PURPOSE AND OBJECTIVES OF HIGH-RISE FIREFIGHTING (II-05)

  • Purpose (1.01): The primary purpose of this guideline is to direct Houston Fire Department (HFD) personnel toward a successful resolution of high-rise firefighting incidents, emphasizing the safety of both firefighters and civilians.

  • Objective 2.01: To establish and define the specific responsibilities of all HFD emergency response personnel who respond to or operate at high-rise incidents.

  • Objective 2.02: To provide a framework that allows the Incident Commander (IC) to maintain command, control, and coordination throughout the duration of a high-rise emergency.

KEY DEFINITIONS AND TERMINOLOGY

  • Access Control (3.01): The duty of maintaining a log of all crews entering the building, their intended destination, and their exit time. Responsibilities include distributing building-specific information and keys.

  • Blind Hoistway (3.02): A section of an elevator shaft devoid of hoistway doors, used to facilitate elevator service to specific floors above or below that section.

  • Crew Staging (3.03): A designated area for assigned crews to wait for specific tasks; typically located two floors below the fire floor.

  • Divisions (3.04): Geographical areas of operation assigned a supervisor to maintain a manageable span of control for the IC.

  • EMS Group (3.05): Responsibilities include triage, treatment, and transport of civilian casualties. Managed by a Senior EMS Supervisor, reporting to the IC until a Medical Branch is established.

  • Fire Department Connection (FDC) (3.06): An external connection used by the Fire Department to pump water into the building's sprinkler or standpipe systems.

  • Fire Attack Group (3.07): The initial tactical unit, consisting of at least one Ladder and two Engine companies, led by the Ladder Officer. Their role is to investigate, report conditions, and mitigate the fire from the fire floor.

  • Fire Service Mode Phase 1 (3.08): Recalls elevators to a designated floor and prepares them for Fire Department use.

  • Fire Service Mode Phase 2 (3.09): Enables in-car operation of the elevator via a key, allowing Fire Department personnel manual control.

  • Groups (3.10): Functional task assignments (e.g., Rescue Group) managed by a supervisor, which may span multiple geographical areas.

  • Lobby Control (3.11): Established by the first arriving Engine (supported by the Fourth Engine and Second District Chief). Responsibilities include access/elevator control, information gathering from panels, and situational assessment.

  • Medical Branch (3.12): Oversees all on-scene medical care, including the EMS Group (civilians) and the Rehab Group (firefighters). Directed by an EMS District Chief.

  • Pressure Regulating Valve (PRV) (3.13): Valves in standpipe systems designed to reduce outlet pressure, thereby lowering nozzle pressure.

  • Rapid Ascent Team (RAT) (3.14): Comprised of the Second and Third Ladder companies. Tasks include clearing stairwells, ensuring doors are closed but unlocked, and checking roof hatches (unlocked but closed) to facilitate stairwell pressurization.

  • Rehab Group (3.15): Dedicated to firefighter care. Includes an EMS Senior Supervisor, ALS and BLS units, and a Rehab Truck. Reports to the IC or Medical Branch.

  • Rescue Group (3.16): Manages the rescue and removal of occupants throughout the entire incident.

  • Resource Group (3.17): Transports equipment (tools, air bottles) from street level to the Crew Staging floor. The Officer coordinates with Lobby Control.

  • RIT Group (3.18): Supervises the Rapid Intervention Teams (RIT) and Technical Rescue crews focused on firefighter rescue.

  • Rapid Intervention Team (RIT) (3.19): A team of three or four members dedicated to rescuing lost, trapped, or endangered firefighters.

  • Stack Effect / Chimney Effect (3.20): Natural air movement where cool air enters lower levels and warm air rises. Reverse Stack Effect occurs in Houston’s warm climate when warm air enters upper levels and cool interior air flows down and out the bottom.

  • Stairwell Support Force (3.21): Personnel responsible for manually transporting equipment from the lobby to the Resource Group via stairwells in the event of elevator failure.

  • Systems Control Unit (3.22): Usually part of Lobby Control in large incidents. Manages building-specific systems (fire suppression, alarms, PA, HVAC, electrical, and elevators).

OPERATIONAL RESPONSIBILITIES AND PPE

  • Personal Electronic PPE (5.01): Members must manage personal electronics carefully. Radio volumes must be adjusted to prevent feedback during transmissions. T-PASS devices should be moved and reset regularly to avoid signal time-outs or false alarms.

  • Guideline Flexibility (5.02): High-rise fires are exceptionally challenging. While this guideline provides a standard, the IC is permitted to deviate from it to achieve the desired outcome.

  • Incident Priorities (6.01.A):

    1. Life Safety (Firefighters first, then Civilians).

    2. Incident Stabilization.

    3. Property Conservation.

  • Tactical Priorities (6.01.B): Rescue occupants, protect exposures, confine the fire, extinguish the fire, and conserve property.

RESCUE AND EVACUATION STRATEGIES

  • Rescue Definition (6.01.C): In high-rise structures, rescue constitutes either evacuation or protection-in-place.

  • Endangerment Levels:

    • Highest Risk: Occupants on or immediately above the fire floor, or those in smoke-filled stairwells.

    • Secondary Risk: Floors in the same ventilation zone as the fire (in buildings without smoke control).

  • Communication: Use the Public Address (PA) system for occupant instructions. The IC can relay info via OEC (dispatch) to 911911 call takers.

  • Stairwell Integrity: At least one stairwell must remain smoke-free. Doors must remain closed and never be propped open, as open doors exacerbate stack effects.

  • Elevator Rescue: Preferable to use elevators where the fire floor is in a blind hoistway.

TACTICAL GUIDELINES AND LOGISTICS

  • Fire Spread (6.01.D): Most fire spreads by "lapping" out windows or through curtain walls and poke-through penetrations.

  • Staffing Needs: It requires 66 firefighters to successfully stretch, charge, and move three lengths of 212"2 \frac{1}{2}" hose from a stairwell onto a fire floor.

  • Communication Discipline: High-rise incidents generate heavy radio traffic. Use concise language. Alternative tools include HFD cell phones, building plug-in phones (FF phones), and standard building telephones.

  • Arrival Procedures (6.01.H): First Engine, Ladder, and District Chief report by radio. Others use Mobile Data Terminals (MDT) to keep the radio channel clear. Level I staging is standard.

  • Tactical Channels: Staging should operate on a separate TAC channel from Operations.

INITIAL ASSIGNMENTS AND LOBBY CONTROL

  • First Arriving Engine (6.02.A): Acts as IC/Lobby Control initially. The Captain assumes the IC/Lobby/Access Control role. One firefighter is assigned as Elevator One, another as Elevator Two. The E/O establishes water supply.

  • Lobby Tasks:

    • Establish Fire Control Center (FCC) operations.

    • Check building personnel and the alarm panel (look at the first detector recorded to find the area of origin).

    • Access the depository box using 911911 keys or bolt cutters.

    • Relay critical sprinkler, PRV, and standpipe outlet data to incoming crews.

    • Gather and distribute high-rise surveys and floor plans (minimum 55 copies should be available).

    • Assign elevator operators and clear shafts for fire, smoke, or water entry.

FIRE ATTACK GROUP DUTIES (6.02.B)

  • Comprised of the First Ladder and Second/Third Engines.

  • Ascent: Survey the two floors below the fire for future Staging/Resource use and check elevator hoistways for hazards.

  • Water Supply: First and Second Engine E/Os team up for the standpipe/sprinkler FDC. The Third Engine E/O finds a secondary FDC.

  • Standpipe Connection: Connections must be made on the floor below the fire. Using door control or punching a hole in the stairwell wall can help prevent smoke from entering the stairwell.

  • RAT Group (6.03.A): Second and Third Ladders. Ensure the firefighting stairwell is clear. Unlocked and closed doors are critical. Deploy T-PASS repeaters.

ELEVATOR OPERATIONS (6.09)

  • Restrictions: Do not use if smoke, fire, or water is in the shaft. IC must approve use after clearance.

  • Procedure: Operations must be in Fire Service Mode. Fire Attack Group must have full PPE donned and air on (regulator unplugged) before ascending.

  • Emergency Stops: If the elevator fails to stop at the floor 55 levels below the fire, use the emergency stop switch or force the inner car doors open.

  • Freight Elevators: Not to be used in initial stages until verified safe.

WATER SUPPLY AND PRESSURE CALCULATIONS (7.01.I/J)

  • Pressure Regulating Valves (PRVs): Adjusted at the factory. Increasing inlet pressure rarely increases outlet pressure. Fog nozzles requiring 100 psi100\,psi often fail on PRVs; use 212"2 \frac{1}{2}" hose.

  • Calculations:

    • PRV Building: Pump 100 psi+6 psi100\,psi + 6\,psi per floor to the top of the standpipe zone.

    • Non-PRV Building: Pump 100 psi+6 psi100\,psi + 6\,psi per floor to the fire floor.

  • Fire Pumps: Modern pumps handle at least 750 gpm750\,gpm. Older ones may be only 250 gpm250\,gpm.

BUILDING SYSTEMS AND HAZARDS

  • Electrical Hazards (7.01.L): Lighting systems are 280 volts280\,volts. Power should be cut to the fire floor. Transformer vaults house up to 13,800 volts13,800\,volts; avoid water use here. Shunt trips may kill elevator power before sprinklers activate.

  • HVAC (7.01.D): Smoke spread is common through multi-level supply/return shafts once fans shut down. Modern buildings use automatic smoke removal systems to pressurize adjacent floors while vacuuming the fire floor.

  • Communications: Fire-phone jacks are usually found in elevator lobbies, near pull stations, and inside elevators. The system usually supports a maximum of 44 phones.

  • Gaseous Agents: Computer rooms often use FM-200. These systems extinguish by oxygen depletion. Warning lights and alarms indicate activation.

ADVANCED FIRE ATTACK PROCEDURES (8.00)

  • Equipment Bundle: 200 total feet200\,\text{total feet} of 212"2 \frac{1}{2}" hose, smooth bore nozzle, irons, and High Rise Bags (containing in-line gauges, pipe wrenches, spanners, bolt cutters, and door kits).

  • Search Lines: Ladder crews carry one 200-foot200\text{-foot} main search line and 25-foot25\text{-foot} retractable lines for each member.

  • Entry Control: Use door straps during searches. A strap on the strike indicates a primary search is underway; a doubled-over strap indicates the secondary search is complete.

  • Wind Driven Fires (8.10): High winds can push fire back into the floor if windows fail. Maintain stairwell door control. If conditions deteriorate, perform a tactical withdrawal and consider alternative tactics, such as breaching a wall from an adjacent apartment to attack the fire indirectly.