Surface Mine Development and Planning Guide
Introduction to Surface Mine Development
- Surface mine development is a complex and large subject requiring the integration of multiple disciplines.
- The design process involves marrying several critical factors to achieve the desired mining outcome: - Geometries of the ore body and the excavation. - Specific characteristics of both ore and waste material. - Equipment selection and capabilities. - Economics and financial feasibility.
- Strategic variations in planning depend on the mine's lifespan: - Extraction over a short time period requires a different strategy compared to operations planned for longer durations. - Mine designs must remain flexible to accommodate variations in supply and demand. - Customer requirements often impose specific constraints on potential design sets.
- Modern planning trends have incorporated: - Significant environmental requirements and operation considerations. - Advanced design aids like computer simulation for evaluating options in mine design and equipment selection, providing real-time data for decision-making. - An increasing emphasis on in-pit crushing and conveying systems for future operations.
Sequence of Mine Development
The development of a mine follows a specific sequence of twelve steps, common to both surface and underground operations, though specific activities within those steps may vary:
- Adoption of a feasibility report as the primary planning document, which remains subject to modification as the project evolves.
- Confirmation of mining methods and the general mining sequence, including the initial choice of equipment sizes and types, and workforce estimation.
- Arrangement of financing, which requires independent consultant confirmation of ore reserves and cost estimates.
- Acquisition of land and mineral rights.
- Filing of Environmental Impact Statements (EIS), obtaining mining permits, and posting bonds as required by government statutes.
- Provision of surface access, including transportation links, communication infrastructure, and power supply to the site.
- Planning and construction of the surface plant, support and service facilities, and administrative offices.
- Erection of the mineral processing plant, ore-handling and shipment facilities, and preparation for stockpiling and waste disposal.
- Acquisition of specific mining equipment for both the development and exploitation phases.
- Construction of the main opening: this involves creating the main opening to the ore body in underground mining or performing advanced stripping in surface mining to gain direct access to ore zones.
- Construction of facilities to initiate production: for underground mines (ore passes, crusher stations, transport systems); for surface mines (crusher station, water handling system, maintenance garages).
- Recruitment and training of the labor force and provision of support services (housing, medical services, consumer goods, etc.).
The Nature and Economics of Surface Mining
- Surface mines vary in form and size, but the majority of mineral products come from large-scale operations utilizing mass-production methods.
- Material Handling Magnitudes: - The volume of material handled in surface mining is significantly higher than in underground mining. - Surface coal mining ratio: . - Combined surface mining (metals, nonmetals, and coal): . - Underground coal mining ratio: . - Combined underground mining: .
- Economic Implication: Due to the high volume of waste (stripping), the cost per tonne of material in surface mines must be significantly lower than underground mining costs to maintain profitability.
- Industry Trends: Surface mining is increasing because of the difficulty in finding deposits suitable for underground mining and the continuous efficiency improvements in surface mining equipment/methods.
- The EEE Production Cycle: The success of a surface mine is dependent on an Efficient, Effective, and Economic (EEE) cycle consisting of: - Drilling. - Blasting. - Loading. - Haulage. - Auxiliary operations.
Key Planning Factors and Unique Surface Requirements
- Critical factors needing attention in surface mine preparation: - Climate: More critical than in underground mining. Cold climates at high altitudes/latitudes can hinder efficiency and cost-effectiveness. - Physical/Geologic Factors: Terrain, depth, 3-D spatial characteristics of the deposit, and the presence of water. - Environmental Costs: Surface mines have a much larger footprint, making environmental mitigation costs a primary consideration.
- Three unique steps for surface mining (requiring significant resources): 1. Initiation of a land reclamation plan as part of the Environmental Impact Assessment (EIA). 2. Provision of topsoil stockpiles and waste disposal dumps. 3. Performing advanced stripping of overburden to access the deposit.
Surface Metal Mine Development Schedule (WBS)
- Stage 1 (Years 1-2): Prospecting/Exploration: Geology, initial drilling, environmental survey and permits, and metallurgical bench tests.
- Stage 2 (Years 3-4): Feasibility Study: Geology, confirmatory drilling, access to deposit, bulk sampling, and metallurgical testing/flow sheet design.
- Continuous Activities (Years 1-11): Engineering and economic studies, environmental survey/control/permits, and administration and support.
- Stage 3 (Years 5-11): Development and Construction: Design and engineering, construction of surface facilities, pre-production stripping, environmental control, and administration.
Land Reclamation and Environmental Management
- Regulatory requirements often mandate that land be restored to its permitting condition or a better land use.
- Economic Safeguards: Companies must post sizeable bonds to cover reclamation costs. These bonds are only released once suitable vegetation is established.
- Approximate Original Contour (AOC): A requirement especially for surface coal mines to restore the land to its original shape.
- Water and Drainage Management: - Stream relocation or diversion may be necessary to preserve drainage. - Runoff control is required to prevent stream siltation and acid mine drainage.
- Biotic and Heritage Conservation: - Protecting fish and game resources and providing acceptable habitat. - Protection of archaeological sites discovered or known on the land.
Topsoil Stockpiling, Waste Disposal, and Advanced Stripping
- Material Segregation: Separate areas are designated for: - Topsoil. - Subsurface soil. - Waste rock. - Low-grade or leachable ore. - Tailings.
- Site Selection: Areas must be located for convenient disposal and retrieval but must not interfere with secondary production or auxiliary operations.
- Advanced Stripping: The geometry of the deposit and overburden, along with production rates, dictates the minimum stripping required. Stripping is typically performed only as needed, as it is an expense without immediate economic return.
Surface Mine Plant Layout
- A logical layout enhances efficiency. Key components of a typical layout (using a coal mine example) include: - Pits, waste dumps, and topsoil stockpiles located strategically. - Transport Systems: Coal haul roads, single-flight belt conveyors connecting the crusher, processing plant, slot storage, and clean coal storage. - Storage and Loading: Storage silos located on rail loops for unit train loading. - Support Facilities: Maintenance shops, administration buildings, change houses, warehouses, fuel storage, and sewage lagoons arranged in close proximity to processing centers.
Open Pit Terminology and Geometry
- Bench: A ledge forming a single level of operation. Materials are removed in successive layers (benches). Multiple benches may operate simultaneously.
- Bench Height: The vertical distance between the bench crest (highest point) and the toe. Governed by machine specifications (drills/shovels) and government regulations.
- Bench Slope: The angle (degrees) between the horizontal and the line joining the toe and crest.
- Pit Limits (Ultimate Pit Limits): The vertical and lateral extent of economic mining. Controlled primarily by the Maximum Allowable Stripping Ratio (cost of waste removal vs. ore value) and surface constraints (rivers, townships).
- Berm: A horizontal shelf left in the pit wall to enhance stability and safety. Its width and slope are determined by geotechnical configurations.
- Overall (Ultimate) Pit Slope Angle: The angle between the horizontal and an imaginary line from the top bench crest to the bottom bench toe.
- Haul Road Systems: - Spiral System: The road is arranged spirally along perimeter walls for a uniform gradient. - Zigzag (Switchback) System: The road surmounts steep grades by zigzagging, often on the footwall side.
- Angle of Repose: The maximum slope at which loose material remains stable without sliding.
- Suboutcrop Depth: The depth of waste material that must be removed before ore is exposed; also known as preproduction or advanced stripping.