Provision - A liability of uncertain timing or amount.
Contingent Liability - A possible obligation whose existence will be confirmed only by the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the entity.
Contingent Asset - A possible asset whose existence will be confirmed only by the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the entity.
Present Obligation - A legal or constructive obligation that arises from a past event.
Obligating Event - A past event that creates a present obligation.
Constructive Obligation - An obligation that arises from an entity's actions, whether written or oral, that lead another party to reasonably believe that the entity will act in a particular way.
Probable Outflow of Resources Embodying Economic Benefits - An outflow of resources that is more likely than not to occur.
Reliable Estimate of the Obligation - An estimate that is sufficiently accurate to allow for a reasonable assessment of the amount of the obligation.
Expected Value - The probability-weighted average of all possible outcomes.
Best Estimate - The most likely amount to be required to settle the obligation.
Mid-Point - The average of the range of possible outcomes.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Discount Rate - The pre-tax rate used to discount the estimate of a provision to its present value.
Reimbursement Asset - An asset that is recognized when it is virtually certain that an entity will be reimbursed for the settlement amount of a provision.
Onerous Contract - A contract in which the costs of fulfilling the contract exceed the economic benefits expected to be derived from the contract.
Restructuring - A program that is planned and controlled by management, and materially changes either the scope of a business undertaken by an entity or the manner in which that business is conducted.
Binding Sale Agreement - A legally enforceable agreement to sell an operation.
Detailed Formal Plan - A plan that sets out the specific steps that will be taken to restructure an operation.
Direct Costs - Costs that are directly related to the restructuring and are not related to the ongoing activities of the entity.
Reconciliation - A statement that shows the beginning balance, additions, deductions, and ending balance of a provision.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Quasi-Contract - An obligation that arises from a situation where there is no formal contract but where the law implies a contract.
Established Pattern of Past Practice - A pattern of behavior that has been established over time.
Expected Value - The probability-weighted average of all possible outcomes.
Mid-Point Amount - The average of the range of possible outcomes.
Discounting - The process of reducing the estimate of a provision to its present value.
Unwinding of Discount - The increase in the carrying amount of a provision that results from the passage of time.
Change in Discount Rate - A change in the pre-tax rate used to discount the estimate of a provision to its present value.
Capitalized - Added to the cost of an asset.
Prospectively - Accounting for changes in provisions by accruing an additional amount or by reversing a previously recognized amount.
Impairment - A reduction in the value of an asset.
Least Net Cost of Exiting from the Contract - The lower of the cost of fulfilling the contract and any compensation or penalties arising from failure to fulfill the contract.
Sale of Operation - The disposal of a business or a part of a business.
Closure - The termination of an operation.
Reorganization - A fundamental change in the structure or operations of an entity.
Retraining - The process of providing training to employees to help them adapt to changes in the workplace.
Relocating - The process of moving employees to a new location.
Marketing - The process of promoting products or services.
Investment in New Systems and Distribution Networks - The purchase of new equipment or systems or the development of new distribution channels.
Board Decision - A decision made by the board of directors of an entity.
Detailed Plan - A plan that sets out the specific steps that will be taken to implement a restructuring.
Announced - Made public.
Affected - Those who will be impacted by the restructuring.
Direct Costs - Costs that are directly related to the restructuring.
Ongoing Activities - The normal operations of an entity.
Future Conduct of Its Business - The way in which an entity expects to operate in the future.
Class of Provision - A group of provisions that have similar characteristics.
Description - A written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions thatTerms and Definitions from PAS 37.pdf
Provision - A liability of uncertain timing or amount.
Contingent Liability - A possible obligation whose existence will be confirmed only by the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the entity.
Contingent Asset - A possible asset whose existence will be confirmed only by the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the entity.
Present Obligation - A legal or constructive obligation that arises from a past event.
Obligating Event - A past event that creates a present obligation.
Constructive Obligation - An obligation that arises from an entity's actions, whether written or oral, that lead another party to reasonably believe that the entity will act in a particular way.
Probable Outflow of Resources Embodying Economic Benefits - An outflow of resources that is more likely than not to occur.
Reliable Estimate of the Obligation - An estimate that is sufficiently accurate to allow for a reasonable assessment of the amount of the obligation.
Expected Value - The probability-weighted average of all possible outcomes.
Best Estimate - The most likely amount to be required to settle the obligation.
Mid-Point - The average of the range of possible outcomes.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Discount Rate - The pre-tax rate used to discount the estimate of a provision to its present value.
Reimbursement Asset - An asset that is recognized when it is virtually certain that an entity will be reimbursed for the settlement amount of a provision.
Onerous Contract - A contract in which the costs of fulfilling the contract exceed the economic benefits expected to be derived from the contract.
Restructuring - A program that is planned and controlled by management, and materially changes either the scope of a business undertaken by an entity or the manner in which that business is conducted.
Binding Sale Agreement - A legally enforceable agreement to sell an operation.
Detailed Formal Plan - A plan that sets out the specific steps that will be taken to restructure an operation.
Direct Costs - Costs that are directly related to the restructuring and are not related to the ongoing activities of the entity.
Reconciliation - A statement that shows the beginning balance, additions, deductions, and ending balance of a provision.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Quasi-Contract - An obligation that arises from a situation where there is no formal contract but where the law implies a contract.
Established Pattern of Past Practice - A pattern of behavior that has been established over time.
Expected Value - The probability-weighted average of all possible outcomes.
Mid-Point Amount - The average of the range of possible outcomes.
Discounting - The process of reducing the estimate of a provision to its present value.
Unwinding of Discount - The increase in the carrying amount of a provision that results from the passage of time.
Change in Discount Rate - A change in the pre-tax rate used to discount the estimate of a provision to its present value.
Capitalized - Added to the cost of an asset.
Prospectively - Accounting for changes in provisions by accruing an additional amount or by reversing a previously recognized amount.
Impairment - A reduction in the value of an asset.
Least Net Cost of Exiting from the Contract - The lower of the cost of fulfilling the contract and any compensation or penalties arising from failure to fulfill the contract.
Sale of Operation - The disposal of a business or a part of a business.
Closure - The termination of an operation.
Reorganization - A fundamental change in the structure or operations of an entity.
Retraining - The process of providing training to employees to help them adapt to changes in the workplace.
Relocating - The process of moving employees to a new location.
Marketing - The process of promoting products or services.
Investment in New Systems and Distribution Networks - The purchase of new equipment or systems or the development of new distribution channels.
Board Decision - A decision made by the board of directors of an entity.
Detailed Plan - A plan that sets out the specific steps that will be taken to implement a restructuring.
Announced - Made public.
Affected - Those who will be impacted by the restructuring.
Direct Costs - Costs that are directly related to the restructuring.
Ongoing Activities - The normal operations of an entity.
Future Conduct of Its Business - The way in which an entity expects to operate in the future.
Class of Provision - A group of provisions that have similar characteristics.
Description - A written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
Entity's Best Estimate - The most likely amount to be required to settle the obligation.
Expected Value of the Settlement Amount - The probability-weighted average of all possible outcomes.
Mid-point Amount of a Range of Estimates - The average of the range of possible outcomes.
Probability Weighted Average - The expected value of a variable, calculated by weighting each possible outcome by its probability of occurrence.
Risk Adjustment Factor - An adjustment to the estimate of a provision to reflect the uncertainty inherent in the estimate.
Pre-tax Discount Rate - The rate used to discount the estimate of a provision to its present value, before taking into account income tax.
Present Value - The value today of a future cash flow, discounted at a specified rate.
Unwinding of the Discount - The increase in the carrying amount of a provision that results from the passage of time.
Effect of a Change in the Discount Rate - The impact of a change in the pre-tax rate used to discount the estimate of a provision to its present value.
Charged Against the Provision - Used to settle the obligation that the provision was intended to cover.
Reversed - Removed from the financial statements.
Additional Provisions Recognized - New provisions that are recognized during the period.
Beginning Balance - The balance of the provision at the beginning of the period.
Ending Balance - The balance of the provision at the end of the period.
Comparative Information - Information that is presented for the current period and one or more prior periods.
Brief Description - A short written explanation of something.
Nature - The type of provision.
Timing - The expected date of settlement of the provision.
Uncertainties - The factors that make it difficult to estimate the amount of the provision.
Assumptions - The assumptions that have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
**Entity have been made in estimating the amount of the provision.
Reimbursement - The amount that the entity expects to be reimbursed for the settlement amount of the provision.
Multiple Choice - A type of question that requires the respondent to choose the best answer from a list of options.
Source of Constructive Obligation - A factor that creates a constructive obligation.
**Entity