Foundations: Functions and Loading
The primary function of a foundation in construction technology is to safely transfer the total load of a building to the ground. This total load is a combination of two distinct types of weight: live loads and dead loads. The dead load of a building constitutes the total weight of all permanent components that make up the structure. Conversely, the live load includes all movable weights that the building must support, such as people, furniture, and various types of equipment. To determine the total load required for foundation calculations, engineers must sum the live load and the dead load.
Foundations are the specific part of a building that is in direct contact with the ground. Their design must ensure they sustain and transmit loads to the soil in a way that limits settlement and prevents the failure of the underlying soil. The mechanics of this transmission involve loads moving through the mass concrete foundation at a specific angle of . As the subsoil beneath the foundation is compressed, it reacts by exerting an upward pressure to resist the foundation loading. If the foundation load exceeds the maximum passive pressure of the ground, also known as the bearing capacity, a downward movement of the foundation could occur.
Setting Out and Excavation Procedures
Before any excavation begins, a process known as setting out must take place. An ERF (a term for a piece of land) is demarcated using boundary pegs to define the limits of the site. To set out buildings accurately, professional tools such as a theodolite or a total station are employed. Despite the availability of high-tech surveying equipment, Pythagorean theory remains a popular and reliable method in the industry for ensuring layout accuracy. It is considered a standard best practice for all setting out to be checked by a second person to verify measurements and alignment before work proceeds.
Excavations are classified based on their intended purpose and the method of execution. The choice between manual and mechanical excavation often depends on the scale of the contract; on small contracts, excavations are typically carried out by hand, whereas on large-scale works, it is more economical to utilize mechanical earthmoving plant. There are five broad categories of excavation: soil strip (the removal of topsoil), reduced level excavations (used for leveling a sloping site), bulk excavation (used for openface or basement areas), trench excavations (specifically for strip footings), and hole or pit excavations (specifically for column bases).
Depth and Classification of Excavation
Excavation begins at a reduced ground level and continues down to the underside of the footing. A standard initial step in the process is the removal of topsoil to an average depth of . In technical drawings, elevations may be referenced against a natural ground level or a reduced ground level. The specific depth required for the excavation to reaching the footing is provided by a civil engineer through two primary methods: depth measurements relative to ground level or reduced levels, or measurements based on a TBM (Temporary Bench Mark).
Depth classification is critical for several logistical and safety reasons. Different depths result in varying levels of difficulty during the excavation process. As the depth increases, the danger to workers rises, often necessitating the implementation of temporary support systems. Furthermore, deeper excavations may require the use of more complicated machinery. Finally, established depth classifications enable contractors to price the work accurately during the bidding phase. Foundations are then excavated by plant or manual labor to the exact width and depth specified in the project plans.
Foundation Stability on Sloping Ground
When a building site is situated on sloping ground, the bottoms of the footings must be stepped. This design choice prevents the foundation itself from sloping, ensuring the structure remains level. Stepped foundations are applicable to both solid and cavity walls. There are specific geometric requirements for these steps to ensure structural integrity and modular consistency. Ideally, the depth of each step, denoted as , should be in multiples of brick courses. The maximum depth of a step must not be greater than the thickness of the foundation, denoted as .
Furthermore, the horizontal overlap of the foundation layers is critical. The minimum overlap, denoted as , must be at least twice the depth of the step () or equal to the foundation thickness , whichever value is greater. Additionally, the thickness of the foundation must be at least . These regulations ensure that the load is distributed correctly across the transitioning levels of the soil.
Excavation in Rock and Specialized Equipment
Excavating through rock presents different challenges than normal soil. Specialized machinery and techniques are required to penetrate and remove rock layers. One common method involves the use of a bulldozer equipped with a ripper to break up the rock surface. If the rock is too hard for standard mechanical removal, several other methods are employed to "get rid of rocks."
High-intensity methods include the use of explosives such as TNT, Dynamite, and Nitro. Chemical options, such as Chemical NITRO, can also be used to fracture rock without the same level of vibration as traditional explosives. For more controlled removal, an excavator or a jackhammer is used to break the rock into manageable pieces. In large-scale leveling of ground, such as open face excavations, the depth is often measured relative to sea level (). For example, a hill might be measured as being above sea level to determine the volume of material requiring removal.
Timbering: Planking and Strutting
Timbering, also referred to as planking and strutting, involves providing temporary support to the sides of excavations. These supports are mandatory when the depth of a trench in soft or loose soil exceeds . The primary purposes of timbering are to protect workers while they are inside the trench or hole and to keep the excavation open by acting as a temporary retaining wall against the surrounding soil. The specific type and amount of timbering needed depend on the soil type, the depth of the excavation, weather conditions, and the intended duration of the excavation.
There are two main types of planking and strutting: close and open. Close planking and strutting is used when the soil is particularly unstable; it involves completely covering the sides of the trench with short upright members called poling boards. These boards are typically in section and are placed in vertical pairs on either side of the cutting. They are held in place by horizontal wallings of strong wood, which are cross-strutted with ballies at a maximum spacing of . Open planking and strutting is used when the soil is more stable and does not require total coverage. In this method, the vertical boards (also wide and thick) are spaced apart to leave unsupported strips of soil with an average width of .
Leveling and Trench Preparation
To ensure that the concrete foundation is level and maintains a uniform thickness, level pegs are placed within the trenches. These pegs indicate the required thickness of the concrete pour. The process of setting level pegs involves several steps, starting with the establishment of a datum level. Survey equipment is then used to accurately drive pegs into the ground at regular intervals. Each peg is specifically marked to indicate the required excavation level and the specific depth for either cutting or filling. Standard color-coding on plans reflects different excavation types: orange indicates excavation for trenches (brickwork), while blue indicates excavation for holes or column bases (ground beams).
Structural Mechanics and Functional Requirements
Foundations must meet rigorous functional requirements to ensure building longevity and safety. They must transmit all dead, superimposed, and wind loads to the soil in a way that remains stable and durable. Stability is key; the foundation must prevent the building from overturning, sliding, or settling due to external forces like earthquakes, heavy winds, or the influence of adjacent structures. It must also show resistance to moisture, frost action, soil movement, and chemical attacks from substances like sulfates or chlorides in the ground.
Water management is another crucial function. Foundations must prevent water ingress into the structure and facilitate proper drainage to prevent the accumulation of water, which could weaken the foundation over time. Finally, the foundation design must be compatible with the superstructure, matching the building's load distribution requirements, material compatibility, and overall structural layout.
Categories of Foundations: Shallow and Deep
Foundations are broadly categorized into two main groups based on soil conditions, structural design, and load requirements: shallow foundations and deep foundations. Shallow foundations are used when the building load is relatively light or when the soil near the surface possesses sufficient bearing capacity. These foundations transfer loads to a point near the ground floor and include strip foundations (continuous footings under load-bearing walls), pad foundations (isolated footings for single columns), and raft or mat foundations (large slabs that support multiple columns or walls by distributing loads evenly across a large area).
Deep foundations are utilized when the soil near the surface is too weak to support the structure or when exceptionally heavy loads must be transferred to stronger, deeper soil layers. These transfer loads to a considerable distance below the ground floor. The primary types of deep foundations are pile foundations and pier foundations. Pile foundations consist of long, slender columns made of concrete, steel, or timber that are driven deep into the ground. Pier foundations are shallow to deep support columns frequently used for heavy structures like bridges. In specific cases like clay or made-up soils, pile foundations are spanned by shallow reinforced concrete beams upon which the walls are built, utilizing both compression and direct load transference.
Selection Factors and Backfilling Procedures
Choosing the correct foundation type involves primary and secondary factors. Primary factors include the subsurface soil and groundwater conditions, as well as structural requirements like building configuration and load. Secondary factors include construction methods (access and working space), environmental impacts (noise, traffic, and waste disposal), building codes, regulations, and the proximity of adjacent properties which might be impacted by the construction.
Once the foundation is in place, backfilling is required. The earth used for filling must be entirely free from roots, grass, shrubs, trees, rubbish, and rank vegetation. Filling must be performed in regular horizontal layers, with each layer not exceeding in depth. Any lumps of soil exceeding in any direction must be broken down. Each layer must be watered and consolidated using a steel rammer or a roller. For every third layer and the final top layer, an power roller must be used if specified. If the depth of filling exceeds , a vibratory power roller is required for consolidation. The contractor is responsible for ensuring the top and sides are neatly dressed and must fix any subsidence or shrinkage that occurs during the work.
Settlement and Soil Failure
Settlement is defined as the downward movement of a building's foundations into the soil due to the applied load. This can also be caused by changes in the soil's moisture content, which can cause shrinkage during dry periods. If the soil is overloaded to the point where the loaded area shears past the surrounding soil, it is known as plastic failure.
There are different degrees of settlement, but differential settlement (or relative settlement) is particularly dangerous. This occurs when the amount of settlement varies at different points underneath a single building. Differential settlement leads to the distortion of the structure, which, if excessive, results in damage to the building's fabric and finishes, and can potentially lead to the total failure of the structure. Filling materials for the site are classified as materials arising from the excavation (on-site material) or material obtained off-site (imported earth). On-site material must be sieved and treated to remove unsuitable items like timber, stones, and rubbish, a process that is often more time-consuming and expensive than importing clean material.