

• Fixture outlet tailpiece to trap weir: maximum

vertical distance 0.60 m.

• Water-closet trap arm: maximum developed

length 1.8 m to the vent connection.

• Provide a cleanout for direction changes greater

than 22.5° on trap arms 76 mm or larger.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Horizontal distance of trap arms

• Maximum trap-arm distance depends on trap-

arm diameter and its slope to the vent.

• The source table lists 0.76 m for 32 mm, 1.07 m

for 38 mm, 1.52 m for 51 mm, and 1.83 m for 76

mm arms.

• For 102 mm and larger, the listed maximum is

3.05 m.

• In no case should trap-to-vent distance be less

than two times the trap-arm diameter.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Interceptors: retain unwanted matter before disposal

• An interceptor separates and retains undesirable

material while allowing normal liquid waste to

continue by gravity.

• A grease interceptor is a common example in

food-service drainage.

• Referenced requirements: minimum 152 mm

water seal and proper ventilation.

• Locate and detail interceptors for inspection,

cleaning, and removal of retained material.

F e r n a n d o, J P P02 DESIGN PROVISIONS FOR PLUMBING

Clarifiers and separators

• Clarifiers are settling tanks that remove

suspended solids by sedimentation, often with

mechanical solids removal.

• Clarified liquid continues while retained solids

are collected, thickened, dried, and disposed.

• Separators isolate materials such as grease, oil,

or sediment from the waste stream.

• Selection depends on the contaminant, flow,

required retention, ventilation, and maintenance

access.