Comprehensive EPQ Project Planning, Methodology, and Assessment Guide
EPQ Structure, Assessment Objectives, and Planning Requirements
Candidate Proposal Process:
- Candidates must complete Part A of the proposal in Project Q.
- Proposals must focus on an analytical study rather than a purely descriptive overview (e.g., framing the topic as "A comparative study of…" to guarantee critical analysis).
- The supervisor reviews, checks, and signs off Part B and Part C of the candidate proposal.
- Candidate acceptance feedback and comments provided by Ms. Amy must be incorporated directly into the student's operational project plan.
- Initial planning steps can be logged retrospectively if work has already commenced.
AQA EPQ Assessment Objectives (AO1 Focus):
- Taught Skills Element: Requires approximately of formal taught skills instruction alongside independent research hours.
- AO1 (Manage): Evaluates a candidate's overall capacity to:
- Manage, plan, and carry out an independent research project.
- Apply a wide range of skills, exercises, and research methods.
- Develop and realize planned outcomes, including decision-making and problem-solving when project parameters change.
- Top-Band Criteria for Detailed Project Plan: Requires clear, explicit, and continuous evidence of monitoring progress against agreed SMART objectives throughout the project lifecycle.
Time Management Tools, Strategies, and Goal Setting
Distinction Between Aims and Objectives:
- Aims: Broad, high-level statements of long-term intent (e.g., "aiming to complete research by the end of term").
- Objectives: Specific, actionable, and tactical steps with concrete deliverables (e.g., "draft the first 500 words", "outline the 4,000-word main body structure").
SMART Objectives Framework:
- S: Specific
- M: Measurable
- A: Achievable
- R: Relevant
- T: Time-bound / Time-related (directly linked to explicit interim deadlines).
- Planning Milestone Targets: By the end of September, candidates are expected to show established planning, including SMART objectives and overall project aims spanning the 10-week period leading to draft submission.
Time Management Tools and Portfolio Evidence:
- Supervisors do not prescribe a single mandatory workflow tool; candidates must select and demonstrate tools that best fit their working style.
- Gantt Charts: Visual timeline charts (used by Thomas and top exemplar candidates; candidates can evaluate and discard them if found unhelpful).
- Padlet: Digital logging tool recording exact activities, specific timestamps, and durations spent on each task.
- Spreadsheets: Detailed activity tables mapping tasks against set completion dates.
- Notebook Planners and To-Do Lists: Physical bullet-point logbooks used to track tasks, deadlines, and grade criteria.
- Digital To-Do Applications: Screenshots of digital task lists serve as valid portfolio evidence for AO1 assessment.
- University of Kent Online Research Planner: A stage-by-stage project tool where entering a final target date automatically breaks down interim milestones for research, drafting, and editing.
Academic Integrity, AI Utilization, and Research Methodology
Permissible Use of Artificial Intelligence (AI) Tools:
- Artificial intelligence tools (such as LLMs) are recognized as valid efficiency aids for planning and structuring.
- Acceptable Planning Applications: Breaking down targets into sub-tasks, narrowing research topic scope, generating initial structural ideas, and testing why research questions work or fail.
- Academic Honesty Requirements: AI usage must be explicitly disclosed and recorded in the candidate's production log (e.g., stating: "I used AI to assist in building my timeline and targets…").
- Student Example: Daniel utilized AI tools ("three A's by June") to break down target feedback and refine project planning.
Balancing EPQ with Academic and Life Commitments:
- EPQ tests real-world independent project management by requiring candidates to balance research alongside standard A-Level studies and external commitments.
- Candidates must actively prioritize work around real-time deadlines, including:
- University entrance examinations (e.g., UCAT preparation).
- UCAS Personal Statement drafting.
- November mock examinations.
- Personal and holiday commitments (e.g., planning around Christmas breaks or traveling home to Ukraine).
Report Structure, Word Count Distribution, and Writing Strategy
Word Count Allocation ( Total):
- Introduction: of total word count = .
- Conclusion: of total word count = .
- Main Body Paragraphs/Chapters: of total word count = .
- Primary Research Allocation: If primary research (e.g., digital marketing survey) is conducted, it requires its own dedicated section within the main body.
Sequential Project Execution Steps:
- Finalize Part A of Project Q to ensure an analytical focus.
- Complete initial literature reading and note-taking.
- Construct a hand-drawn or digital Mind Map to identify core themes.
- Map collected literature directly to planned report sections.
- Outline main body chapters across the .
- Establish explicit drafting milestones (e.g., writing in bullet or draft form every two weeks).
Format Misconceptions:
- The EPQ dissertation is a concise, tightly structured report (~10–15 formatted pages).
- This contrasts with international secondary school research requirements, such as Ukrainian school research papers which range from (Ukrainian literature) to (English language).
Analysis of EPQ Exemplar Projects and Grade Criteria
Top-Band Exemplar Analysis ( - Grade):
- Core Characteristics and Included Evidence:
- Initial topic proposal was concise and framed analytically as "a comparative study".
- Included a hand-drawn Mind Map demonstrating initial topic identification for AO1.
- Initial source list contained a few initial texts, which expanded into a final reference list spanning .
- Included presentation slides detailing the project journey ("why I decided to do one, my initial ideas").
- Contained Padlet logs, detailed project timelines, and a Gantt Chart for time management tracking.
- Primary Research Integration: Included a digital marketing survey with a blank sample questionnaire and screenshots of raw survey result graphs inserted into the log.
- Source Evaluation Grid: Comprehensive evaluation table analyzing individual source credibility.
- Final Report Length: Met the exact target (inclusive of direct citations).
Lower-Band Exemplar Analysis ( - Grade):
- AO1 Score: Received for project planning and organization.
- Assessor Comments & Weaknesses:
- Demonstrated basic organization, but provided minimal evidence of clear aims and objectives being set or monitored.
- Project plan contained minimal detail, and progress was not consistently tracked in the production log.
- Time management was loosely present, but lacked structured organizational discipline.
- Impact Factors: Obstacles encountered during execution, English as an Additional Language (EAL) phrasing barriers ("start against"), and STEM-focused students struggling with narrative report writing compared to mathematical tasks.
Source Evaluation, Credibility, and Reflection
Evaluating and Rejecting Non-Credible Sources:
- Discovering that an initial research source lacks credibility does not invalidate or harm the EPQ project.
- Candidates earn high-band evaluation marks by documenting source limitations and explaining explicitly why a source was rejected or used with qualifications.
- Critical reflection on source credibility provides direct evidence of higher-order evaluation skills.
Project Viability vs. Source Credibility:
- Initial project viability is established during the Candidate Proposal review.
- Encountering flawed sources during deep-dive research is expected and serves as a critical reflective milestone in the production log.
Supervisor Roles, One-to-One Sessions, and Taught Skills
Production Log Documentation & Physical Sign-Off:
- Project Q data is extracted using a crawl page function to produce a compiled Word document.
- Candidates can insert screenshots, spreadsheets, survey instruments, and source evaluation tables directly into the Word document.
- Both student and supervisor must physically sign the final printed Project Q log (e.g., signed off in May).
Taught Skills Curriculum ( Total):
- Taught skills cover research methodologies, ontologies, referencing standards, note-taking, line mapping, source evaluation grids, and presentation skills.
Supervision Mechanics:
- Individual one-to-one supervision sessions run for approximately .
- Sessions are needs-driven to address individual candidate progress (e.g., refining report structure, evaluating sources, or designing primary research).
- Proactive scheduling of extra one-to-one meetings directly correlates with achieving higher grade bands.
- Supervisory staff involved include Miss Julie, Ms. Amy, Mr. Robin, and Ms. Lorraine.