Introduction to Project Management
Construction Company Organization
Organizational Structure: Refers to the arrangement of job roles and the operational and reporting relationships within and between those roles.
Corporate Hierarchy: Standard structures align executive management (such as a General Manager) above functional divisions including Preconstruction, Operations, Human Resources, Finance, and Safety.

Project Communication & Stakeholder Management
Key Communication Elements:
Planning: Determining stakeholder information and communication needs.
Information Distribution: Making required information available in a timely manner.
Performance Reporting: Collecting and disseminating status reports and performance data.
Administrative Closure: Formalizing project or phase completion.
Industry Communication Links: Involves multi-directional interaction between the Client Side, Contracting Side, Financiers, and Regulators.

Ethical Conduct in Project Management
Principles of Ethical Behavior:
Prepare honest, ethical bids and negotiate fairly.
Comply with regulations and follow established industry best practices.
Protect client and vendor confidential and proprietary information.
Practical Ethical Considerations:
Schedule & Administrative Constraints: Conflicts and restrictive procedures must be managed so client service is not compromised.
Concurrent Projects: Project managers remain ethically bound to deliver all contracted services regardless of internal competing priorities.
Staffing & Resources: Responsible for assigning properly qualified personnel to tasks.
Cost Reduction & Conflicts: Expediting strategies and personality clashes must be handled without introducing conflicts of interest or violating confidentiality.
Project Definition & Primary Phases
Project Definition: A unique endeavor of limited duration (months to years) designed to construct, renovate, or refurbish a building, structure, or infrastructure until it is completed and operational.
Three Major Project Phases:

Development Phase: Land acquisition, feasibility studies, permits, conceptual drawings/models, project budget/ROI, financing, zoning, building codes, environmental concerns, site access, and landscape requirements.
Design Phase: Cost estimates, preliminary drawings and specifications, marketing programs, government compliance, bid documents, and contractor selection.
Construction Phase: Direct physical execution and field operations.
Construction Project Lifecycle & Flow

1. Bidding:
Begins with quantity takeoffs based on owner drawings and specifications.
Bids gathered from suppliers and subcontractors; overhead and profit added to direct costs.
Award is not strictly guaranteed to the lowest or best-qualified bidder.
2. Pre-Construction Activities:
Awarding subcontracts and purchase orders.
Developing project schedules and reviewing estimates.
Determining manpower/equipment requirements, establishing cost controls, and planning site mobilization.
3. Construction Phase:
Pre-construction conference conducted with subcontractors, vendors, and suppliers to distribute project materials.
Mandatory inspections performed by local government agencies.
4. Project Closeout Documents:
Completed punch list.
Guarantees and warranties.
Operation and maintenance (O&M) manuals.
Release of liens.
Record (as-built) drawings and other contractually specified closeout items.