Cost Accounting Chapter 2

Cost Accounting Systems Overview

  • Major Costing Systems:
    • Job Order Costing (Chapters 2 and 3): Used when distinct, customized products or services are produced.
    • Process Costing (Chapter 4): Used when continuous, homogeneous goods are produced.
    • Activity-Based Costing (ABC) (Chapter 7): A refined costing method assigning overhead based on activities performed.
  • Criteria for Job Order Costing:
    • Multiple Products: Many different products or services are produced within the same operating period inside a single facility.
    • Manufactured to Order: Goods and services are produced explicitly to customer specifications rather than mass-produced for stock.
    • Unique Nature: Each job or unit possesses unique features, designs, or requirements (the defining keyword for job order costing is unique).
  • Real-World Applications of Job Order Costing:
    • Aircraft Manufacturing: Facilities producing airplanes tailored to specific commercial airline specifications.
    • Large-Scale Construction: Custom homebuilders constructing houses where each project varies in size, design, layout, color, and structural choices.
    • Printing and Shipping Services: Commercial printers producing specialized business cards, banners, or tailored shipping solutions.
    • Certified Public Accounting (CPA) Firms: Preparing individual or business tax returns.
      • Simple Client Example: A taxpayer with only a single W-2 form may require approximately 1.00 hour1.00\text{ hour} of preparation.
      • Complex Client Example: A taxpayer with small businesses, partnerships, and rental properties requires significantly more labor and specialized tracking.

Manufacturing Cost Classifications

  • Product Costs / Manufacturing Costs:
    • Direct Materials (DM): Raw materials that can be easily and cost-effectively traced directly to a specific individual job.
    • Direct Labor (DL): Worker labor hours and wages that can be physically and conveniently traced directly to a specific job.
    • Manufacturing Overhead (MOH): All manufacturing costs that cannot be easily or directly traced to a specific job.
      • Includes indirect materials, indirect labor, factory utilities, machine maintenance, and factory facility rent.
  • Traceability vs. Allocation:
    • Direct Materials (DM) and Direct Labor (DL) are direct costs; they are directly traced to individual job cost records (e.g., Job 1, Job 2).
    • Manufacturing Overhead (MOH) is an indirect cost; because it cannot be traced directly, it must be allocated across jobs using an allocation base.

Job Cost Sheet and Tracing Cost Components

  • Job Cost Sheet Definition: An accounting document used in manufacturing facilities to accumulate and trace all product costs (DM, DL, and MOH) assigned to a specific job.
  • Structure of a Job Cost Sheet:
    • Job Identification Number (e.g., Job 2B47).
    • Direct Materials section detailing exact items used, item numbers, quantities, and unit costs.
    • Direct Labor section detailing employee identification, start times, total hours logged, hourly wage rates, and calculated labor costs.
    • Manufacturing Overhead section tracking allocated overhead applied to the job.
  • Direct Material Tracing Example (Job 2B47):
    • Material Item 1: Part M46.
    • Material Item 2: Part G7 connection.
    • Total Direct Materials Cost logged on Job Cost Sheet: 6.60 dollars6.60\,\text{dollars}.
  • Direct Labor Tracing Example (Time Ticket Record):
    • Employee: Mary.
    • Shift Start Time: 07:12.
    • Log Allocation:
      • 5.00 hours5.00\,\text{hours} dedicated to Job 2B47 (yielding 90.00 dollars90.00\,\text{dollars} of direct labor cost assigned to Job 2B47).
      • 2.00 hours2.00\,\text{hours} dedicated to Job 2B50.
      • 1.00 hour1.00\,\text{hour} dedicated to general equipment and machine maintenance (classified as indirect labor / MOH).

Predetermined Overhead Rate (POHR)

  • Need for Allocation Bases:
    • Overhead cannot be easily or practically traced to specific individual jobs.
    • Manufacturing overhead consists of many diverse cost items (factory depreciation, supervisor salary, power, repairs).
    • Many manufacturing overhead costs are fixed (such as factory rent), remaining constant in total even when production output fluctuates throughout the period.
  • Definition of Allocation Base: A measure used to assign overhead costs to products and services (common allocation bases include direct labor hours, direct labor dollars, and machine hours).
  • Rationale for Using Estimates (POHR):
    • Actual overhead costs are unknown until the end of the accounting period.
    • Managers require immediate estimates of total job costs during the operating period for pricing, job control, and decision-making.
    • Financial Accounting is past-oriented (preparing financial statements for historical periods), whereas Cost/Managerial Accounting is present- and future-oriented.
  • Predetermined Overhead Rate Formula:     Predetermined Overhead Rate (POHR)=Estimated Total Manufacturing OverheadEstimated Total Allocation Base Units\text{Predetermined Overhead Rate (POHR)} = \frac{\text{Estimated Total Manufacturing Overhead}}{\text{Estimated Total Allocation Base Units}}

Methodological Steps for Computing POHR

  • Total Manufacturing Overhead Cost Model (Mixed Cost Equation):     Y=a+bXY = a + bX
    • YY = Estimated Total Manufacturing Overhead Cost
    • aa = Estimated Total Fixed Manufacturing Overhead Cost
    • bb = Estimated Variable Manufacturing Overhead Cost per unit of allocation base
    • XX = Estimated Total Units of Allocation Base
  • Four-Step Calculation Process:
    1. Determine the Allocation Base: Estimate the total quantity of the allocation base (XX) required for the upcoming period.
    2. Estimate Cost Components: Estimate the total fixed overhead cost (aa) and the variable overhead cost per unit of allocation base (bb).
    3. Calculate Total Estimated MOH: Solve for Y=a+bXY = a + bX.
    4. Compute Rate: Divide estimated total manufacturing overhead (YY) by estimated total allocation base units (XX) to obtain the POHR.

Applying Overhead to Jobs

  • Overhead Application Formula:     Applied Manufacturing Overhead=Actual Units of Allocation Base Incurred×Predetermined Overhead Rate\text{Applied Manufacturing Overhead} = \text{Actual Units of Allocation Base Incurred} \times \text{Predetermined Overhead Rate}
  • Critical Distinction (Estimate vs. Actual):
    • When computing the POHR, ONLY use estimated values for both total overhead and allocation base units.
    • When applying overhead to a specific job, multiply the POHR by the ACTUAL amount of the allocation base consumed by that specific job.
    • Warning: Never use actual allocation base totals or actual overhead costs in the denominator when calculating POHR at the beginning of the period.

Total Job Cost and Unit Product Cost Calculations

  • Total Manufacturing Cost Formula:     Total Job Cost=Direct Materials+Direct Labor+Applied Manufacturing Overhead\text{Total Job Cost} = \text{Direct Materials} + \text{Direct Labor} + \text{Applied Manufacturing Overhead}
  • Unit Product Cost Formula:     Unit Product Cost=Total Job CostTotal Units Completed in Job\text{Unit Product Cost} = \frac{\text{Total Job Cost}}{\text{Total Units Completed in Job}}

Comprehensive Step-by-Step Exercise Solutions

  • Exercise 1: Harris Patterns (POHR Calculation):

    • Given Data:
      • Allocation Base: Direct Labor Hours (DLH).
      • Estimated Fixed MOH: 94,000.00 dollars94,000.00\,\text{dollars}.
      • Variable MOH Rate (bb): 2.00 dollars per DLH2.00\,\text{dollars per DLH}.
      • Estimated Direct Labor Hours (XX): 20,000 DLH20,000\,\text{DLH}.
      • Actual Direct Labor Hours: 21,000 DLH21,000\,\text{DLH} (Do not use for POHR formula!).
    • Step 1: Compute Estimated Overhead (YY):         Y=a+bXY = a + bXY=94,000.00+(2.00×20,000)Y = 94,000.00 + (2.00 \times 20,000)Y=94,000.00+40,000.00=134,000.00 dollarsY = 94,000.00 + 40,000.00 = 134,000.00\,\text{dollars}
    • Step 2: Compute POHR:         POHR=134,000.00 dollars20,000 DLH=6.70 dollars per DLH\text{POHR} = \frac{134,000.00\,\text{dollars}}{20,000\,\text{DLH}} = 6.70\,\text{dollars per DLH}
  • Exercise 2: Overhead Application:

    • Given Data:
      • Predetermined Overhead Rate: 23.40 dollars per DLH23.40\,\text{dollars per DLH}.
      • Actual Allocation Base Incurred: 10,800 DLH10,800\,\text{DLH}.
    • Calculation:         Applied MOH=10,800 DLH×23.40 dollars per DLH=252,720.00 dollars\text{Applied MOH} = 10,800\,\text{DLH} \times 23.40\,\text{dollars per DLH} = 252,720.00\,\text{dollars}
  • Exercise 3: Complete Job and Unit Costing:

    • Given Data:
      • Estimated Total MOH (aa): 760.00 dollars760.00\,\text{dollars}.
      • Estimated Allocation Base: 20 DLH20\,\text{DLH}.
      • Direct Materials (DM) for Job: 200.00 dollars200.00\,\text{dollars}.
      • Direct Labor (DL) for Job: 150.00 dollars150.00\,\text{dollars}.
      • Actual Hours Incurred for Job: 10 DLH10\,\text{DLH}.
      • Units Completed: 2 units2\,\text{units}.
    • Step 1: Compute POHR:         POHR=760.00 dollars20 DLH=38.00 dollars per DLH\text{POHR} = \frac{760.00\,\text{dollars}}{20\,\text{DLH}} = 38.00\,\text{dollars per DLH}
    • Step 2: Compute Applied Overhead for Job:         Applied MOH=10 DLH×38.00 dollars per DLH=380.00 dollars\text{Applied MOH} = 10\,\text{DLH} \times 38.00\,\text{dollars per DLH} = 380.00\,\text{dollars}
    • Step 3: Compute Total Manufacturing Cost of Job:         Total Job Cost=200.00+150.00+380.00=730.00 dollars\text{Total Job Cost} = 200.00 + 150.00 + 380.00 = 730.00\,\text{dollars}
    • Step 4: Compute Unit Product Cost:         Unit Product Cost=730.00 dollars2 units=365.00 dollars per unit\text{Unit Product Cost} = \frac{730.00\,\text{dollars}}{2\,\text{units}} = 365.00\,\text{dollars per unit}
    • Secondary Standard Job Example (2 Units):
      • Total Job Cost: 2,390.00 dollars2,390.00\,\text{dollars}.
      • Total Units: 2 units2\,\text{units}.
      • Unit Product Cost=2,390.00 dollars2 units=1,195.00 dollars per unit\text{Unit Product Cost} = \frac{2,390.00\,\text{dollars}}{2\,\text{units}} = 1,195.00\,\text{dollars per unit}
  • Exercise 4: Advanced POHR and Costing Exercise:

    • Given Data:
      • Allocation Base: Direct Labor Hours.
      • Estimated Direct Labor Hours (XX): 80,000 DLH80,000\,\text{DLH}.
      • Estimated Fixed Overhead (aa): 680,000.00 dollars680,000.00\,\text{dollars}.
      • Variable Overhead Rate (bb): 0.50 dollars per DLH0.50\,\text{dollars per DLH}.
      • Job DM: 13.00 dollars13.00\,\text{dollars}.
    • Part 1: Compute POHR:         Y=a+bXY = a + bXY=680,000.00+(0.50×80,000)Y = 680,000.00 + (0.50 \times 80,000)Y=680,000.00+40,000.00=720,000.00 dollarsY = 680,000.00 + 40,000.00 = 720,000.00\,\text{dollars}POHR=720,000.00 dollars80,000 DLH=9.00 dollars per DLH\text{POHR} = \frac{720,000.00\,\text{dollars}}{80,000\,\text{DLH}} = 9.00\,\text{dollars per DLH}
    • Part 2: Total Manufacturing Cost Tracing:
      • Calculate total job cost by adding actual DM (13.00 dollars13.00\,\text{dollars}), actual DL, and applied overhead (9.00 dollars×actual DLH worked on job9.00\,\text{dollars} \times \text{actual DLH worked on job}).

Managerial Implications and Cost Drivers

  • Cost Drivers:
    • A Cost Driver is a factor (e.g., machine hours, direct labor hours, bed-days, computer time) that causes or drives the overhead cost to be incurred.
    • Choosing an appropriate cost driver as the allocation base is essential for accurate job costing.
  • Impact of Inaccurate Overhead Allocation:
    • Failure to select accurate cost drivers distorts overhead assignment.
    • Inaccurate job costs misinform management planning, project bidding, target pricing, and operational decision-making.
  • Examination Best Practices:
    • Always display clear, step-by-step mathematical calculations for all calculations.
    • Showing full derivation steps permits partial credit award if an final arithmetic error occurs.