Production Planning and Control – Comprehensive Notes
Perform Production Planning
Perform Production Scheduling
Refer to Section 2.2 and 3.2
Prepare Bill of Material (BOM)
Refer to Section 5.2
Carry-out Material Requirement Planning (MRP)
Refer to Sections 5.1 – 5.3
Production Planning & Control (PPC) Process
Objectives (produce right quantity/quality at right time, cheapest method)
Offer reliable delivery dates
Complete orders on time
Maximise plant & manpower utilisation
Minimise stock / WIP
Provide data for company planning
Production Planning – decides facilities, location & best usage for manufacturing
Production Control – executes the plan, monitors performance, reports variance
Common PPC Terms
Sales Forecast – future sales prediction (past sales + surveys, trends, spending)
Master Production Schedule (MPS)
When & how much of each product is required
Quantifies resources, identifies bottlenecks, drives factory activity
Material Requirement Planning (MRP) – time-phased calculation of material needs via BOM + inventory + MPS
Shop Floor Control – prioritise, track, report production orders; update labour/machine hrs
Purchasing – acquisition of raw/semi-finished materials for production
Inventory Control – supervise supply, storage, accessibility of all inventories
Capacity Requirement Planning (CRP) – determine manpower/machine/facility capacity to meet demand
Costing – allocate expenditure to stages to ascertain total cost
Bill of Material (BOM)
List of parts & qty needed, usually w/ Manufacturer Part Number (MPN)
PPC Operating Steps
Planning – select materials, methods, machines, manpower
Scheduling – decide when each operation starts/ends to hit due date
Loading – apportion work to facilities; balance required vs available capacity
Dispatching – issue works orders, route cards, job sheets, material requisitions, organise tooling; initiates production
Progressing – monitor each order vs schedule; report variance for action
Planning of Resources & Scheduling
Resource Planning
Manpower
Direct labour (operators, prod technicians)
Indirect labour (facility tech, supervisor, engineer, manager)
Facilities
Production equipment (machines, tools, jigs)
Utilities equipment (compressor, boiler, cooling tower)
Plant (building)
Inventory
Raw materials, semi-finished goods, finished goods
Time – hrs/days of operation planned per standard times & productivity
Finance – wages, material cost, machinery purchases
Production Scheduling & Loading
Scheduling definition – establish start/end times
Objective – plan sequence to complete all products by due date
Types
Master schedule – customer delivery promises
Detailed schedules – coordinate semi-finished parts between operations
Reasons for scheduling
Clarify start/end dates, minimise stock & cash outflow, maximise utilisation, satisfy customers, raise morale
Preparation inputs (forecast, commitments, resources, efficiency, absenteeism, holidays, maintenance, delivery dates, confined space, work content, methods/routes, scrap allowance, labour/machine availability)
Loading – assign work to machine/operator
Objectives: reduce waiting & idle time, inform delivery estimates, balance capacity & workload
Capacity – output per period
\text{If load}=\text{capacity}\Rightarrow\text{fully loaded}
Overload vs under-load definitions
Gantt / Machine Loading Chart
Horizontal bars = activities; length ∝ duration; left→right time flow
Advantages: visibility of activities & added load impact
Disadvantages: dependencies hard to see, complex detail problematic, minor data change causes major chart change
Sequencing
Sets job priorities at workstation; complexity grows with jobs n & machines mn! possible sequences (e.g. 3 jobs ⇒ 6 sequences; 10 jobs ⇒ 3,628,800)
Johnson’s Rule (2-machine case)
Find smallest processing time
If on Machine A ⇒ earliest slot; if on B ⇒ latest slot
Ties: choose any
Strike scheduled job, repeat until done
Requirements: only 2 machines, all jobs pass A→B, no B work before A part, processing times known
Example 1 (times in min)
Jobs 1-6: A [0.4 1.4 0.3 1.2 1.1 0.9], B [1.1 0.7 1.01 0.8 1.01 1.3]
Optimal sequence: 3-1-6-5-4-2
Example 2 sequence: 5-1-2-4-3 (additional loading diagram & idle time calculated in text)
Inventory Control & Economic Order Quantity (EOQ)
Inventory Control Basics
Maintains stock at pre-determined desirable levels
Stock classes: raw material, WIP, supplies, finished goods
Purposes
Raw material – buffer delivery disruption, volume discounts
WIP – avoid stoppage, level production during demand swings
Finished goods – buffer market fluctuation, quick service, compensate production issues
Stock Control Systems
Maximum-Minimum (Two-Bin) – fixed order quantity QTQ_1 each cycle; good admin coordination
Inventory Costs
Deterioration, Obsolescence, Storage & Insurance, Lost return on capital
Deterministic EOQ Model Assumptions
Constant known demand D
Supply arrives instantaneously
No stock-out allowed
Zero lead-time in model
All costs constant & known
Orders independent
Total Annual Cost
TC = \frac{D S}{Q} + \frac{Q I C}{2}SICQQ^* = \sqrt{\frac{2 D S}{I C}}= \frac{D}{Q^*}EOQ=60TC=\$120Q^*=1000\ \text{kg}TC=\$200EOQ=2000\ \text{units}TC=\$800C=3\$,I=25\%,S=6\$, ⇒ compute EOQ & TC (exercise)
Screws: calculate order qty, #orders, total cost (exercise)
Material, Manufacturing & Enterprise Resource Planning
MRP System
Calculates component needs & order dates (time-phased)
Inputs: BOM, Inventory records, MPS
Objectives
Minimise inventory
Maximise production efficiency
Improve customer service
Benefits: lower inventory, set-up cost, better utilisation, faster response, re-plan ability
MRP Record Fields
Period (time bucket), Planning horizon
Gross Requirements (GR)
Scheduled Receipts (SR)
Projected Available Balance (PAB)
Net Requirements
Planned Order Receipt (PORc)
Planned Order Release (PORl) = PORc shifted back by lead-time
Lot sizing: Fixed Order Qty, Lot-for-Lot (LFL)
Offsetting – back-scheduling PORl by lead-time
Bill of Material (BOM)
Single-level vs Multi-level; level codes differentiate stages; 99 % accuracy required
Independent demand (finished goods) vs Dependent (components derived)
Typical BOM problems: wrong/missing parts, wrong qty, variable qty, missing ops, ancillary items
Engineering Change urgency: immediate, by date, after stock used; implement via FPO, effective date, or component structuring
Explosion Examples
Example 1: Produce 100 A in period 8; computed orders for B,C,D,E via lead-time offset tables (see transcript tables)
Example 2: Product K with on-hand 50, M & R components; showed MRP of dependent items with scheduled receipts
Example 3: Multiple parents J & K drawing common component M; lot sizing , calculated projected balances & PORs
MRP II System
Extension of MRP; integrates capacity & financial implications; supports “what-if” simulation
Objectives – optimise service & cost across full management process (business planning → execution)
Functional Elements: Business Planning, Master Production Planning, MRP, CRP (all linked)
Planning record shows periods 1-10 with GR, SR, PAB, NR, PORc, PORl
ERP System
Enterprise-wide integrated information system (SAP, Oracle, SSA, Microsoft)
Covers manufacturing, order entry, GL, purchasing, warehousing, HR, etc.
Objectives: improve service, competitiveness, automate solutions, raise efficiency, reduce waste, modernise processes
Advantages: higher quality & efficiency, decision support, agility, flexibility
Disadvantages: customisation issues, process re-engineering risk, high cost & vendor lock-in, data-sharing resistance, integration dependency, heavy training
Tutorials & Practice Problems (Section 28–29)
Build product structure trees & BOMs for given parent/child relationships (products A, X, M, Y, Z)
Identify BOM inaccuracies (list any 4)
Complete MRP record for Item W with on-hand 20, LFL policy, lead-time 1 week, component items B–E with given policies
Johnson sequencing for Shaping & Grinding jobs A–F
(i) Determine optimal sequence
(ii) Draw bar (Gantt) chart using
(iii) Compute throughput time
(iv) Compute total idle time
EOQ exercise: stationery,
Calculate (nearest unit), order frequency, total inventory cost
These bullet-point notes capture every major & minor concept, numerical reference, equation, example and implication presented in the transcript. They can stand alone as a comprehensive study guide for Production Planning & Control, Scheduling, Inventory Management, and ERP-related systems.