LECTURE 16 GEOSPATIAL
Introduction to GIS and Raster Data
GIS (Geographic Information Systems) operates through multiple layers in the software, each layer shown at the appropriate scale.
When zoomed out: low-resolution layers are displayed (course resolution files).
When zoomed in: higher-resolution layers are shown (fine resolution files).
This method enhances the speed of display by using different resolutions for various scales.
Raster Datasets in GIS
Pyramids in Raster Files
Users may encounter warnings about building pyramids when loading raster files in GIS.
Building pyramids creates low-resolution copies of the original raster data, allowing quick display adjustments based on zoom levels.
Example: multiple cells from fine resolution combine to create a single cell at a coarser resolution.
Important for displaying raster datasets efficiently when zooming in and out.
Storage Implications:
Increased storage space is a trade-off for building pyramids due to the additional copies created.
Raster Data Operations
Overlay Operations
Overlaying rasters can be straightforward, where one cell is placed over another.
Challenges can arise when dealing with raster datasets from different sources:
Cells may have different resolutions (e.g., one raster at 10-meter resolution, another at 30-meter resolution).
GIS automatically adjusts cell sizes to match, allowing overlay operations to work seamlessly.
Resampling Tool:
Tool available to adjust raster dataset cell sizes prior to operations.
Cell size adjustments may lead to loss of data quality:
Degrading resolution results in reduced precision.
Upsampling (going to finer resolution) does not enhance accuracy; it merely increases the number of cells without adding new information.
Calculating Terrain Attributes
Slope Calculation
Used in watershed delineation and flow direction steps within GIS.
Slope is calculated as the change in elevation values between rasters.
Output can be represented in percentage or fractional form.
Aspect Analysis
Aspect indicates the downhill direction of slopes in a topographical area.
Measured in degrees (0 to 360), starting from due north and moving clockwise.
Useful for agricultural planning, sunlight exposure assessment.
Hillshade Analysis
Represents how an area would appear under a light source (e.g., sunlight).
Assumes a light source at a specific azimuth, usually set to 315 degrees by default in ArcGIS.
Users can modify the azimuth and zenith angles to mimic various sun positions throughout the day.
View Shed Analysis
Depicts visibility from a specified observer's height and position in an area.
Accounts for obstructions in visibility (e.g., trees, hills).
Outputs areas that are visible from the observer's perspective.
Metadata in GIS
Metadata Defined: Data that describes other data; essential for understanding dataset usefulness and limitations.
Good metadata should include:
Description of dataset content.
Source and credit information.
Summary and associated limitations.
Importance of metadata in making datasets interpretable and usable by others who may not be familiar with the data's origin.
Color Usage in Mapping
Color Selection for Maps
Choose colors based on the association of datasets:
For similar associations, use colors that are adjacent on the color spectrum.
For contrasting trends, opt for colors that are opposite.
Avoid color combinations that may cause confusion in distinguishing data representations (e.g., violet and red-violet).
Usage of Model Builder in GIS
Model Builder: A tool for automating repetitive GIS tasks, crucial for work with multiple datasets.
Helps create a visual representation of processes:
Define input files, processing steps, and outputs in a flowchart format.
Saves time and minimizes errors when performing numerous similar tasks (e.g., calculating buffers, applying clips, etc.).
Ability to run models with different inputs while maintaining consistency in processing steps.
Facilitates sharing of models with others for replication or teamwork.
Conclusion and Resources
Important to ensure datasets are organized and ready for upcoming projects.
Students are encouraged to address questions and seek assistance as needed for project clarity and progression.
Dataset arrangements will take two to three weeks to finalize for project completion.