ExecuJet MRO Services Malaysia Maintenance Organisation Exposition Notes

Maintenance Organisation Exposition (MOE) Overview and Official Acceptance

  • Authority Approval Reference: CAAM/AW/AMO/2016/12, dated 15 March 2024.

  • Organisation Information: ExecuJet MRO Services Malaysia Sdn. Bhd, located at Sultan Abdul Aziz Shah Airport, Selangor Darul Ehsan, Malaysia.

  • Official Acceptance: The Civil Aviation Authority of Malaysia (CAAM) accepted Maintenance Organisation Exposition reference: EJMA-MOE-CAAM, Issue 04, Revision 01, dated 08 February 2024.

  • Key Personnel (Document Control):

    • Compiled By: Aneth Athea Mat Som (Assistant Manager-Compliance).

    • Internally Approved By: Mohd Shahir Ahmad (Compliance Manager).

  • Confidentiality Clause: The document is proprietary and cannot be reproduced or transmitted without express written permission from the President of ExecuJet MRO Services.

Document Control and Revision History

  • Manual Structure: Segregated into Part 0 (Introduction), Part 1 (Management), Part 2 (Maintenance Procedures), Part L2 (Line Maintenance), Part 3 (Quality System), Part 4 (Operator Procedures), Part 5 (Sample Documents), and Annexes.

  • Revision Status:

    • Issue 3, Revision 0: 22 October 2019 (Major revision).

    • Issue 4, Revision 1: 08 February 2024 (Major revision including company logo change and transition from "Manual" to "Publication").

  • Major Changes in Issue 4 Rev 01:

    • Transition to electronic distribution for MOE (hardcopy only for CAAM).

    • Inclusion of Regional Vice President - Asia and General Manager - Technical Services roles.

    • Implementation of the Q-Pulse system for document management and Corridor system for logistics and tooling.

    • Establishment of a new facility (Location 2).

    • Updated staff counts (Total: 58 personnel).

Comprehensive Definitions and Acronyms

  • AAT: Airworthiness Approval Tag.

  • CDCCL: Critical Design Configuration Control Limitation.

  • Standard Part: Parts manufactured in complete compliance with established industry/government specifications (e.g., NAS, AN, SAE, ANSI, EN). Specifications must be published for any party to manufacture.

  • Consumables: Materials used only once, such as lubricants, cements, compounds, paints, chemicals, dyes, and sealants.

  • Raw Materials: Materials requiring further work to become aircraft components (e.g., metals, plastics, wood, fabric).

  • Accident: An occurrence where a person is fatally or seriously injured (direct contact, jet blast, or being in a missing/inaccessible aircraft) or the aircraft sustains structural damage affecting flight characteristics.

  • Incident: An occurrence other than an accident that affects or could affect flight safety.

  • Rotable: Serial numbered parts tracked for life control (hard life or condition monitored).

  • Expendable: Items for which no authorized repair procedure exists or repair costs exceed replacement costs.

Management Structure and Personnel Responsibilities

  • Nominated Post Holders:

    • Accountable Manager: Ivan Lim Wah Teik (Regional Vice President - Asia).

    • Compliance Manager (Quality & Safety): Mohd Shahir bin Ahmad.

    • General Manager (GM) Maintenance: Suniljit Singh.

  • Accountable Manager Duties:

    • Reporting to the President of ExecuJet MRO Services.

    • Ensuring maintenance meets CAAM standards.

    • Ensuring necessary finance, manpower, and facilities are available.

    • Supervising corrective actions and overall quality results.

  • Compliance Manager Duties:

    • Establishing an independent quality assurance system.

    • Defining Human Factors principles and training.

    • Managing the qualification and authorization of certifying and support staff.

    • Reporting major failures or defects to CAAM, operators, and manufacturers.

  • GM Maintenance Duties:

    • Developing production planning systems.

    • Maintaining man-hour plans and ensuring facility availability.

    • Ensuring tools and equipment used for airworthiness are calibrated.

  • Interim Policy: If a manager is absent for more than 1010 consecutive working days, a formal deputy must be announced via memo/fax/email.

Manpower and Resource Allocation

  • Total Personnel Count (February 2024): 58 staff members.

  • Departmental Breakdown:

    • Management: 1 Accountable Manager.

    • Maintenance: 3 Managers/Supervisors, 35 Certifying/Support Staff and Technicians.

    • Compliance: 4 Auditors (Part 145 & SMS).

    • Supply Chain: 2 Managers/Supervisors, 2 Receiving Inspectors, 2 Tools/Store, 2 Purchasers.

    • Planning: 3 Managers/Supervisors, 4 Planners/Technical Records.

  • Reporting Requirements: Any significant shortfall (exceeding 25%25\% of available man-hours over a calendar month) must be reported to the Accountable Manager and Compliance Manager.

Facility Requirements and Environmental Standards

  • Location 1 (Skypark Hangar A & B):

    • Hangar A Area: 35445.5SQFT35445.5\,SQFT with 8.8M8.8\,M clearance.

    • Hangar B Area: 32657.7SQFT32657.7\,SQFT with 8.8M8.8\,M clearance.

  • Location 2 (ExecuJet New Hangar):

    • Area: 143917.45SQFT143917.45\,SQFT with 10M10\,M clearance.

  • Work Environment Requirements:

    • Temperature: Must be maintained to not affect worker efficiency.

    • Dust Control: Surface contamination must be visible; if found, exposed systems must be sealed.

    • Lighting: Fluorescent/LED lighting required for effective maintenance.

    • Noise: Protective equipment (earmuffs/earplugs) must be used if noise affects duties.

    • Storage: Multi-zone stores including Goods Receiving, Dispatch, Serviceable, Bonded/Quarantine, and Consumables.

  • Workshops: Dedicated Battery Shop (Ni-Cad and Lead Acid) and Tire Shop.

Approved Scope of Work

  • Ratings:

    • A1 Aircraft:

      • Bombardier BD-100-1A10 (Challenger 300/350) up to 9600H/192M.

      • Bombardier BD-700 (Global Express/5000/6000) up to 8C.

      • Bombardier CL-600-2B16 (Challenger 604/605/650) up to 96M.

      • Gulfstream G-IV / IV-X up to 120M.

      • Dassault Falcon 7X/8X up to 3C.

      • Falcon 2000EX EASy up to C/72M/3750FH.

    • C5/C14 Components: Electrical Power, Lights, and Landing Gear (limited via EJMA-CP-CLM-CAAM).

  • Maintenance Away from Approved Location: Permitted for AOG support of unserviceable aircraft or occasional line maintenance if a contract exists.

/Supplier, Contractor, and Subcontractor Control

  • Definitions:

    • Supplier: Provides parts/materials with suitable release documentation.

    • Contractor: Holds CAAM Part 145 approval; performs maintenance under its own approval for EJMA.

    • Subcontractor: Not Part 145 approved; works under EJMA's quality system (e.g., specialized welding, painting).

  • Assessment Methods:

    • Contractor: Desktop Audit every 2424 months.

    • Subcontractor: On-site Audit every 1212 months.

    • Suppliers: Desktop audit or ISO 17025 review every 2424 months.

  • One-Off Providers: Approved on a case-by-case basis by the Compliance Manager using EJMA-CP-21.

Component and Material Management

  • Acceptance Criteria: Components must be released on a CAAM Form 1 or acceptable alternatives (FAA 8130-3, TCCA Form One, EASA Form 1, UK CAA Form 1).

  • Receiving Inspection:

    • Verification of physical condition, packaging (e.g., ATA 300), and shelf life.

    • Documents verified against Purchase Orders.

    • Electronic items handled only as per ESD precautions.

  • Bogus Parts: Suspected Unapproved Parts (SUP) must be reported to CAAM as Mandatory Occurrences.

  • Storage Policies:

    • Bonded Store: Dedicated for serviceable and rotable parts.

    • Quarantine Cage: Secured for unserviceable or non-conforming items.

    • Environment: Main store monitored for temperature and humidity weekly; refrigerators and POL cabinets daily.

  • Mutilation of Scrap: Unsalvageable parts must be mutilated (grinding, burning, sawing) to prevent re-entry into the supply chain.

Tooling and Equipment Control

  • Calibration Standards: Tools used for airworthiness determination (e.g., torque wrenches, pressure gauges) must be calibrated according to ISO 10012 or OEM standards.

  • Tool Register: Managed via the Corridor computer system, tracking ID, description, serial number, and calibration due dates.

  • Uncertainty/Failure Management: If a tool fails calibration, the Compliance Manager and Planning Department must review all work performed with that tool during the previous period for potential product recalls.

  • Alternate Tooling: Permitted only if the OEM allows it. An equivalency assessment (EJMA-MN-09) must be approved by the Compliance Manager.

  • Missing Tools: Report immediately using EJMA-SC-01. A search and stop-work order may be issued until the tool is located.

Maintenance Procedures and Certification

  • Critical Maintenance Tasks: Tasks that could directly endanger flight safety if an error occurs (e.g., flight control rigging, engine installation).

    • Error Capturing Method: Requires Independent Inspection by an unauthorized person or Re-inspection in unforeseen circumstances (AOG).

  • Release to Service (CRS):

    • Must contain the statement: "The work recorded above has been carried out in accordance with… Malaysian Civil Aviation Regulations… and in that respect the aircraft/equipment is considered fit for release to service."

    • Includes location, date, organization approval number, and the signature/stamp of the authorized Certifying Staff.

  • Airworthiness Directives (AD): Mandatory compliance. A CRS cannot be issued if an AD is overdue. Repetitive ADs must be tracked in the technical logbook.

  • Work Package Contents: Includes Work Order, Routine Task Cards, Non-Routine Task Cards, Tool/Signature Verification Sheet, and Release Certificate.

Reporting and Quality Feedback

  • Mandatory Occurrence Reporting (MOR): Occurrences resulting in unsafe conditions must be reported to CAAM within 4848 hours of the finding.

  • Internal Occurrence Report (IOR): Promotes a "Just Culture," protecting staff from blame for honest errors while ensuring accountability for willful violations.

  • Audit Findings:

    • Level 1: Serious hazard; operations must cease until corrected.

    • Level 2: Non-compliance that could hazard safety.

    • Level 3: Observed condition demonstrating systematic non-observance of procedures.

  • Safety Management System (SMS) Meeting: Conducted monthly to review safety issues, occurrences, and audit statuses.

Personnel Training and Qualification (Annex 1)

  • Initial Training Requirements: Includes HF (Human Factors), EWIS (Electrical Wiring Interconnect System), FTS/CDCCL (Fuel Tank Safety), SMS (Safety Management System), Part 145 regulations, and Dangerous Goods.

  • Continuation Training: Mandatory every 22 years for all maintenance and support staff.

  • Engine Run-up/Towing: Requires specific OJT (33 sessions minimum) and documented practical assessments.