Meeting Notes
Attendees
Natalia
Ghosli
Sai
Kurman
Christine
Technical Setup
Natalia will take notes during the session.
Ghosli asked if screen sharing is visible and if it can be enlarged for better viewing.
Agenda Overview
The group discussed the status of the RegIntel items in regards to tool upgrades and documentation updates.
The conversation focused on how to organize and categorize these updates effectively in their system (Excel and Power BI).
Key Discussion Points
Tool Upgrade Requirements
There was a discussion about adding a new column for tool upgrades within the updates list in the Excel sheet. This was described as:
Purpose: To identify if a tool upgrade is required for specific updates.
Suggested Dropdown Options: Yes, No, Not Applicable.
Location: Proposed to place this column after the documentation update column.
Example mentioned: TRS Viewer 5.4 went live supporting Australia DTD 3.2. A tool upgrade is necessary for this item.
Distinguishing Between Upgrades and Documentation Updates
Ghosli emphasized the importance of separating tool upgrades from documentation updates to track their statuses independently.
**Proposed Changes: **
Two additional columns suggested for tracking:
Target completion date for tool upgrades.
Status of tool upgrades (Completed, Pending).
Facilitate both documentation update statuses alongside tool upgrade statuses.
Actions within Excel
Discussed how to indicate completion status and track progress:
Columns being updated:
Adding a 'System and Tool Upgrade Status' column, and ensuring both tool updates and documentation updates have distinct target completion dates.
Proposed Column Names:
J: Status of Documentation Update.
K: Documentation Target Completion Date.
L: Status of Tool Upgrade.
M: Tool Upgrade Target Completion Date.
Power BI Integration and Reporting
The challenge of tracking the actual completion dates versus target completion dates was addressed:
Example situation: If an item has a target completion date of November 10, it must be tracked whether it completed early or late.
Use of Power BI:
Power BI will indicate completed items and allow filtering to determine pending workloads.
Other aspects of reporting discussed included:
Outstanding items requiring action or those that may not impact reporting criteria.
General Tracker Management
Ghosli suggested maintaining trackers in their current format until a thorough re-evaluation of their processes occurs.
Christine suggested leveraging a grade tracker for updates relevant to job aids or other documentation separate from the RegIntel item tracking.
Tracking mechanisms would include:
Status Updates for job aids without overwhelming the current tracking system.
Ensuring transparency on if requirements have been conveyed to teams for action (could include using dropdowns indicating status).
Next Steps
Natalia will be responsible for updating the Excel sheet with the discussed changes.
The group will share updates on how the changes are reflected in Power BI.
Explore with Red Tech the frequency of updates and ensure progress is monitored using the new columns implemented in Excel with clear visibility in Power BI.
Follow-up on any changes needed based on feedback from regions or stakeholders involved.
Action Items
Natalia to reach out to SMEs regarding pending items.
Confirm with Red Tech about the next refresh schedule for the Power BI report (currently at 25th September).
Continue monitoring and reporting changes based on discussed strategies.
Meeting Closure
The meeting concluded with appreciation for everyone's contributions. Next steps were affirmed, and further discussions will occur as updates are received.
End of meeting acknowledgments.