Comprehensive Waste Management Implementation and Regulatory Compliance Guide to Compliance

Implementation Record and Waiver Regulatory Requirements

  • The jurisdiction's program description document must satisfy clear regulatory callouts, specifically detailing the process for issuing waivers and the frequency of inspections to verify waiver validity.

  • Waiver Validity and Inspections:

    • While waivers are typically valid for a period of five years, regulations require the jurisdiction to verify the validity through an inspection.

    • Inspections should be conducted upon the receipt of a renewed waiver application or when a waiver is set to expire.

    • The documentation must explicitly state the relationship between the inspection process and the verification of the waiver.

    • Reference: Article 3, Waivers Granted by Jurisdiction, specifically the record-keeping requirements for waivers and exemptions.

  • Administrative Consistency: For cities utilizing Edco as a service provider, the inspection is usually performed by Edco when the waiver is up for renewal.

Container Contamination Minimization

  • Defining Contamination Levels: Jurisdictions must establish a threshold for what constitutes container contamination within their route review process.

  • Edco Standard: The suggested standard is that any observed level of contamination constitutes contamination.

  • Process Documentation: The program description should include a specific sentence defining this level, such as "any observed contamination or any level of contamination constitutes contamination."

  • Route Reviews: This definition is a critical component of the contamination minimization section of the implementation record.

Procurement of Recovered Organic Waste Products

  • Target Products: The jurisdiction explores several pathways for procurement, including renewable natural gas (RNG), compost, and mulch.

  • Renewable Natural Gas (RNG):

    • RNG is processed at the Anaerobic Digestion (AD) facility located in Escondido.

    • The gas is injected into the utility grid and credited as renewable natural gas.

    • Documentation regarding RNG procurement falls under a direct service provider agreement via a Memorandum of Understanding (MOU) with Edco.

  • Compost and Mulch:

    • Jurisdictions must specify how these products are used, such as through direct use on street medians or community giveaways.

    • If monthly giveaways are conducted, the origin of the mulch (typically Edco) must be documented.

  • Refining Procurement Descriptions: It is recommended to build out this section with specific blurbs from Edco regarding processing details at the AD facility to provide sufficient detail for regulatory audits.

Paper Procurement and Record-Keeping Standards

  • Record-Keeping Requirements: To meet SB 1383 requirements, jurisdictions must track the following for all paper products:

    • The date products were ordered or received (invoice date).

    • The quantity or volume of the products.

    • The specific type of paper product (printing and writing paper).

    • Documentation of whether the products met recycled content and recyclability requirements.

  • Staples Vendor Certification:

    • Staples has the capability to generate a spreadsheet that serves as a "one-stop shop" for record-keeping.

    • This spreadsheet identifies item descriptions, quantities, and whether items meet post-consumer recycled content and recyclability standards.

    • Utilizing this spreadsheet significantly reduces the administrative burden of uploading individual receipts and invoices.

  • Compliance Challenges and Strategies:

    • If a vendor like Staples fails to provide the requested spreadsheet, jurisdictions must document their attempts (emails or phone logs) to show a "good faith effort."

    • In the interim, jurisdictions must manually input invoice data into a tracking spreadsheet for the implementation record.

    • Recyclability claims are supported by referencing the AB 343 or SB 343 waste characterization study data.

  • Note Section Usage: If a product does not meet requirements, the notes section should explain why, such as when recycled content products were not available at an equal or lesser cost.

Anonymous Complaint Procedures

  • Regulatory Requirement: There is a strict regulatory requirement that jurisdictions must be able to receive complaints regarding waste compliance anonymously.

  • Documentation Update: The program description must explicitly use the word "anonymous" to state that complainants are able to submit reports without providing identifying information.

Construction and Demolition (C&D) and CalGreen

  • Jace Review Scope: The compliance review (Jace review) includes an evaluation of Construction and Demolition waste management.

  • CalGreen Requirements: Jurisdictions must have a C&D ordinance in place and adhere to specific reporting requirements mandated by the state.

Administrative Timeline and Communication

  • Next Conference Call: A call is tentatively planned for early November to facilitate an overlap with new staff members.

  • Staffing Transitions: New Local Assistance and Market Development (LAMT) staff are expected to be assigned towards the end of the year or in January of the following year.

  • Upcoming Training: A chat with CalRecycle regarding SB 1383 requirements is tentatively scheduled for September 15th to provide further clarity on procurement and record-keeping.

Questions & Discussion

  • Question: Does the jurisdiction need to inspect when someone first applies for a waiver, or just for renewals?

  • Response: The regulation requires a description of the frequency of inspections to verify validity. Adding language that an inspection occurs upon the receipt of a renewed waiver (typically every five years) satisfies the requirement for a defined frequency.

  • Question: How do jurisdictions handle the massive volume of paper receipts if the vendor doesn't provide a summary spreadsheet?

  • Response: Focus on the largest purchases first to establish compliance documentation. Document the difficulty in obtaining the vendor certification and include correspondence with the vendor as evidence of efforts to comply.

  • Question: To what extent does the Jace review look into C&D?

  • Response: It primarily ensures that the local ordinance is in place and that the jurisdiction is meeting the reporting requirements for CalGreen as specified in the regulations.