BDM S7 - Predictive Demand Modeling and Dual Sourcing Optimization

Predictive Demand Modeling for Limited Edition Collections

  • Decision-Driven Forecasting Objective:

    • The primary objective of demand forecasting in an operational context is to support specific downstream inventory decisions rather than generating detached statistical estimates.

    • When sourcing from an offshore supplier (such as Ukraine), order placement occurs as a single upfront batch for the entire life cycle of the product collection.

    • Consequently, the dependent forecasting variable must be the total aggregate sales of the collection (Sales\text{Sales}), rather than daily sales. Forecasting daily sales introduces unnecessary day-to-day variance that does not align with a single lump-sum batch procurement decision.

    • If operations permitted continuous daily replenishments or micro-orders every two days, forecasting daily sales would be appropriate.

  • Linear Regression Model Specification:

    • Dependent Variable (YY): Total aggregate sales for a given Limited Edition Collection (LEC\text{LEC}).

    • Independent Variable 1 (X1X_1): Duration of the collection (Duration\text{Duration}), defined as the total number of days the item is available on the shelf. For the forthcoming item, LEC 24\text{LEC 24}, management fixed the duration at exactly 21 days21\,\text{days}.

    • Independent Variable 2 (X2X_2): Holiday indicator variable (Holiday\text{Holiday}), structured as a binary dummy variable (11 if the campaign takes place during a holiday season, 00 otherwise).

    • Linear Functional Form:         Sales=β0+β1(Duration)+β2(Holiday)+ϵ\text{Sales} = \beta_0 + \beta_1(\text{Duration}) + \beta_2(\text{Holiday}) + \epsilon

    • The model achieves an R2R^2 of approximately 0.680.68.

    • Baseline Forecast for LEC 24\text{LEC 24}:

      • Model inputs: Duration=21 days\text{Duration} = 21\,\text{days}, Holiday=0\text{Holiday} = 0.

      • Point estimate for expected demand: μ=312 units\mu = 312\,\text{units}.

      • Standard error of the regression estimate: σ=112 units\sigma = 112\,\text{units}.

  • Data Aggregation and Categorization:

    • Historical sales records comprise collections labeled LEC 1\text{LEC 1} through LEC 23\text{LEC 23}.

    • Identifiers (LEC ID\text{LEC ID}) represent arbitrary nominal labels with no intrinsic numerical order or explanatory value.

    • Holiday periods in the historical dataset include LEC 8\text{LEC 8} (running from April to May), as well as LEC 17\text{LEC 17}, LEC 18\text{LEC 18}, and LEC 19\text{LEC 19} (running from December 10 to January 5). These collections experienced substantial demand spikes.

  • Methodological Treatment of Outliers:

    • Data points representing holiday surges should not be arbitrarily discarded as noise or random flukes.

    • Retaining these observations and incorporating an indicator variable (Holiday\text{Holiday}) allows the regression to mathematically isolate and quantify the seasonal boost via the regression coefficient and associated p-values.

    • Excluding extreme observations is acceptable only if operational policy explicitly dictates that the business will not plan capacity around rare events (e.g., a one-in-a-million event).

Model Diagnostics and Log-Linear Transformations

  • Residual Diagnostics and Violation of Homoskedasticity:

    • A primary assumption of ordinary least squares (OLS) regression is homoskedasticity: residual error (ei=Yi−Y^ie_i = Y_i - \hat{Y}_i) must display constant variance across all levels of the fitted values (Y^\hat{Y}).

    • Residual-versus-fitted diagnostic plots for the linear model reveal severe pattern violations:

      • For lower-selling collections (Y^\hat{Y} around the low end), average residuals cluster around 8080 to 8787.

      • For higher-selling collections, average residuals escalate to approximately 130130.

    • This systematic fan-out indicates that residual behavior depends on the scale of sales, violating constant error variance assumptions and producing negative residual skew.

  • Natural Logarithmic Transformation:

    • To correct for non-linearity and heteroskedasticity, the dependent variable is transformed using the natural logarithm:         ln⁡(Sales)=α0+α1(Duration)+α2(Holiday)+ϵ\ln(\text{Sales}) = \alpha_0 + \alpha_1(\text{Duration}) + \alpha_2(\text{Holiday}) + \epsilon

    • Predictions generated in log space are back-transformed into regular unit sales using the natural exponential function:         Sales^=exp⁡(ln⁡(Sales)^)\widehat{\text{Sales}} = \exp(\widehat{\ln(\text{Sales})})

    • Evaluating Goodness of Fit:

      • In the log-transformed specification, the direct R2R^2 evaluates variance explained in ln⁡(Sales)\ln(\text{Sales}) (e.g., R2=0.67R^2 = 0.67, adjusted R2=0.63R^2 = 0.63).

      • Directly comparing R2R^2 values between linear and log-linear models is invalid unless the log model predictions are exponentiated back to the original unit scale before computing the sum of squared errors.

Dual Sourcing Optimization: Offshore Outsourcing vs. Local Near-Sourcing

  • Cost and Operational Parameters:

    • Offshore Sourcing (Ukraine):

      • Unit procurement cost: CUkraine=65 USDC_{\text{Ukraine}} = 65\,\text{USD}.

      • Lead time: 3 weeks3\,\text{weeks}.

      • Operational constraint: Orders must be placed entirely upfront as a single batch; mid-campaign replenishment is impossible.

      • Retail selling price: P=105 USDP = 105\,\text{USD}.

      • Salvage value: V=0 USDV = 0\,\text{USD} (unsold inventory retains zero residual value after the 21-day window).

    • Near-Sourcing (Local Workshop):

      • Unit procurement cost: CLocal=95 USDC_{\text{Local}} = 95\,\text{USD} (30 USD30\,\text{USD} premium per unit relative to offshore).

      • Lead time: Zero production possible during Week 1 (Days 1 to 7). Production commences exclusively in Weeks 2 and 3 (Days 8 to 21).

      • Production capacity: Capped at 12 units/day12\,\text{units/day}.

      • Total available capacity over the 14-day window:             14 days×12 units/day=168 units14\,\text{days} \times 12\,\text{units/day} = 168\,\text{units}

  • Mathematical Formulation of the Hybrid Sourcing Policy:

    • Let QQ represent the advance order quantity purchased from Ukraine.

    • Let DD denote the stochastic aggregate market demand for the collection (D∼N(μ=312,σ=112)D \sim N(\mu = 312, \sigma = 112)).

    • Sales fulfilled exclusively through offshore inventory:         SUkraine=min⁡(Q,D)S_{\text{Ukraine}} = \min(Q, D)

    • Unfulfilled demand exceeding the Ukraine order quantity:         Unmet Demand=max⁡(0,D−Q)\text{Unmet Demand} = \max(0, D - Q)

    • Order quantity requested from the local workshop (QLocalQ_{\text{Local}}), constrained by maximum capacity:         QLocal=min⁡(168,max⁡(0,D−Q))Q_{\text{Local}} = \min(168, \max(0, D - Q))

    • Total effective product supply available to satisfy demand:         SupplyTotal=Q+QLocal\text{Supply}_{\text{Total}} = Q + Q_{\text{Local}}

    • Total units sold:         Total Sales=min⁡(D,SupplyTotal)=min⁡(D,Q+min⁡(168,max⁡(0,D−Q)))\text{Total Sales} = \min(D, \text{Supply}_{\text{Total}}) = \min(D, Q + \min(168, \max(0, D - Q)))

    • Total net profit formulation:         Profit=105×Total Sales−65×Q−95×QLocal\text{Profit} = 105 \times \text{Total Sales} - 65 \times Q - 95 \times Q_{\text{Local}}

  • Comparative Optimization Performance:

    • Offshore-Only Policy:

      • Optimal order quantity: Q∗≈320 unitsQ^* \approx 320\,\text{units}.

      • Stockout probability: 8.0%8.0\%.

    • Hybrid Sourcing Policy:

      • Optimal offshore order quantity: Q∗≈274 unitsQ^* \approx 274\,\text{units} (a reduction of 46 units46\,\text{units} from Ukraine).

      • Expected profit is strictly higher across all order volumes due to the operational flexibility provided by the local option.

      • Because the selling price (105 USD105\,\text{USD}) exceeds the local cost (95 USD95\,\text{USD}), every unit produced locally yields a positive contribution margin of 10 USD10\,\text{USD}.

      • Stockout probability drops significantly from 8.0%8.0\% down to 5.5%5.5\%.

    • Modeling Simplification Assumption:

      • The model treats local capacity as an aggregate pool of 168 units168\,\text{units} across the final 14 days.

      • It abstracts away daily volatility where single-day demand spikes might exceed the daily ceiling of 12 units/day12\,\text{units/day}.

Supply Chain Frameworks: Physical Function vs. Market Mediation

  • The Two Fundamental Functions of a Supply Chain:

    • Physical Function:

      • Encompasses physical production, transformation, packaging, freight, delivery, and storage.

      • Traditional objective: Minimize total production and logistical costs per unit.

    • Market Mediation Function:

      • Ensures that the variety and volume of products delivered match market demand across locations and time.

      • Associated costs: Opportunity costs of shortages/stockouts (lost revenue, customer dissatisfaction) and inventory obsolescence costs (deep discounts, zero salvage disposal).

  • Impact of Uncertainty on Supply Chain Design:

    • Under zero demand uncertainty, market mediation costs are zero; optimal strategy focuses entirely on minimizing physical function costs.

    • Under high demand volatility, focusing exclusively on physical cost minimization introduces systemic fragility.

    • Offshore outsourcing optimizes physical costs (65 USD65\,\text{USD} vs. 95 USD95\,\text{USD}) but incurs high market mediation costs due to rigid order commitments.

    • Near-sourcing provides dynamic market mediation, serving as an operational buffer against forecast errors.

    • The COVID-19 pandemic demonstrated the vulnerability of supply chains built solely on physical cost optimization, as market mediation costs escalated dramatically when disruptions occurred.

Questions and Discussion

  • Salveen:

    • Question: How do minimum order quantities (MOQs) impact the optimization model if total historical orders are unknown, and how do past supply constraints affect observed sales data?

    • Response: In an optimization model, an MOQ is addressed by enforcing a lower bound threshold. If the unconstrained optimal quantity exceeds the threshold, the constraint is non-binding; otherwise, the firm evaluates whether producing at the minimum threshold is profitable. Furthermore, observed historical sales are often censored or filtered by past order quantities or backroom fulfillment bottlenecks. While advanced statistical techniques exist to estimate latent unconstrained demand from censored data, historical sales can be treated as direct proxies for demand in this baseline simulation.

  • Amali:

    • Question: The sales duration differs across collections. What is the shelf life input for LEC 24\text{LEC 24}?

    • Response: Management established that LEC 24\text{LEC 24} will be sold for exactly 21 days21\,\text{days}. This value serves as a deterministic independent input (Duration=21\text{Duration} = 21) in the forecasting model.

  • Asa:

    • Question: In attempting an uncertainty prediction, residual standard error emerged at 5.6 shirts/day5.6\,\text{shirts/day}, leading to an uncertainty calculation of 6.2 shirts/day6.2\,\text{shirts/day}, which multiplied across 21 days21\,\text{days} yields 130.9 shirts130.9\,\text{shirts}. Is this appropriate using a 90%90\% confidence multiplier when collection-level errors may not be independent?

    • Response: Calculating daily standard errors and multiplying linearly across 21 days21\,\text{days} assumes daily independence and creates compounding aggregation issues. Sourcing models require estimating error directly at the aggregate collection level to support the total procurement batch.

  • Swati:

    • Question: What happens to explanatory power when variables are added sequentially (such as duration, holiday flag, and trend) if the adjusted R2R^2 does not increase significantly?

    • Response: If adding trend variables or separate seasonal counters fails to improve adjusted R2R^2, the data does not support those additional dimensions. Model parsimony should be maintained by retaining only statistically justified predictors (duration and holiday indicators).

  • Scott:

    • Question: Presentation of an aggregated spreadsheet model where duration of sales and holiday flags serve as independent variables predicting total shirts sold.

    • Response: This aggregation correctly structures the dependent variable to match the single-batch ordering decision.

  • Grant:

    • Question: Can the substantial sales spike on the initial launch day be isolated or discarded as a "warm-up period," analogous to discrete-event simulations?

    • Response: In discrete-event simulation (e.g., modeling hospital emergency room arrivals), initial phases are discarded as warm-up periods to eliminate transient initialization bias from an artificially empty system. In contrast, Day 1 retail sales spikes are real customer demand. Day 1 sales carry predictive signals regarding the total success of a collection and should be modeled using indicator variables or correlation structures rather than deleted.

  • Rachel:

    • Question: In a professional business environment, should an analyst present two separate models to a founder—one with outliers removed and one with outliers included?

    • Response: Presenting both models is sound, but labeling data points as "outliers" implies they are meaningless flukes. Instead, explain that specific collections experienced demand shifts driven by annual calendar events. Field operators possess ground-level insights that contextualize anomalies, which can then be properly parameterized in the model.

  • JC:

    • Question: If LEC 24\text{LEC 24} launches in March, and historical holiday spikes occurred strictly between October and January, can holiday indicators be ignored entirely for this launch?

    • Response: For LEC 24\text{LEC 24}, the holiday indicator variable is set to 00 (Holiday=0\text{Holiday} = 0). However, the holiday variable must remain in the regression training dataset so the model accurately parses the baseline effect of duration from the holiday demand lift.

  • Anita:

    • Question: Why do negative residual patterns emerge when running linear models on collection sales?

    • Response: Negative residuals occur because linear models force a straight-line fit onto inherently non-linear growth dynamics. Moving to a natural log transformation (ln⁡(Sales)\ln(\text{Sales})) accommodates the curvature and resolves residual compression at lower sales volumes.

  • Vikas:

    • Question: The local shop enforces a daily cap of 12 shirts/day12\,\text{shirts/day}. How does the model account for this constraint?

    • Response: The optimization captures capacity in the aggregate (14 days×12 units/day=168 units14\,\text{days} \times 12\,\text{units/day} = 168\,\text{units}). The model assumes demand during Weeks 2 and 3 is sufficiently distributed across the 14 days, abstracting away single-day demand spikes that might exceed the daily rate of 12 units12\,\text{units}.

  • Dialogue on Quality Control in Multi-Sourcing:

    • Student Inquiry: How can product quality and apparel sizing remain consistent between offshore factories and domestic workshops?

    • Industry Response: Manufacturing engineering handles distributed supply networks via two standards: exact engineering specifications (precise dimensional drawings and material tolerances) and vendor qualification (auditing facilities to ensure machinery and workflows reliably produce identical physical outputs).

  • Cohort Study Break Observations:

    • Local Doughnut Vendor Sourcing Parallel: Anecdote regarding a store owner sourcing specialty "Super Donuts" (packaged in boxes of 50 units50\,\text{units}). High demand volatility caused frequent stockouts, and relying on a single supplier producing fixed volumes caused operational bottlenecks, highlighting the necessity of multi-supplier networks.

    • Travel and Administrative Logistics: Cohort travel details for executive residency in Toronto, staying at the Delta Toronto hotel, with arrival logistics via airport rail transit (15 minutes15\,\text{minutes} train ride to downtown) and sessions commencing at 8:00 AM8:00\,\text{AM} Sunday.