Safetyelectricshocks (unit301)

Fundamentals of Electric Shock

  • Definition: An electric shock is an unpleasant sensation produced by the response of nerves to the passage of electric current through the body.

  • Circuit Requirement: Shock only occurs when becoming part of a complete circuit between a source and earth ("No circuit - No shock").

  • Influencing Factors: Physiological impact depends on age, sex, general health condition, and moisture levels in the immediate environment.

  • Primary Physiological Dangers: Causes irregular cardiac rhythms (heart failure) and contact burns.

Physiological Thresholds of Current Flow

  • 0.5 mA−2 mA0.5\,mA - 2\,mA (Threshold of Perception): The minimal current level detectable by human senses.

  • 2 mA−10 mA2\,mA - 10\,mA (Pain / Let-Go Level): Painful sensation that intensifies with current; voluntary muscle release remains possible up to approximately 10 mA10\,mA.

  • 10 mA−25 mA10\,mA - 25\,mA (Hold-On Level): Involuntary muscular cramping preventing release of live conductors; accompanied by increased blood pressure and breathing difficulties due to lung muscle contraction.

  • 25 mA−50 mA25\,mA - 50\,mA (Throwing Level): Severe muscular contractions capable of throwing the body and fracturing bones; marked by high blood pressure and potential loss of consciousness from cardiac or respiratory failure.

  • 50 mA50\,mA (Lower Lethal Level): Fatal threshold causing severe contact burns and lethal heart failure (current level is less than what is required to power a laptop).

Emergency Response to Electric Shock

  • Direct Contact: Do not touch the casualty directly.

  • Alarm: Shout immediately for assistance.

  • De-energize: Turn off the power supply at the source whenever possible.

  • Physical Separation: If power cannot be isolated, pull the victim clear using non-conductive insulating items (such as a dry broom, scarf, wooden stick, or newspaper).

  • Medical Care: Summon emergency medical aid prior to starting cardiac massage or artificial respiration if the heart has stopped; treat burns and related trauma strictly within personal training limits.

Contact Classifications and Supply Earthing

  • Direct Contact: Touching conductive elements that are energized under normal operating conditions (such as drilling into concealed live electrical cabling).

  • Indirect Contact: Touching exposed conductive parts (such as metallic pipework) that are normally dead but become energized during an electrical fault (typically below 230 V230\,V, though still dangerous).

  • Protective Bonding: Extraneous metallic services (gas and water) are bonded via 10 mm210\,mm^2 main protective bonding conductors back to the consumer unit earth terminal (16 mm216\,mm^2 main earthing conductor) to prevent voltage differentials in TN-S, TN-C-S, and TT supply systems.

Approved Test Equipment Requirements

  • Approved Voltage Indicator (AVI): Testing for dead must be conducted using a purpose-built AVI; neon test screwdrivers are strictly prohibited.

  • AVI Design Standards:

    • Robust, flexible, sheathed rubber cables that protect against mechanical damage and prevent finger access if loosened.

    • Integrated finger guards or barriers on both probes to prevent hand slippage.

    • Insulated probe tips with maximum 4 mm4\,mm exposed metal (preferably ≤2 mm\le 2\,mm).

    • Leads protected by integrated High Breaking Capacity (HBC/HRC) fuses rated at 500 mA500\,mA.


Approved Voltage Indicator safety dimensions and features
  • Proving Unit: A dedicated DC voltage reference source used to verify that the AVI is operational immediately before and after testing.

Safe Isolation Procedure


Safe Isolation Procedure sequence diagram
  • Sequence of Execution:

    • Step 1: Plan the job thoroughly.

    • Step 2: Unplug any connected equipment.

    • Step 3: Securely isolate the circuit or equipment.

    • Step 4: Prove the test instrument against a known voltage source (proving unit).

    • Step 5: Prove that the target circuit or equipment is dead.

    • Step 6: Re-prove the test instrument against the proving unit to confirm it functioned correctly during testing.

    • Step 7: Attach temporary earth leads if operational safety requires.

    • Step 8: Post caution and warning notices on the isolation point.

    • Step 9: Consider the necessity of additional safety precautions.

    • Step 10: Ensure complete understanding of the job before commencing work.