Job Order and Warehouse Modules – Detailed Study Notes
Job Order and Warehouse Modules – Detailed Study Notes
Target focus for today
Understand the Job Order (JO) module and the Warehouse module and how they interact
Azure screen activity is being recorded; filters and workflows are demonstrated
JO filtering and listing basics
Filtering criteria for JO listings
JO code
Product
Customer
Geo types
Multiple JO types exist
Product code
Status of the JO
Type (internal vs external)
Design name (from product settings) connected to the product name inside the JO
Work type (whether it is a rework or not)
Estimated delivery date
Unload software enable/disable (toggle)
Filter by estimated delivery date
JO listing details (in the listings element)
JO code
JO type
Type (internal or external)
JO details: name, customer name, estimated delivery date
JO connections to Sales Order (SO)
SO is required when JO type is a normal JO
Buffer JO: SO is disabled; you select a customer and a product under the customer’s product tab (the product tab discussed last time as “Seeds” or similar)
Other common JO types include CB tape, PE; behavior similar with slitting and replacements
JO types and their SO relationships
Normal JO
Requires a linked SO
Buffer JO
No SO required; select customer, then a customer product
CB tape / PE JO categories
Similar flow to JO; include slitting and replacement considerations
Replacements (for canceled or partial JOs)
Replacement JO for canceled quantities or remaining quantities
Replacement JO can be created for cases where the original JO is canceled or partially completed
Replacement with no SO
Replacement for JOs that does not require an SO, similar flow to PE and B tape creation (customer chosen, product under customer chosen)
Replacement requests and buy flow
Replacement request process (first approval flow)
A JO that is first approved triggers the creation of a replacement JO
This is linked to a “purchase request head office” flow
Purchase request (PR) and Purchase Order (PO) linkage
Upon approval of a replacement request, a PO is created
The approver settings come from ACL-based approval metrics
Internal tagging and subcon types (contextual flow)
Internal vs external tagging determines where processing occurs
Subcontracting types:
In-house: processed within the single company from start to finish (one operation to the last operation; QC as needed)
Full subcon: processing may occur outside the system or within a sister company (more complex)
Semi subcon: operations run internally, with selective external steps
Subcon flow affects how JO operations are scheduled and how PO/PR flow is managed
JO–PE flow, MKM, and lamination details
JOPE (JO + PE) flow on selecting an SO
Product name loads automatically when an SO is selected; product name can be a dropdown if multiple products exist for one SO
Upon selecting the product, MKM is auto-loaded and all required operations (RM, FG) are loaded
MKM is sourced from SO planning
PE JO-PE workflow (lamination-related)
Lamination steps: Lamination can be first, second, or third pass
Lamination is internal (internal red) and involves creating a separate JO and connecting to the main JO
Lamination sequencing: Lamination PERM lamination; the lamination steps are managed within the JO flow
R&D tagging
R&D JO tagging for research JO or trial JO
Normal approval process with approvers based on ACL approval metrics
General JO flow when PE is involved
Upon selecting PE, internal/in-house flow is used; bond-pack handling may occur; often PE involves a single operation (e.g., blowing)
Save action triggers the approval workflow and automatic second approval for certain customers (e.g., internal PE JO orders)
Approval workflow and production progression
Approval stages
First approval
Second approval (automatic in some cases for internal customers)
After approvals, the JO can proceed to production or be copied to another JO/GO request
Production progression
When JO proceeds to production, JO status shifts from Second Approved to Work In Progress (WIP)
An entry is auto-created (with a transaction code) for the first operation
GO request and JO monitoring
A GO request may be created for subsequent full subcon processing
JO monitoring can show limited data depending on the stage and the request
Material planning, MKM, and BOM-driven operations
MKM and SO planning
MKM data is pulled from SO planning and drives the JO-PE operation mapping
BOM and operation loading
Load BOM for RM: stock requests pull in BOM components
If a material has variants, there is a parent-variant relationship and issuance can be to the parent or to a specific variant
BOM outs drive how many outputs can be produced at a given operation
RM and FG stock management, stock requests, and warehouse issues
RM stock requests (parent RM flow)
Start from a JO/operation; select the operation for issue (e.g., printing)
Load BOM and current stock on hand
Approve stock request; then issue to warehouse
Issue varieties and variant handling
Materials can have variants (parent/variant) and the system decides whether to issue the parent or a variant
WIP and operational flow
After RM issue, WIP entries are created for subsequent operations (e.g., rewinding, lamination, processing)
Machine and operator settings per operation
Operation settings include operators, machines, and per-machine operation mappings
Each machine has its own operation availability and the ability to assign operators and machines
QC per operation and validation rules
QC criteria are defined per operation and per operator
QC criteria import/export capabilities exist
Resulting QA data feed into subsequent process steps
Detailed production steps: printing, rewinding, lamination, and transfer
Printing and rewinding workflow
Printing operation: define date start, date end, target production planning date, and waste allowances
Rewinding: plan output with maximum KM outputs, waste allowances, and target times
Lamination flow
Lamination steps occur after rewinding in some lines; lamination passes may be 1st, 2nd, or 3rd
The flow includes setting up outputs, waste, and transfer to next operation
Transfer to next operation
When all preconditions are met, transfer output to the next operation (printing, rewinding, lamination)
Transfer and WIP updates
Transferring updates WIP entries; the JO monitoring tracks status through operations
Subcontracting (subcon) processing in JO and PR/PO cycles
Subcon flow for JO operations
Subcon button creates WIP entries for subcon operations
WIP entries are tagged as subcon
For subcon processing, a separate purchase request (PR) and possibly PO are generated
PR and PO handling for subcon
Approvers apply toPurchase Request; after PR approval, a PO is created
PO entries have trade type (e.g., trader) and include last operation quantities
The system may require balancing across multiple PRs/POs for subcon processing
Receiving subcon goods
Upon PO creation, a RR (receiving) process may occur with FG/RM specifics and operator assignment
RR entries include conversion data (e.g., units, KMS to rolls to KGS to pieces)
Handling partial quantities
If partial quantities are received, remaining quantities trigger additional PR/PO flows or backfills
Returns, backlog, and post-delivery handling
Backlog and returns handling
Backlog RM and backlog FG are used to manage returns from WIP or deliveries
Returns may involve selecting the type of return (damaged, hold, or good) and corresponding warehouses
Return workflow details
Return documentation includes a hard copy identifier (for internal tracking)
Returned items can be moved to backlog RM or backlog FG based on type
SO/JO creation from returns and target dates
When returns are processed, there may be updated SO or JO creation or adjustment of target delivery dates
Archiving and data hygiene
JO archiving and web archiving
JO archives exist for inactive JOs (fulfilled, canceled, closed, disapproved)
Web archives exist for finished or closed WIPs
PO and warehouse issue archiving
Archiving for POs and warehouse issuance is used to optimize page load times
Warehouse stock archive and filters
Warehouse stock view includes filters per warehouse, per product group, per trade type, per product name, per product type, per customer, or per internal RN
Date added and the concept of adding stock (receipts from manufacturing or RR) are tracked
Practical notes and takeaways
Production data is crucial for the system
Production data impacts sales orders and deliveries; it is used widely across modules
Customer-specific production dates
Production date planning is heavily customer-specific and tied to end dates and delivery planning
Next steps and planning
Target next week: Account planning
Scheduling: next target time around 4 PM
Quick reference: key acronyms and terms
JO: Job Order
SO: Sales Order
PR: Purchase Request
PO: Purchase Order
RM: Raw Materials
FG: Finished Goods
MKM: Master/Key Material (data used from SO planning)
ACL: Access Control List (approval metrics and routing)
WIP: Work In Progress
BOM: Bill of Materials
QE/QC: Quality Control
GO: Go/Go-Request (context-dependent in the workflow)
PE: Process Engineering/lamination-related JO type
Subcon: Subcontracting
Mathematical notes and conversion formulas
KM and roll conversion (example relationships mentioned in workflows)
1 KMS ≈ 1 roll ≈ 150 KGS ≈ 20{,}000 pieces
General conversion guidance used in planning and QC involves mapping KM to rolls and to downstream units
Maximum KMS roll output with allowance
Let Total ext{KMS} be the sum of outputs from the previous operation across all rolls, and N ext{rolls} be the number of rolls in the operation. Let ext{allowance} be an operational buffer (e.g., 0.25 for 25%). Then:
\text{max_KMS} = \frac{\text{Total_KMS}}{N_{\text{rolls}}} \times (1 + \text{allowance})Typical allowance observed: 25% (0.25); note that some cases mention a 20% (0.20) limit for higher volumes (e.g., when total exceeds certain thresholds)
Slitting output max based on BOM outs
If the preceding operation produces an output, the max for slitting can be computed as:
\text{max_slitting_output} = \text{output}_{\text{last_op}} \times \text{BOM_outs}BOM outs are defined in the BOM settings for the material
Example numerics (illustrative)
If Total_KMS = 149.98, N_{rolls} = 5, and allowance = 0.25, then
\text{max_KMS} = \frac{149.98}{5} \times (1 + 0.25) = 29.996 \times 1.25 \approx 37.50 KMS
Operational data mappings
For production planning, KM, rolls, KGS, and pieces are interconnected; explicit conversion values are used for planning and QA checks
Connections to earlier topics and real-world relevance
JO and SO linkage reinforces standard ERP practice: sales orders drive manufacturing work orders, ensuring traceability and planning alignment
Replacement and subcon flows reflect real-world manufacturing scenarios where partial shipments, cancellations, and external manufacturing are common
Archiving and data hygiene are crucial for performance in large ERP systems; archiving inactive records reduces page load times and improves search responsiveness
The use of ACL-based approvals ensures organizational governance and role-based access control in manufacturing workflows
Ethical, philosophical, and practical implications
Data integrity and traceability are essential for audits and compliance in manufacturing environments
Subcontracting introduces external dependencies; proper governance and visibility are required to prevent supply chain disruptions
Accurate production planning data influence customer commitments, cost control, and waste management
Automation of approvals and WIP creation reduces manual error but requires robust controls to prevent misrouting
Questions you might encounter on the exam
Explain how a normal JO differs from a buffer JO in terms of required data and SO linkage.
Describe the end-to-end flow from a PE JO through lamination passes to WIP creation and QA checks.
What is the purpose of a replacement request, and how does it lead to PRs/POs?
How does the system handle parent/variant materials during RM issuance in stock requests?
What is the role of MKM in JO flow, and how is it sourced?
How are backlog RM and backlog FG used in returns processing and how do they affect inventory planning?
What are the main considerations for archiving JO records, and how does this affect system performance?
If you want, I can turn these notes into a printable study sheet or tailor them to a specific section of your syllabus (e.g., focus more on MSCM/MKM, or on QC procedures). Also, I can extract a condensed checklist for a quick review before the exam.