Chapter 5: The Project Development Process
Contract Documents and Design History
The Contract Documents are comprised of two major components:
- Drawings
- Project Manual
Historical evolution of design communication:
- Architects began using drawings to communicate their design intent during the Renaissance.
- During the Renaissance, architects transitioned to using drawings instead of models to better communicate their design intent.
Definition of CAD:
- CAD stands for Computer-aided design.
Drawing Types and Standard Set Order
Order of drawings in a typical set of plans:
- Civil drawing
- Architectural
- Structural
- Mechanical
- Electrical
Orientations and definitions of view types:
- Plan View: Represents a horizontal cut through the structure.
- Section View: Represents a vertical cut through the structure.
The Project Manual and CSI MasterFormat
Four primary sections of a Project Manual:
- Bidding documents
- General Conditions
- Supplemental Conditions
- Technical Specifications
CSI MasterFormat organization:
- CSI MasterFormat is broken down into divisions.
- Building insulation is located under Division 07 - Thurman & Moisture protection.
Construction Contract Types and Financial Mechanics
Five basic types of Construction Contracts:
- Lump Sum
- Time/materials
- Unit price
- Cost-plus
- Guaranteed Maximum Price (GMP)
Provisions under a Guaranteed Maximum Price (GMP) Contract:
- If the actual cost is less than the Guaranteed Maximum Price (GMC / GMP), the owner benefits from of the savings.
- Exception: The owner does not receive the entirety of the savings if an arrangement is explicitly set in the contract to split the savings between the parties.