Chapter 5: The Project Development Process

Contract Documents and Design History

  • The Contract Documents are comprised of two major components:

    • Drawings
    • Project Manual
  • Historical evolution of design communication:

    • Architects began using drawings to communicate their design intent during the Renaissance.
    • During the Renaissance, architects transitioned to using drawings instead of models to better communicate their design intent.
  • Definition of CAD:

    • CAD stands for Computer-aided design.

Drawing Types and Standard Set Order

  • Order of drawings in a typical set of plans:

    1. Civil drawing
    2. Architectural
    3. Structural
    4. Mechanical
    5. Electrical
  • Orientations and definitions of view types:

    • Plan View: Represents a horizontal cut through the structure.
    • Section View: Represents a vertical cut through the structure.

The Project Manual and CSI MasterFormat

  • Four primary sections of a Project Manual:

    1. Bidding documents
    2. General Conditions
    3. Supplemental Conditions
    4. Technical Specifications
  • CSI MasterFormat organization:

    • CSI MasterFormat is broken down into 48–5048\text{--}50 divisions.
    • Building insulation is located under Division 07 - Thurman & Moisture protection.

Construction Contract Types and Financial Mechanics

  • Five basic types of Construction Contracts:

    1. Lump Sum
    2. Time/materials
    3. Unit price
    4. Cost-plus
    5. Guaranteed Maximum Price (GMP)
  • Provisions under a Guaranteed Maximum Price (GMP) Contract:

    • If the actual cost is less than the Guaranteed Maximum Price (GMC / GMP), the owner benefits from 100%100\% of the savings.
    • Exception: The owner does not receive the entirety of the savings if an arrangement is explicitly set in the contract to split the savings between the parties.