ExecuJet MRO Services Malaysia Maintenance Organisation Exposition Notes
Maintenance Organisation Exposition (MOE) Overview and Official Acceptance
Authority Approval Reference: CAAM/AW/AMO/2016/12, dated 15 March 2024.
Organisation Information: ExecuJet MRO Services Malaysia Sdn. Bhd, located at Sultan Abdul Aziz Shah Airport, Selangor Darul Ehsan, Malaysia.
Official Acceptance: The Civil Aviation Authority of Malaysia (CAAM) accepted Maintenance Organisation Exposition reference: EJMA-MOE-CAAM, Issue 04, Revision 01, dated 08 February 2024.
Key Personnel (Document Control):
Compiled By: Aneth Athea Mat Som (Assistant Manager-Compliance).
Internally Approved By: Mohd Shahir Ahmad (Compliance Manager).
Confidentiality Clause: The document is proprietary and cannot be reproduced or transmitted without express written permission from the President of ExecuJet MRO Services.
Document Control and Revision History
Manual Structure: Segregated into Part 0 (Introduction), Part 1 (Management), Part 2 (Maintenance Procedures), Part L2 (Line Maintenance), Part 3 (Quality System), Part 4 (Operator Procedures), Part 5 (Sample Documents), and Annexes.
Revision Status:
Issue 3, Revision 0: 22 October 2019 (Major revision).
Issue 4, Revision 1: 08 February 2024 (Major revision including company logo change and transition from "Manual" to "Publication").
Major Changes in Issue 4 Rev 01:
Transition to electronic distribution for MOE (hardcopy only for CAAM).
Inclusion of Regional Vice President - Asia and General Manager - Technical Services roles.
Implementation of the Q-Pulse system for document management and Corridor system for logistics and tooling.
Establishment of a new facility (Location 2).
Updated staff counts (Total: 58 personnel).
Comprehensive Definitions and Acronyms
AAT: Airworthiness Approval Tag.
CDCCL: Critical Design Configuration Control Limitation.
Standard Part: Parts manufactured in complete compliance with established industry/government specifications (e.g., NAS, AN, SAE, ANSI, EN). Specifications must be published for any party to manufacture.
Consumables: Materials used only once, such as lubricants, cements, compounds, paints, chemicals, dyes, and sealants.
Raw Materials: Materials requiring further work to become aircraft components (e.g., metals, plastics, wood, fabric).
Accident: An occurrence where a person is fatally or seriously injured (direct contact, jet blast, or being in a missing/inaccessible aircraft) or the aircraft sustains structural damage affecting flight characteristics.
Incident: An occurrence other than an accident that affects or could affect flight safety.
Rotable: Serial numbered parts tracked for life control (hard life or condition monitored).
Expendable: Items for which no authorized repair procedure exists or repair costs exceed replacement costs.
Management Structure and Personnel Responsibilities
Nominated Post Holders:
Accountable Manager: Ivan Lim Wah Teik (Regional Vice President - Asia).
Compliance Manager (Quality & Safety): Mohd Shahir bin Ahmad.
General Manager (GM) Maintenance: Suniljit Singh.
Accountable Manager Duties:
Reporting to the President of ExecuJet MRO Services.
Ensuring maintenance meets CAAM standards.
Ensuring necessary finance, manpower, and facilities are available.
Supervising corrective actions and overall quality results.
Compliance Manager Duties:
Establishing an independent quality assurance system.
Defining Human Factors principles and training.
Managing the qualification and authorization of certifying and support staff.
Reporting major failures or defects to CAAM, operators, and manufacturers.
GM Maintenance Duties:
Developing production planning systems.
Maintaining man-hour plans and ensuring facility availability.
Ensuring tools and equipment used for airworthiness are calibrated.
Interim Policy: If a manager is absent for more than consecutive working days, a formal deputy must be announced via memo/fax/email.
Manpower and Resource Allocation
Total Personnel Count (February 2024): 58 staff members.
Departmental Breakdown:
Management: 1 Accountable Manager.
Maintenance: 3 Managers/Supervisors, 35 Certifying/Support Staff and Technicians.
Compliance: 4 Auditors (Part 145 & SMS).
Supply Chain: 2 Managers/Supervisors, 2 Receiving Inspectors, 2 Tools/Store, 2 Purchasers.
Planning: 3 Managers/Supervisors, 4 Planners/Technical Records.
Reporting Requirements: Any significant shortfall (exceeding of available man-hours over a calendar month) must be reported to the Accountable Manager and Compliance Manager.
Facility Requirements and Environmental Standards
Location 1 (Skypark Hangar A & B):
Hangar A Area: with clearance.
Hangar B Area: with clearance.
Location 2 (ExecuJet New Hangar):
Area: with clearance.
Work Environment Requirements:
Temperature: Must be maintained to not affect worker efficiency.
Dust Control: Surface contamination must be visible; if found, exposed systems must be sealed.
Lighting: Fluorescent/LED lighting required for effective maintenance.
Noise: Protective equipment (earmuffs/earplugs) must be used if noise affects duties.
Storage: Multi-zone stores including Goods Receiving, Dispatch, Serviceable, Bonded/Quarantine, and Consumables.
Workshops: Dedicated Battery Shop (Ni-Cad and Lead Acid) and Tire Shop.
Approved Scope of Work
Ratings:
A1 Aircraft:
Bombardier BD-100-1A10 (Challenger 300/350) up to 9600H/192M.
Bombardier BD-700 (Global Express/5000/6000) up to 8C.
Bombardier CL-600-2B16 (Challenger 604/605/650) up to 96M.
Gulfstream G-IV / IV-X up to 120M.
Dassault Falcon 7X/8X up to 3C.
Falcon 2000EX EASy up to C/72M/3750FH.
C5/C14 Components: Electrical Power, Lights, and Landing Gear (limited via EJMA-CP-CLM-CAAM).
Maintenance Away from Approved Location: Permitted for AOG support of unserviceable aircraft or occasional line maintenance if a contract exists.
/Supplier, Contractor, and Subcontractor Control
Definitions:
Supplier: Provides parts/materials with suitable release documentation.
Contractor: Holds CAAM Part 145 approval; performs maintenance under its own approval for EJMA.
Subcontractor: Not Part 145 approved; works under EJMA's quality system (e.g., specialized welding, painting).
Assessment Methods:
Contractor: Desktop Audit every months.
Subcontractor: On-site Audit every months.
Suppliers: Desktop audit or ISO 17025 review every months.
One-Off Providers: Approved on a case-by-case basis by the Compliance Manager using EJMA-CP-21.
Component and Material Management
Acceptance Criteria: Components must be released on a CAAM Form 1 or acceptable alternatives (FAA 8130-3, TCCA Form One, EASA Form 1, UK CAA Form 1).
Receiving Inspection:
Verification of physical condition, packaging (e.g., ATA 300), and shelf life.
Documents verified against Purchase Orders.
Electronic items handled only as per ESD precautions.
Bogus Parts: Suspected Unapproved Parts (SUP) must be reported to CAAM as Mandatory Occurrences.
Storage Policies:
Bonded Store: Dedicated for serviceable and rotable parts.
Quarantine Cage: Secured for unserviceable or non-conforming items.
Environment: Main store monitored for temperature and humidity weekly; refrigerators and POL cabinets daily.
Mutilation of Scrap: Unsalvageable parts must be mutilated (grinding, burning, sawing) to prevent re-entry into the supply chain.
Tooling and Equipment Control
Calibration Standards: Tools used for airworthiness determination (e.g., torque wrenches, pressure gauges) must be calibrated according to ISO 10012 or OEM standards.
Tool Register: Managed via the Corridor computer system, tracking ID, description, serial number, and calibration due dates.
Uncertainty/Failure Management: If a tool fails calibration, the Compliance Manager and Planning Department must review all work performed with that tool during the previous period for potential product recalls.
Alternate Tooling: Permitted only if the OEM allows it. An equivalency assessment (EJMA-MN-09) must be approved by the Compliance Manager.
Missing Tools: Report immediately using EJMA-SC-01. A search and stop-work order may be issued until the tool is located.
Maintenance Procedures and Certification
Critical Maintenance Tasks: Tasks that could directly endanger flight safety if an error occurs (e.g., flight control rigging, engine installation).
Error Capturing Method: Requires Independent Inspection by an unauthorized person or Re-inspection in unforeseen circumstances (AOG).
Release to Service (CRS):
Must contain the statement: "The work recorded above has been carried out in accordance with… Malaysian Civil Aviation Regulations… and in that respect the aircraft/equipment is considered fit for release to service."
Includes location, date, organization approval number, and the signature/stamp of the authorized Certifying Staff.
Airworthiness Directives (AD): Mandatory compliance. A CRS cannot be issued if an AD is overdue. Repetitive ADs must be tracked in the technical logbook.
Work Package Contents: Includes Work Order, Routine Task Cards, Non-Routine Task Cards, Tool/Signature Verification Sheet, and Release Certificate.
Reporting and Quality Feedback
Mandatory Occurrence Reporting (MOR): Occurrences resulting in unsafe conditions must be reported to CAAM within hours of the finding.
Internal Occurrence Report (IOR): Promotes a "Just Culture," protecting staff from blame for honest errors while ensuring accountability for willful violations.
Audit Findings:
Level 1: Serious hazard; operations must cease until corrected.
Level 2: Non-compliance that could hazard safety.
Level 3: Observed condition demonstrating systematic non-observance of procedures.
Safety Management System (SMS) Meeting: Conducted monthly to review safety issues, occurrences, and audit statuses.
Personnel Training and Qualification (Annex 1)
Initial Training Requirements: Includes HF (Human Factors), EWIS (Electrical Wiring Interconnect System), FTS/CDCCL (Fuel Tank Safety), SMS (Safety Management System), Part 145 regulations, and Dangerous Goods.
Continuation Training: Mandatory every years for all maintenance and support staff.
Engine Run-up/Towing: Requires specific OJT ( sessions minimum) and documented practical assessments.